Laserfiche WebLink
Underground Storage Tank <br />Monitoring System Certification Form <br />1 10. MONITORING SITE PLAN <br />Date site plan was prepared. 05/26/2021 2375 W GRANT LINE <br />If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br />identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br />a legend for all symbols depicted. <br />ESO <br />TLS <br />F1 <br />Q ESO <br />DISPENSER DISPENSER 6208 5 4 208 3 2 208 1 <br />1-14 15-22 <br />301 87 AUX FILL 87 AUX STP O 87 AUX STP <br />208 208 352 <br />10 208 9 8 208 7 <br />8484 8484 <br />301 87 FILL 87 STP P 87 STP <br />208 208 352 <br />8484 8484 <br />301 91 FILL 91 STP <br />(D16F208] <br />91 STP 15 14E <br />13 12 208 11 <br />208 352 352 <br />849490-003 <br />301 (j) <br />P 208 <br />22 1 208 21 20 1 208 19 18208 17 <br />ESO <br />Page 6 of 6 <br />