My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
2300 - Underground Storage Tank Program
>
PR0231487
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2021 11:48:48 AM
Creation date
2/3/2021 9:32:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231487
PE
2351
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
01
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
auiN <br />SAN JOAQUIN <br />COUNTY <br />Greatness grows here. <br />Environmental Health Department <br />OFFICIAL INSPECTION REPORT <br />FACILITY NAME/TYPE: ARCO <br />DATE: 10/1/2021 <br />ADDRESS: 1329 Escalon <br />CITY: Escalon, CA <br />ZIP CODE: 95320 <br />OWNER/OPERATOR: Gurpreet Randhawa <br />TELEPHONE #: 209-838-7579 <br />TYPE OF INSPECTION: ❑ COMPLAINT ❑CONSULTATION W OTHER <br />PROGRAM 2351 <br />ELEMENT: <br />ORD PR0231487 <br />TID <br />NATURE OF COMPLAINT/CONSULTATION: <br />On-site to witness overfill testing re -test for failed overfill. <br />OBSERVATIONS/COMMENTS: <br />Witnessed overfill testing for audible/visual overfill prevention equipment. Verified 90% calculations with appropriate tank <br />charts. Observed both overfills alarms with visual lights and made audible alarms at 90%. Verified ball floats were <br />not observed. Tank is set up at 90% overfill and 95% high product. <br />Service Technician: Christopher Bishop <br />ICC: 4/17/2023, VR: 9/3/2022 <br />CORRECTIVE ACTIONS: <br />Please ensure overfill equipment prevention test report is submitted to EHD within 30 days of testing. <br />CORRECT BY: Within 30 days <br />INSPECTED BY: Carol Presto <br />RECEIVED BY: emailed to Gurpreet Randhawa <randhawa.ampm@gmail.com> <br />DATE: 10/1/2021 <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 <br />EHD 48-05 Rev. 05/21/18 <br />www.sjcehd.com <br />INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.