My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
1002
>
2300 - Underground Storage Tank Program
>
PR0231604
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2023 4:46:10 PM
Creation date
2/3/2021 2:42:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231604
PE
2361
FACILITY_ID
FA0000650
FACILITY_NAME
GAS & SHOP
STREET_NUMBER
1002
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102012
CURRENT_STATUS
01
SITE_LOCATION
1002 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities <br /> • inspect and reinstall all containment sump <br /> If the water level changes 1/8(0.125)inch or great- <br /> lids, gaskets and covers. er, the containment sump fails the integrity test. <br /> 6.5.7 Pass/Fail Criteria. If the water level 6.6 Accelerated Precision Hydrostatic Test for Spill <br /> µ changes less than 1/8 (0.125)inch. the containment Buckets and Containment Sumps. Electronic preci- <br /> sump passes the integrity test. sion test equipment can be utilized to test spill buckets <br /> and containment sumps. It incorporates more sensitive <br /> equipment that A <br /> _ permits a test to b.,conducted in a shorter <br /> _ period of time.The procedures use the same text fluid and <br /> _ - tests the same volume as other methods outlined in this <br /> = chapter.The manufacturer of the measurement equipment <br /> should specify the precision and duration of the test and <br /> the pass/fail criteria. However, pass/fail criteria should <br /> not be less stringent than those prescribed for the 1-hour <br /> test in Section 6.5.7. <br /> - The data sheet for Sections 6.2 or 6.5 may be used for this <br /> test. Refer to Appendix D. <br /> 6.7 Proper Disposal of Test Liquids. Test liquids <br /> must be disposed of properly. Check with the AHJ <br /> regarding requirements for proper disposal. <br /> FIGURE 6-7. The test fluid level in the tank sump must <br /> be at least 4 inches above the highest sump penetra- <br /> tion or sidewall seam. <br /> 7. UST OVERFILL EQUIPMENT <br /> VERIFICATION9 INSPECTION <br /> : AND TESTING <br /> N <br /> Although the effectiveness of overfill prevention devices <br /> can be tested by attempting to overfill a UST with <br /> product and determining how well the device functions, <br /> this approach is not recommended. Any malfunction in <br /> the overfill prevention device could result in a product <br /> release that could result in a threat to public health and <br /> safety and environmental damage. <br /> Federal UST rules require that overfill prevention equip- <br /> ment automatically restrict flow or alert the transfer <br /> operator when the tank is no more than 90 percent full <br /> or shut off flow into a tank when it is no more than 95 <br /> percent full. Other alternatives to prevent overfills are the <br /> restriction of flow during a delivery 30 minutes prior to <br /> overfilling; alerting the operator 1 minute before overfill- <br /> ing may occur, or automatically shutting off flow into a <br /> tank so that none of the fittings located on top of the tank <br /> are exposed to product due to overfilling. <br /> The committee has written the recommended practices <br /> FIGURE 6-8. Measuring sticks used to measure the for automatic shutoff devices to reflect that the devices <br /> water level should be securely mounted to ensure that must be set to shut off flow when the tank is no more <br /> they do not move during the test. than 95 percent full, and flow restriction and overfill <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.