My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 4:20:35 PM
Creation date
2/10/2021 4:19:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
Harney Lane 76
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br />been addressed for Harney Lane 76 as of December 06, 2021. <br />Open violations from August 18, 2021 inspection <br />Violation #122 - Failure to implement corrections and submit written response within 30 days of receiving <br />the report. <br />OBSERVATION: An inspection was last done on 7/7/2020 and an inspection report was issued identifying <br />information to be submitted to bring this site into compliance. This information was required to be submitted by <br />8/6/2020. This information was received late. <br />REGULATION GUIDANCE: An operator that receives an inspection report shall have 30 days to implement the <br />corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br />all of the recommendations made in the report. The operator shall submit a written response that includes a <br />statement documenting corrective actions taken or proposing corrective actions which will be taken. <br />CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br />submitted and all corrections implemented within 30 days of receiving an inspection report. <br />❑ This violation was corrected ❑ This violation will be corrected by (date): <br />❑ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Violation #202 - Failure to retain a paper or electronic copy of the permit to operate at the facility. <br />OBSERVATION: A current copy of the UST operating permit was not found on site. <br />REGULATION GUIDANCE: A copy of the UST operating permit and all attachments and conditions shall be <br />retained at the facility. <br />CORRECTIVE ACTION: Immediately obtain a copy of the 2021 permit and retain it on site. <br />❑ This violation was corrected ❑ This violation will be corrected by (date): <br />❑ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.