PLUMBING FIXTURE SCHEDULE
<br />MARK
<br />MAKE/MODEL
<br />TRIM
<br />ACCESSORIES
<br />WC -1
<br />KOHLER K-3609
<br />1.28 GPF 17' ADA TANK TYPE ELONGATED WATER CLOSET,
<br />BENEKE 523 ELONGATED
<br />---- HW
<br />HOT WATER LINE
<br />495-2121-00 POLISHED CHROME HANDLE, BRASSCRAFT KTSRI7FC
<br />SEAT, NON LOCKING
<br />TD
<br />TRENCH DRAIN
<br />STOP, B1-12DLF HOSE, WAX RING, RIGHT HAND 12'RI, LOOSE KEY,
<br />COVER, RI PER ADA
<br />GAS COCK
<br />SS
<br />COLOR BY ARCHITECT.
<br />REQT'S
<br />L-1
<br />KOHLER K-2005
<br />WALL HUNG LAVATORY, ZURN Z6915 -XL -F 0.5 GPM WF FAUCET, ZURN
<br />RI PER ADA
<br />FINISHED FLOOR
<br />VITROUS CHINA
<br />ZW1017 MIXING VALVE, DEARBORN 760W-1 GRID DRAIN & PVC P -TRAP
<br />REQUIREMENTS
<br />ABOVE FINISHED FLOOR
<br />—SD—
<br />BRASSCRAFT KTSRI7FC STOPS & B -16A SUPPLY HOSES PL UMBEX 2002
<br />BFG
<br />BELOW FINISHED GRADE
<br />—C—
<br />P -TRAP & ANGLE STOP INSULATION. COLOR BY ARCHITECT.
<br />MV
<br />TWV-1
<br />WILKINS (ZURN)
<br />TEMPERING HOT WATER VALVE FOR PUBLIC RESTROOMS, 3/4' MNPT,
<br />SET AT 120 DEG F MAX
<br />WATER CLOSET
<br />34-ZW1017M
<br />PROVIDE UNIONS ON EACH SIDE OF VALVE,
<br />TEMPERATURE
<br />HWS -1
<br />REGENCY
<br />SEE EQUIPMENT PLAN
<br />SEE EQUIPMENT PLAN
<br />LAVATORY
<br />600HS17SP
<br />SANITARY SEWER DROP
<br />S
<br />MS -1
<br />REGENCY
<br />SEE EQUIPMENT PLAN
<br />SEE EQUIPMENT PLAN
<br />SERVICE/MOP SINK
<br />600SM162012
<br />ROOF DRAIN
<br />DF
<br />AD -1
<br />KARP DSC 214M
<br />GRAY PRIMERED ACCESS DOORS - SEE DRAWINGS FOR TYPE OF
<br />PAINT TO MATCH
<br />FIRE HOSE STANDPIPE
<br />CB, DI
<br />LOCKING MECHANISM. UNLESS OTHERWISE NOTED, FURNISH DOORS
<br />ARCHITECTURAL SURFACES.
<br />INVERT ELEVATION
<br />(F-- CO
<br />WITH SLOTTED 1/4' LOCKS, MIN SIZE IS 12x12. COLOR BY
<br />FG
<br />FINISH GRADE
<br />FLOOR SINK 3"
<br />ARCHITECT,
<br />WALL CLEAN OUT
<br />TP -1
<br />PPP, INC.
<br />PROVIDE DU- ACCESSORY WHERE PRIMER IS USED FOR MORE THAN
<br />MOUNT IN WALL BEHIND
<br />1-1/2"
<br />PR -500 PRIME
<br />ONE DRAIN.
<br />AD -1 WITH SOV.
<br />AD
<br />RITE
<br />®— FD
<br />FLOOR DRAIN
<br />FD -1
<br />ZURN ZN415
<br />TYPE B STRAINER FLOOR DRAIN, 2' OUTLET, TRAP PRIMER FITTING.
<br />FLOOR SINK
<br />REF -1
<br />LSP PRODUCTS
<br />METAL BOX, WHITE W/1/4' COMPRESSION STOP WITH 1/4 TURN BALL
<br />TRAP PRIMER VALVE
<br />HDR
<br />OB -509T
<br />VALVE FOR REFRIGERATOR ICE MAKER,
<br />COLD WATER (DROP) (RISER)
<br />FS -1
<br />ZURN
<br />12x12 SANI-FLOR RECEPTOR W/ALUM DOME STRAINER. MOUNT LIP 1'
<br />-
<br />MBH
<br />Z -1900-P-2-32
<br />AFF, 2. OUTLET.
<br />TEMPERED HOT WATER (115' F)
<br />IWH-1
<br />TAKAGI 310C
<br />SINGLE POINT USE INSTANTANEOUS HOT WATER HEATER, MODEL 310C,
<br />-
<br />HW
<br />HAND WASH STATION
<br />8 GPM, 609F RISE, 120V, IA. 190 MBH INPUT, SET LEAVING WATER
<br />HIGH PRESSURE GAS(PROPANE) >5PSI
<br />HS
<br />HOSE STATION
<br />TEMP AT 1209E MAX.
<br />COMPRESSED AIR
<br />ET -1
<br />STATE TW -5
<br />1 GALLON ACCEPTANCE VOLUME.
<br />PLUMBING NOTES:
<br />ALL WORK SHALL CONFORM TO THE FOLLOWING CODES:
<br />2016 CBC
<br />2016 CPC
<br />2016 CMC
<br />2016 CEC
<br />CONTRACTOR SHALL KEEP ALL INSTALLATION INSTRUCTIONS FOR PLUMBING FIXTURES, ACCESS DOORS, SEALING MATERIAL, FIRE
<br />STOPPING, ETC, ONSITE IN WATERPROOF POUCHES FOR THE INSPECTING AUTHORITY FOR THEIR REVIEW.
<br />PLUMBING CONTRACTOR SHALL SUBMIT 7 SETS OF SUBMITTALS FOR REVIEW AND COMMENT BY THE ENGINEER AND ARCHITECT
<br />OF RECORD FOR THE FIXTURES LISTED AND THE MATERIAL TO BE USED AND INSTALLED ON THIS PROJECT AND SHALL MAKE
<br />THE APPROPRIATE CHANGES AS DIRECTED BY THE ENGINEER AND ARCHITECT AT NO ADDITIONAL COST TO THE OWNER.
<br />MATERIALS:
<br />COLD AND HOT WATER
<br />TYPE 'L' COPPER ABOVE GROUND AND TYPE 'K' BELOW. FURNISH SHUTOFF VALVES WHERE SHOWN, SHUT OFF VALVES
<br />SHALL BE BALL TYPE WITH TEFLON SEATS, STAINLESS STEEL BALL, AND DOUBLE O-RING STEM 1/4 TURN, VALVES TO BE
<br />RATED FOR WOG SERVICE. PROVIDE DIELECTRIC UNIONS AT ALL DISSIMILAR METAL CONNECTIONS. INSULATE HOT WATER
<br />SUPPLY AND RETURN LINES W/1' FIBERGLASS ASJ MEETING THE REQUIREMENTS OF T-24 MANDATORY FEATURES.
<br />SCH 40 CPVC BELOW GRADE OUTSIDE, SIZE AS INDICATED ON THE DRAWINGS. CONTRACTOR SHALL COORDINATE HIS WORK
<br />WITH OTHER TRADES. CONTRACTOR SHALL DISINFECT WATER LINES PER AWA GUIDELINES AND PROVIDE THREE COPIES FROM
<br />AN INDEPENDENT TEST LAB. WATER SHALL BE TESTED FOR WATER BORNE BACTERIUM, SPORIDIUM AND OTHER PATHOGENS AT
<br />THE TIME OF OCCUPANCY AND CERTIFY THE SYSTEM PASSED THESE TESTS,
<br />TEST WATER LINES AT 1,5 TIMES WORKING PRESSURE FOR LEAKS, NOT TO EXCEED 100 PSIG. HOLD PRESSURE FOR 24 HOURS.
<br />SEWER AND RWL'S - ABS PIPE AND FITTINGS ABOVE AND BELOW GRADE, CI PIPE WITH ESCUTCHEONS WHERE PROHIBITED BY
<br />CODE AND THE LOCAL JURISDICTION, CLEANOUTS SHALL BE PROVIDED EVERY 100 FT AND AT EACH CHANGE OF DIRECTION
<br />GREATER THAT 909. USE OF ABS PIPE IS LIMITED TO BUILDINGS 2 OR LESS STORIES IN HEIGHT AND CANNOT BE USED
<br />WITHIN FIRE RATED ASSEMBLIES, ALL SEWER LINES SHALL BE SLOPED AT A MINIMUM OF 1/4' PER 11.
<br />VENT LINES - SEE SEWER LINES.
<br />HVAC CONDENSATE DRAIN LINES - TYPE 'M' COPPER PIPE AND FITTINGS INSIDE BUILDING AND SCH 40 PVC PIPE OUTSIDE
<br />BUILDING. PROVIDE CLEANOUT AT EACH CHANGE OF DIRECTION AND AT COIL CONNECTION. SLOPE LINES AT 1/8' PER 11.
<br />TEST SS AND RWL DRAIN LINES PER SECTION 723.1 AND 1106.2.2 RESPECTIVELY. TEST CONDENSATE DRAIN LINES USING
<br />SECTION 1106.2.2
<br />GAS
<br />5 PSI SERVICE - 2-1/2' AND SMALLER SHALL BE SCH 40 GI SCREWED PIPE AND FITTINGS. 3' AND LARGER SHALL BE SCH
<br />40 WELDED PIPE AND FITTINGS. EXPOSED PIPE SHALL BE GALVANIZED. BURIED PIPE SHALL BE COVERED WITH X -TRU COAT.
<br />ALL PIPE INSIDE BUILDING SHALL BE WELDED.
<br />7' WC SERVICE - SCH 40 GALVANIZED IRON PIPE AND FITTINGS OUTSIDE BUILDING AND SCH 40 BLACK IRON PIPE INSIDE
<br />BUILDING. PAINT WHERE EXPOSED TO INTERIOR FINISHES.
<br />TEST 7-11" WC GAS AND LPG LINES USING AIR AT 15 PSIG. OBSERVE FOR 24 HOURS FOR LEAKAGE, TEST ALL GAS LINES
<br />WITH HIGHER PRESSURES THAN 11" WC AT 1.5 TIMES WORKING PRESSURE, MINIMUM PRESSURE OF 50 PSIG. HOLD TEST FOR 24
<br />HOURS.
<br />FIXTURES
<br />ROUGH IN ALL ACCESSIBLE FIXTURES PER THE DETAILS FOUND IN CBC CHAPTER 11, THE ARCHITECTURAL DRAWINGS AND LOCAL
<br />CODE REQUIREMENTS, NOTIFY ARCHITECT IN WRITING OF CONFLICTS.
<br />SUBMITTALS
<br />PROVIDE SEVEN SETS OF SUBMITTALS FOR REVIEW.
<br />INSTALLATION
<br />BRACE ALL PIPE AND DUCT SYSTEMS PER SMACNA SEISMIC RESTRAINT GUIDELINES INCLUDING CHANGES OF DIRECTION AND
<br />CHANGES IN ELEVATION OF MORE THAN 10',
<br />CPVC INSTALLATION
<br />INSTALLATION OF CPVC FOR NEW AND REPLACEMENT SYSTEMS MUST COMPLY WITH THE REQUIREMENTS AS STATED IN CHAPTER
<br />6 AND INSTALLATION STANDARDS IAPMO IS -20-2005, ALL PROCEDURES MUST BE FOLLOWED FOR FLUSHING AND WORKER
<br />SAFETY MEASURES. INCLUDED ARE THE PENALTIES AS STATED ON CHAPTER 6 (g), ANY CONTRACTOR OR SUBCONTRACTOR
<br />FOUND TO HAVE FAILED TO COMPLY WITH THE VENTILATION GLOVE OR FLUSHING REQUIREMENTS OF SECTION 1.2.2 OF
<br />APPENDIX I OF THIS CODE, INSTALLATION STANDARDS FOR CPVC SOLVENT CEMENT HOT AND COLD WATER DISTRIBUTION
<br />SYSTEMS. IAPMO IS -20-2005 SHALL BE SUBJECT TO THE PENALTIES ON HEALTH AND SAFETY CODE, DIVISION 13, PART 15
<br />CHAPTER 6 SECTION 17995,
<br />IN ADDITION IF DURING THE CONDUCT OF ANY BUILDING INSPECTION, THE BUILDING OFFICIAL FINDS THAT THE VENTILATION
<br />AND GLOVE REQUIREMENTS OF SECTION 1.2.2 OF APPENDIX I OF THIS CODE, SPECIAL REQUIREMENTS FOR CPVC INSTALLATION
<br />WITHIN RESIDENTIAL BUILDINGS ARE BEING VIOLATED, BUILDING OFFICIAL SHALL CITE THE CONTRACTOR OR SUBCONTRACTOR
<br />FOR THE VIOLATION UNDER THE CALIFORNIA PLUMBING CODE.
<br />PLUMBING LEGEND
<br />SYMBOL
<br />DESCRIPTION
<br />SYMBOL
<br />DESCRIPTION
<br />--- CW
<br />COLD WATER LINE
<br />COLD
<br />BALL VALVE <= 4", GATE VALVE>4"
<br />---- HW
<br />HOT WATER LINE
<br />—IAF—
<br />BALANCING VALVE
<br />TD
<br />TRENCH DRAIN
<br />3"
<br />2"
<br />GAS COCK
<br />SS
<br />SANITARY SEWER
<br />AC
<br />ABOVE CEILING
<br />GL
<br />GREASE LINE
<br />BFFBELOW
<br />FINISHED FLOOR
<br />— — HV
<br />HORIZONTAL VENT
<br />AFF
<br />ABOVE FINISHED FLOOR
<br />—SD—
<br />STORM DRAIN LINE
<br />BFG
<br />BELOW FINISHED GRADE
<br />—C—
<br />CONDENSATE DRAIN
<br />MV
<br />MIXING VALVE
<br />—MA—
<br />MEDICAL/DENTAL AIR
<br />WC
<br />WATER CLOSET
<br />—V—
<br />VACUUM
<br />UR
<br />URINAL
<br />V, VR, VTR
<br />VENT, VENT RISER, VENT THRU ROOF
<br />L
<br />LAVATORY
<br />—SSD —
<br />SANITARY SEWER DROP
<br />S
<br />SINK
<br />RWL
<br />RAIN WATER LEADER
<br />MS
<br />SERVICE/MOP SINK
<br />RD
<br />ROOF DRAIN
<br />DF
<br />DRINKING FOUNTAIN
<br />AD
<br />AREA DRAIN
<br />FHS
<br />FIRE HOSE STANDPIPE
<br />CB, DI
<br />CATCH BASIN (DROP INLET)
<br />INV
<br />INVERT ELEVATION
<br />(F-- CO
<br />CLEAN OUT
<br />FG
<br />FINISH GRADE
<br />FLOOR SINK 3"
<br />II — WCO
<br />WALL CLEAN OUT
<br />CUT OFF POINT - COP
<br />FCO
<br />FLOOR CLEAN OUT
<br />1-1/2"
<br />POINT OF CONNECTION - POC
<br />— YCO
<br />YARD CLEAN OUT
<br />AD
<br />ACCESS DOOR - SEE SCHEDULE FOR TYPES
<br />®— FD
<br />FLOOR DRAIN
<br />CI
<br />CAST IRON
<br />�— FS
<br />FLOOR SINK
<br />CENTER LINE
<br />TP
<br />TRAP PRIMER VALVE
<br />HDR
<br />HEADER
<br />CW, D, R —
<br />COLD WATER (DROP) (RISER)
<br />ON
<br />DOWN
<br />HW,D,R,RT —
<br />HW SUPPLY (DROP) (RISER) (RETURN)
<br />MBH
<br />THOUSANDS OF BTU PER HOUR
<br />THW —T —
<br />TEMPERED HOT WATER (115' F)
<br />NIPC
<br />NOT IN PLUMBING CONTRACT
<br />— G, LPG —
<br />NATURAL GAS (PROPANE)<5PS1
<br />HW
<br />HAND WASH STATION
<br />— HPG —
<br />HIGH PRESSURE GAS(PROPANE) >5PSI
<br />HS
<br />HOSE STATION
<br />— CA —
<br />COMPRESSED AIR
<br />HWG
<br />HOT WATER GENERATOR
<br />HOSE BIBB
<br />BV
<br />BALL <5", BUTTERFLY >5" VALVE
<br />tsov
<br />L
<br />UNDER PLUMBING CONTRACT
<br />—SCW —
<br />SOFT COLD WATER LINE
<br />SHUT OFF VALVE
<br />— SHW —
<br />SOFT HOT WATER LINE
<br />FIXTURE CONNECTION SCHEDULE
<br />PLUMBING
<br />SANITARY
<br />WATER
<br />FIXTURE
<br />SEWER
<br />VENT
<br />COLD
<br />HOT
<br />WATER CLOSET FV
<br />3-
<br />2"
<br />1"
<br />-
<br />WATER CLOSET FT
<br />3"
<br />2"
<br />1/2"
<br />-
<br />URINAL FV
<br />2"
<br />1-112"
<br />3/4"
<br />-
<br />URINAL FT
<br />2"
<br />1-1/2"
<br />1/2"
<br />-
<br />LAV
<br />2"
<br />1-912"
<br />1/2"
<br />1/2"
<br />BAR SINK
<br />2"
<br />1-112"
<br />1/2"
<br />1/2"
<br />CLASSROOM SINK
<br />2"
<br />1-1/2"
<br />1/2"
<br />1/2"
<br />KITCHEN SINK
<br />2"
<br />1-112"
<br />1/2"
<br />1/2"
<br />MOP SINK
<br />3"
<br />2"
<br />3/4"
<br />3/4"
<br />TRAP PRIMER
<br />-
<br />-
<br />1/2"
<br />-
<br />FD - 2"
<br />2"
<br />1-112"
<br />-
<br />FD - 3"
<br />3"
<br />2"
<br />DD NOT DATRAC
<br />FLOOR SINK 2"
<br />2"
<br />1-1/2"
<br />FLOOR SINK 3"
<br />3"
<br />1-1/2"-
<br />SHOWER - RES.
<br />2"
<br />1-1/2"
<br />1/2"
<br />1/2"
<br />EYEWASH
<br />2"
<br />1-1/2"
<br />1/2"
<br />-
<br />n
<br />GAS SIZING TABLE
<br />DEVLELOPED
<br />'L'
<br />PIPE
<br />CFH
<br />100'
<br />1/2'
<br />50
<br />SIZES FROM
<br />TABLE 1216.20)
<br />3/4'
<br />104
<br />2016 CPC
<br />1'
<br />195
<br />SEE PLUMBING FLOOR
<br />1-1/4'
<br />400
<br />PLAN FOR SIZE
<br />1-1/2'
<br />600
<br />6' DRIP LEG
<br />2'
<br />1160
<br />2-1/2'
<br />1840
<br />PLAN FOR SIZES
<br />3'
<br />3260
<br />DC
<br />1
<br />PLUMBING ROOF PLAN
<br />SCALE: 114'= 1'-0'
<br />PLUMBING ROOF PLAN NOTES NORTH
<br />1D POC - CONNECT (N)RTU-4 TO (E)1 -G STUBBED THRU ROOF,
<br />3/4'COND FROM RTU -4 W/CCQ, SPILL TO (E)ROOF DRAIN.
<br />IWH-1 CW/HW
<br />AND GAS
<br />PIPING
<br />MOUNT 48'
<br />AFF
<br />3/4' TBP
<br />I ,
<br />=
<br />I
<br />v INTEGRAL GAS
<br />RELIEF -
<br />APPROVED CLEANOUT
<br />P.0
<br />VALVE AND
<br />SPILL TD
<br />J
<br />FLEX ASSEMBLY
<br />MS -1
<br />SEE PLUMBING FLOOR
<br />I' H&CW LINES
<br />Yy
<br />PLAN FOR SIZE
<br />TO IWH-1
<br />6' DRIP LEG
<br />GAS LINE - SEE
<br />a
<br />PLAN FOR SIZES
<br />LINE SIZE
<br />AND RDUTIN
<br />IWH-1 PIPING
<br />DETAIL
<br />5
<br />DETAIL
<br />2'
<br />P O
<br />(E)ROOF TRUSSES
<br />- 24" OC
<br />FS -1 FOR FLOOR SINKS LOCATED
<br />UNDER WORK CABINETS
<br />E(�UIPM ENT BASE TO BE
<br />A, KCHED AROUND FLOOR
<br />SEE PLAN FOR GRATE
<br />ARRANGEMENT
<br />TYPICAL FLOOR SINK
<br />w/DOME STRAINER
<br />PLAN VIEW
<br />" AIR GAP / REMOV. GRATE FOR
<br />)OR SINK /�' ACCESS TO CLEAN
<br />M DOME STRAINER
<br />6/SE. EQUIP..+
<br />G.C. TO GROUT
<br />GAP BETWEEN
<br />& FLOOR
<br />PS -1 MOUNTING
<br />SEE DETAIL 'A' FOR
<br />B -LINE VIBRACLAMP - BVT
<br />ppS���ER�IIrESpppCpLL�AA�MP��ppFTO BE USED ON
<br />INSULATI04kLWPWHTIEPASJ AND FITTINGS
<br />WHERE REQUIRED - INSTALL
<br />ALUMINUM JACKET WHERE
<br />EXPOSED TO THE WEATHER,
<br />PROVIDE LABELS FOR SERVICE
<br />AND FLOW DIRECTION
<br />W/MIN 1" HIGH LETTERS
<br />'2" ALL THREAD ROD (ATR)
<br />TH DOUBLE NUT AND LOCK
<br />WASHER AT AT STRUT AND
<br />ANGLE CUP
<br />SEE DETAIL 'A' FOR
<br />ATTACHMENT TO
<br />STRUCTURE
<br />(E)ROOF FRAMING - 2x6
<br />WOOD JOISTS, 24" OC
<br />LATERAL OR LONGITIDUNAL BRACE - SIZE
<br />AND SPACING PER SMACNA TABLES
<br />5-7,6-7- OR 7-7 OR CPC TABLE 3-1 AND
<br />3-2. BRACE ONLY REQUIRED WHEN PIPE IS
<br />MORE THAN 12" BELOW STRUCTURE
<br />HANGER ROD - SEE CPC TABLE 3-1 OR
<br />SMACNA SEISMIC RESTRAINT GUIDELINE
<br />TABLES 5-7,6-7 OR 7-7 FOR HANGER
<br />ROD SIZES AND CPC TABLE 3-2 FOR
<br />SPACING.
<br />DOUBLE NUT AT HANGER -
<br />INSULATION W/WHITE ASJ
<br />FOR PIPE 1-1/2" AND SMALLER OR
<br />CALSILICA SUPPORT WHERE
<br />REWIRED - INSTALL ALUMINUM
<br />JACKET WHERE EXPOSED TO THE
<br />WEATHER, PROVIDE LABELS FOR
<br />SERVICE AND FLOW DIRECTION
<br />W/MIN 1" HIGH LETTERS
<br />CLEVIS
<br />WITH FLOOR
<br />SECTION
<br />SEE DETAIL 'A' FOR
<br />SEE DETAIL 'A' FOR
<br />2x2x1/4"x2" LONG ANGLE
<br />CLIP - ATTACH AT
<br />MIDPOINT OF PURLOIN WITH
<br />1/2"0x2" LONG LAG BOLT,
<br />EMBED 1-1/2" MIN.
<br />BRACE TO RISE TO RUN
<br />(SLOPE) SHALL BE NO MOF
<br />THAN 2:1 OR NO LESS
<br />THAN 1:2
<br />DOUBLE NUT AND
<br />DOUBLE NUT AND
<br />PIPE SUPPORT HANGER AND TRAPEEZE - WOOD
<br />DETAIL
<br />BELOW FINISH
<br />OR FLOOR
<br />ROAD PAVEMENT WHERE
<br />APPLICABLE
<br />6" THICK 36" DIAMETER
<br />CONCRETE RING WITH
<br />1-#4 BAR IN CENTER
<br />CONCRETE BOX LABELED SEWER
<br />OR'
<br />BRASS CLEANOUT BOX
<br />IN FINISHED FLOOR
<br />3"0 PVC SLEEVE WITH 4"0
<br />-LEANOUT RISER PIPE
<br />N�-j.ONG SWEEP 'L'
<br />90 DEGREE
<br />INVERT - SEE PLAN
<br />FOR SIZES
<br />SEE PLUMBING FLOOR
<br />PLAN FOR SIZE
<br />CLEANOUT TO GRADE 6
<br />DETAIL P O
<br />BELOW FINISH
<br />OR FLOOR
<br />CLEVIS
<br />DETAIL 'A'
<br />THIS DOCUMENT, AND THE IDEAS AND DESIGNS
<br />INCORPORATED HEREIN, AS AN INSTRUMENT OF
<br />PROFESSIONAL SERVICE, IS THE PROPERTY OF
<br />"api" AND IS NOT TO BE USED, IN WHOLE OR IN
<br />PART, FOR ANY OTHER PROJECT WITHOUT
<br />WRITTEN AUTHORIZATION.
<br />PLANNING ■ ■ ■
<br />ARCHITECTURE ■ ■ ■
<br />■ ■
<br />ARCHITECTURE PLUS INC.
<br />4335-B NORTH STAR WAY
<br />MODESTO, CA 95356
<br />PVC CONNECTION -
<br />L2WAY CI IAP M0
<br />B NO.:
<br />DO NOT OVERTIGHTEN
<br />APPROVED CLEANOUT
<br />P.0
<br />AT AC UNIT
<br />INVERT - SEE PUN
<br />J
<br />FOR SIZES
<br />SEE PLUMBING FLOOR
<br />END OPEN TD AIR COIL LOCATION
<br />PLAN FOR SIZE
<br />2 -WAY
<br />CLEAN❑UT
<br />3/4' PVC
<br />a
<br />Q
<br />N
<br />w
<br />2'
<br />O
<br />Z
<br />COIL COND, PIPING
<br />3
<br />W
<br />J
<br />DETAIL
<br />w
<br />2
<br />U
<br />h
<br />PVC CONNECTION
<br />Z
<br />DD NOT DATRAC
<br />UNIT
<br />M
<br />- T\ -ROAD PAVEMENT WHERE
<br />APPLICABLE
<br />6" THICK 36" DIAMETER
<br />ONCRETE RING WITH
<br />I� 1-#4 BAR IN CENTER
<br />II CONCRETE BOX LABELED SEWER
<br />OR'
<br />I BRASS CLEANOUT BOX
<br />IN FINISHED FLOOR
<br />p 6"0 PVC SLEEVE WITH 4"0
<br />CLEANOUT RISER PIPE
<br />END
<br />OPEN TO AIR 3/4' PVC -� , AND FLEX SSEMBLYE
<br />6' DRIP
<br />LINE
<br />GAS LINE - SEE PLAN
<br />FOR SIZES AND ROUTING
<br />GAS AND CONDENSATE,
<br />DETAIL P O
<br />JOB# 2019-097
<br />GDMD ENGINEERING, INC
<br />Mechanical and Safety Engineers
<br />212 W Pine St, Ste 4
<br />Lodi, Ca 95242
<br />Ph 209-367-0899
<br />Fax 209-367-0898
<br />E-mail:gdmdengrinc@sbcglobal.net
<br />pi COPYRIGHT 2019
<br />ph. 209.577.4661
<br />fx. 209.577.0213
<br />www.apiarc.com
<br />FRANK C. BOOTS
<br />JOSEPH L. SMITH
<br />RODNEY C. ALONZO
<br />ARCHITECTS
<br />W Z
<br />he W o0e
<br />Z
<br />Oct W O
<br />916.
<br />2OmS
<br />H
<br />Q &L O
<br />N z
<br />ol)
<br />in
<br />Q Z a
<br />Q 0
<br />Z oe
<br />W Lu >
<br />uI
<br />ZI
<br />0
<br />L2WAY CI IAP M0
<br />B NO.:
<br />18-114
<br />APPROVED CLEANOUT
<br />P.0
<br />HECKED :
<br />INVERT - SEE PUN
<br />FOR SIZES
<br />SEE PLUMBING FLOOR
<br />PLAN FOR SIZE
<br />2 -WAY
<br />CLEAN❑UT
<br />DETAIL
<br />P O
<br />END
<br />OPEN TO AIR 3/4' PVC -� , AND FLEX SSEMBLYE
<br />6' DRIP
<br />LINE
<br />GAS LINE - SEE PLAN
<br />FOR SIZES AND ROUTING
<br />GAS AND CONDENSATE,
<br />DETAIL P O
<br />JOB# 2019-097
<br />GDMD ENGINEERING, INC
<br />Mechanical and Safety Engineers
<br />212 W Pine St, Ste 4
<br />Lodi, Ca 95242
<br />Ph 209-367-0899
<br />Fax 209-367-0898
<br />E-mail:gdmdengrinc@sbcglobal.net
<br />pi COPYRIGHT 2019
<br />ph. 209.577.4661
<br />fx. 209.577.0213
<br />www.apiarc.com
<br />FRANK C. BOOTS
<br />JOSEPH L. SMITH
<br />RODNEY C. ALONZO
<br />ARCHITECTS
<br />W Z
<br />he W o0e
<br />Z
<br />Oct W O
<br />916.
<br />2OmS
<br />H
<br />Q &L O
<br />N z
<br />ol)
<br />in
<br />Q Z a
<br />Q 0
<br />Z oe
<br />W Lu >
<br />uI
<br />ZI
<br />0
<br />SHEET
<br />To
<br />AUGUST 2019
<br />B NO.:
<br />18-114
<br />rTE:
<br />AWN
<br />P.0
<br />HECKED :
<br />G.D
<br />SHEET
<br />To
<br />
|