My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10715
>
2300 - Underground Storage Tank Program
>
PR0541281
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 8:47:15 AM
Creation date
2/3/2021 11:19:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0541281
PE
2361
FACILITY_ID
FA0023650
FACILITY_NAME
Trinity Parkway AMPM ARCO #83819
STREET_NUMBER
10715
STREET_NAME
TRINITY
STREET_TYPE
Pkwy
City
Stockton
Zip
95219
APN
6602002
CURRENT_STATUS
01
SITE_LOCATION
10715 Trinity Pkwy
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o?Ru?k [ <br /> .a SAN JOAQUIN COUNTY <br /> y { ENVIRONMENTAL HEALTH DEPARTMENT <br /> 1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br /> ��CFpp�a�P Telephone: (209) 468-3420 Fax: (209)464-3433 Web:www.sjgov.org/ehd <br /> OFFICIAL INSPECTION REPORT <br /> FACILITY NAME/TYPE: Trinity Parkway AMPM ARCO #83819 DATE: May 20, 2021 <br /> ADDRESS: 10715 Trinity Pkwy CITY: Stockton z CODE: 95219 <br /> OWNER/OPERATOR: Trinity Parkway, INC TELEPHONE#: 209-477-5530 <br /> TYPE OF INSPECTION: ElCOMPLAINT ElCONSULTATION NOTHER ELEMENT:PROGRAM 2361 ID#:RECORD PR0541281 <br /> NATURE OF COMPLAINT/CONSULTATION: <br /> On site for triennial overfill prevention testing. <br /> OBSERVATIONS/COMMENTS: <br /> CERS lists A/V alarms as overfill prevention method. Flappers are being used as the overfill <br /> prevention method. Facility updated CERS submittal while on site with correct overfill prevention <br /> method. EHD did not witness entire overfill prevention equipment testing. <br /> Tech: Rhome Desbiens <br /> ICC Tech: 12/10/2022 <br /> OPW: 5/8/2022 <br /> CORRECTIVE ACTIONS: <br /> N/A <br /> CORRECT BY: N/A <br /> INSPECTED BY: <br /> RECEIVED BY: DATE: <br /> EHD 48-05 Rev.04/19/12 INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.