My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2022 8:48:19 AM
Creation date
2/17/2021 8:08:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br />been addressed for GRANT LINE SHELL* as of July 22, 2021. <br />Open violations from May 26, 2021 inspection <br />Violation #107 - Failure to submit and maintain complete and current financial responsibility documents. <br />OBSERVATION: Current financial responsibility documents were not found on site. <br />REGULATION GUIDANCE: A copy of current financial responsibility documents are required to be maintained on <br />site. <br />CORRECTIVE ACTION: Immediately obtain a copy of the facility's financial responsibility documents and maintain a <br />copy on site. <br />❑ This violation was corrected ❑ This violation will be corrected by (date): <br />❑ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Violation #122 - Failure to implement corrections and submit written response within 30 days of receiving <br />the report. <br />OBSERVATION: An inspection was last done on 5/18/2020 and an inspection report was issued identifying <br />information to be submitted to bring this site into compliance. This information was required to be submitted by <br />6/17/2020. This information has not been received resulting in a non-compliant status for this facility. <br />REGULATION GUIDANCE: An operator that receives an inspection report shall have 30 days to implement the <br />corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br />all of the recommendations made in the report. The operator shall submit a written response that includes a <br />statement documenting corrective actions taken or proposing corrective actions which will be taken. <br />CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br />submitted and all corrections implemented within 30 days of receiving an inspection report. <br />❑ This violation was corrected ❑ This violation will be corrected by (date): <br />❑ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.