Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for Harney Lane 76 as of December 06 , 2021 . <br /> Open violations from August 18 , 2021 inspection <br /> Violation #208 - Failure to comply with the designated operator inspection requirements . <br /> OBSERVATION : The last DO monthly inspection report found on site was dated 5/28/2021 . There is no indication <br /> that a monthly inspection has been performed for the month of June and July . More than 30 days has passed since <br /> the last inspection . <br /> REGULATION GUIDANCE : The designated operator visual inspections shall be conducted within 30 days or less of <br /> the previous inspection . <br /> CORRECTIVE ACTION : Ensure that all designated operator inspections are performed within the required time <br /> frames . <br /> OBSERVATION : The designated operator failed to document all the alarms from the attached alarm history on the <br /> following reports : <br /> . 4/2/2021 : Q1 Alarm on 3/12/2021 <br /> - 4/30/2021 : S2-S7 Alarm on 4/22/2021 <br /> . 5/28/2021 : L1 -L28 , Q1 -Q3 , S9-S13 Alarms on 5/4/2021 <br /> REGULATION GUIDANCE : During the inspection , the designated operator shall review the alarm history since the <br /> previous inspection , check that each alarm was documented and responded to appropriately, and attach a copy of <br /> the alarm history with documentation taken in response to any alarms to the inspection report. <br /> CORRECTIVE ACTION : Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> OBSERVATION : Designated operator reports were not signed by the Owner or Operator for the March 2021 -May <br /> 2021 reports . The reports were signed by the following individuals : Silvia Mendoza , Ashley D , Mindy Duran , Gopi <br /> Kheira . These individuals are not the owner/operator and there are no training records on file for them . The <br /> February 15 , 2021 DO report did not include the name of the person who signed the report. <br /> REGULATORY GUIDANCE : Within 48 hours of the completion of the designated UST operator visual inspection , <br /> the designated operator shall sign and provide the owner or operator with a copy of the inspection report. Within 72 <br /> hours of being provided a signed copy of the report, the owner or operator shall provide a description of each <br /> corrective action taken or to be taken and shall sign and date the report, acknowledging the identified compliance <br /> issues . <br /> CORRECTIVE ACTION : Ensure all designated operator inspection reports are completed and signed within the <br /> required time frame in the future . <br /> OBSERVATION : The designated operator incorrectly documented the test dates for the Secondary Containment on <br /> the designated operator inspection report as 7/7/2020 on the 2/15/2021 report. This is a VPH site and we have no <br /> records of a secondary containment test being conducted . The designated operator incorrectly documented the test <br /> dates for the Overfill Prevention inspection on the February 2021 - May 2021 designated operator inspection report <br /> as 7/7/2021 . Per the EHD records the Overfill Prevention Inspection was conducted on 6/4/2020 . <br /> Page 5 of 7 <br />