My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
800
>
2300 - Underground Storage Tank Program
>
PR0231325
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 9:23:37 AM
Creation date
2/16/2021 1:51:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231325
PE
2361
FACILITY_ID
FA0003997
FACILITY_NAME
PLAZA LIQUOR #1
STREET_NUMBER
800
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742004
CURRENT_STATUS
01
SITE_LOCATION
800 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> UDC#1&2 JUDC#3&4 JUDC# JUDC# <br /> UDC Manufacturer: Bravo Bravo <br /> UDC Material: Coated Steel Coated Steel <br /> UDC Depth: 10" 10" <br /> Height from UDC Bottom to Top Enters from bottom Enters from bottom <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to Enters from bottom Enters from bottom <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry <br /> testing: <br /> Portion of UDC Tested' Water Level 8" Water Level 8" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both No No <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A <br /> Is system programmed for fail- <br /> safe shutdown?` Yes Yes <br /> Was fail-safe verified to be No No <br /> operational?* <br /> Wait time between applying 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time: 9:52 9:57 <br /> Initial Reading (RI): .001 .001 <br /> Test End Time: 10:22 10:27 <br /> Final Reading(RF): .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes <br /> Change in Reading (RF—RI): 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass <br /> Was sensor removed for testing? No No <br /> Was sensor properly replaced and N/A N/A <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to�Lny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.