My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 4:20:35 PM
Creation date
2/10/2021 4:19:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
Harney Lane 76
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for Harney Lane 76 as of October 04 , 2021. <br /> Open violations from August 18 , 2021 inspection <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date ) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #115 - Failure to submit " Monitoring System Certification Form " within 30 days of completion of <br /> the test . <br /> OBSERVATION Annual monitoring system certification , leak detector testing , and spill container testing was <br /> performed on 7/7/2020 and a test report was submitted on 8/25/2020 , 18 days late . <br /> REGULATION GUIDANCE: A copy of the test report must be submitted within 30 days of the tests . <br /> CORRECTIVE ACTION : Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #118 - Failure to submit the "Overfill Prevention Equipment Inspection Report Form " within 30 <br /> days . <br /> OBSERVATION Overfill prevention testing was performed on 6/4/2020 and a test report was submitted on <br /> 8/5/20201 2 months late . <br /> REGULATION GUIDANCE: A copy of the test report must be submitted within 30 days of the tests . <br /> CORRECTIVE ACTION : Take all necessary precautions to ensure testing and submittal of test reports are <br /> performed in a timely manner. <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.