My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOSPITAL
>
500
>
2300 - Underground Storage Tank Program
>
PR0231614
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 4:16:58 PM
Creation date
2/16/2021 1:52:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231614
PE
2361
FACILITY_ID
FA0000086
FACILITY_NAME
San Joaquin General Hospital
STREET_NUMBER
500
Direction
W
STREET_NAME
HOSPITAL
STREET_TYPE
Rd
City
French Camp
Zip
95231
CURRENT_STATUS
01
SITE_LOCATION
500 W Hospital Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for San Joaquin General Hospital as of October 06, 2021. <br /> Open violations from August 12, 2021 inspection <br /> Violation#316-Failure to install a line leak detector. <br /> OBSERVATION: The pressurized piping on the diesel tank is not equipped with an automatic line leak detector. <br /> REGULATION GUIDANCE:Automatic line leak detectors are required to be equipped on underground pressurized <br /> piping systems that carry a hazardous substance. <br /> CORRECTIVE ACTION: Correct immediately by having a properly licensed,trained, and certified contractor install a <br /> leak detector(LG 113-x listed, if applicable)and obtain a permit within one business day from the EHD. If the leak <br /> detector can't be installed immediately,there is a possibility that the diesel UST system may be red tagged to <br /> prevent fuel inputs. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#319-Failure to comply with overfill prevention equipment requirements. <br /> OBSERVATION: The mechanical flapper used as the overfill prevention system is not currently functional on the <br /> diesel UST. <br /> REGULATION GUIDANCE:All UST systems must be equipped with an approved,functional overfill prevention <br /> device at all times during delivery operations. <br /> CORRECTIVE ACTION: Immediately discontinue deposition of petroleum into this tank until the component is <br /> repaired or replaced by a properly licensed, trained, and certified contractor under permit and inspection of the EHD. <br /> If the failed component can't be replaced immediately,there is a possibility that the diesel UST system may be red <br /> tagged to prevent fuel inputs. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.