Laserfiche WebLink
Yes No Maybe <br />8. LAND USE - Will the proposed project result <br />in: <br />a. Substantial alteration of the present <br />or planned use of an area? X <br />DISCUSSION: Not applicable. <br />MITIGATION MEASURES: Not applicable. <br />Yes No Maybe <br />9. NATURAL RESOURCES - Will the proposed <br />project result in: <br />a. Increases in the rate of use of any <br />natural resources? X <br />b. Substantial depletion of any non- <br />renewable natural resource? X <br />DISCUSSION: Increased traffic on-site would cause an increase <br />in fuel usage. However, earlier than scheduled site closure <br />would negate any interim increase in fuel usage. <br />MITIGATION MEASURES: No mitigation necessary. <br />Yes No Maybe <br />10. RISK OF UPSET - Will the proposed project <br />result in: <br />a. A risk of an explosion or the release <br />of hazardous substances in the event <br />of an accident or upset conditions? X <br />b. Possible interference with an emergency <br />response plan or an emergency evacua- <br />tion plan? X <br />DISCUSSION: No risk of upset is expected due to the types of <br />solid waste processed at the landfill. <br />MITIGATION MEASURES: No mitigation is necessary. <br />Pi <br />