Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6 . OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 <br /> Are both vent and tank riser piping ® Yes ® Yes Yes © Yes <br /> secondarily contained ? No 0 No No No <br /> OPE Model <br /> What is the OPE response when ® Shut off rl Shut off © Shut off ® Shut off <br /> activated ? Flow Flow Flow Flow <br /> (Check all that apply. ) © Restricts © Restricts © Restricts © Restricts <br /> Flow Flow Flow Flow <br /> ® Audible N Audible ® Audible rl Audible <br /> Alarm Alarm Alarm Alarm <br /> Visual ® Visual © Visual ® Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping © Yes * rl Yes * © Yes * © Yes * <br /> that may interfere with the OPE operation ? ® No ® No © No © No <br /> At what level in the tank is the OPE set to <br /> 100 . 00 " 76 . 75 " <br /> activate ? Inches from bottom of tank) <br /> What is the percent capacity of the tank at 90 % 90 % <br /> which the OPE activates ? <br /> Is the OPE in proper operating condition to ® Yes K Yes* rl Yes * rl Yes * <br /> respond when the stored substance ® No ® No © No rl No <br /> reaches the designated regulatory level ? <br /> 7 . SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ® Pass ® Pass © Pass ® Pass <br /> ® Fail © Fail M Fail ® Fail <br /> 8 , COMMENTS <br /> Describe all answers marked "No " or "Fail" and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> NO FLOW RESTRICTORS ON SITE . <br /> * Mark here if: <br /> ® Flow restrictors interfere with overfill prevention and equipment repairs required . <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s) , measurements, calculations, and In - Tank Setup report(s) <br /> Page 2 of 2 <br />