Laserfiche WebLink
SIGNAGE FINISH PLAN NOTES <br /> SIGNS SEE FINISH SCHEDULE FOR ALL MATERIAL <br /> INFORMATION <br /> SN 1 MEN'S RESTROOM (REFERENCE A6.0) <br /> SN2 WOMEN'S RESTROOM (REFERENCE A6.0) ALL INTERIOR WALL TO BE PAINTED P-4, U.O.N. <br /> SN3 EMPLOYEES ONLY ALL FLOORS TO BE SC-1, U.O.N. <br /> SN4 THIS DOOR IS TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED. (NOTE: THE SIGN SHALL BE IN LETTERS 1 INCH HIGH ON A ALL CEILING TO BE ACT-1, U.O.N. <br /> CONTRASTING BACKGROUNG)\ <br /> SN5 EXIT TACTILE SIGN PER LOCAL BUILDING CODE PAINT LAYERING: (1) PRIMER; (2) PAINT COLOR, U.O.N. <br /> • PROVIDE PAINT BRUSHOUTS TO ARCHITECT FOR 5865 Owens Drive <br /> REVIEW PRIOR TO START OF WORK. Pleasanton, CA 94588 <br /> • PROVIDE FINISH SAMPLES OF ALL TILE & GROUT TO 925-251-7200 <br /> ARCHITECT FOR REVIEW PRIOR TO PURCHASE AND <br /> INSTALLATION <br /> • ALL ELECTRICAL COVER PLATES ON ACCENT WALLS <br /> SHALL BE PAINTED TO MATCH ACCENT WALL <br /> • ALL RECESSED WALL CABINETS SHALL BE PAINTED TO <br /> MATCH ACCENT WALL. FINISH: SEMI-GLOSS <br /> • FOR WALL FINISH INFORMATION NOT SHOWN SEE <br /> INTERIOR ELEVATIONS <br /> • FOR CEILING FINISH INFORMATION SEE REFLECTED <br /> CEILING PLAN SHEET A2.3 <br /> • INSTALL CORNER GUARD (MARLITE P-100'WHITE')AT <br /> ALL OUTSIDE CORNERS ALONG FRP WALLS CONSULTANT <br /> I I I I <br /> 1/2" GYP. BD. (PAINTED REF. - 1/2" GYP. BD. (PAINTED REF. INSTALL CORNER GUARD (SCHLUTER ROUNDEC - <br /> INTERIOR ELEVATIONS) INTERIOR ELEVATIONS) SATIN ANODIZED ALUM.AT ALL OUTSIDE CORNERS <br /> ATTACHED W/ 1"TYPE 'S' ATTACHED W/ 1"TYPE 'S' ALONG TILED WALLS <br /> SCREWS @ 8" O.C. ALONG SCREWS @ 8" O.C. ALONG <br /> EDGES, @ 12" O.C. IN THE EDGES, @ 12" O.C. IN THE <br /> PROVIDE SMOOTH, DURABLE, EASILY CLEANABLE, <br /> FIELD OF THE BOARD. FIELD OF THE BOARD. LIGHT-COLORED, AND NON-ABSORBANT WALL AND <br /> JOINTS ORIENTED JOINTS ORIENTED CEILING FINISHES AT: WHERE FOOD IS PREPARED OR <br /> VERTICALLY AND VERTICALLY AND 1 PACKAGED, FOOD OR BEVERAGE IS DISPENSED, <br /> STAGGERED ON OPPOSITE STAGGERED ON OPPOSITE WHERE UTENSILS ARE WASHED OR STORED, ELEvEn <br /> SIDES OF ASSEMBLY TO SIDES OF ASSEMBLY TO JANITORIAL AREAS, RESTROOMS, WALK-IN <br /> BOTTOM OF ROOF DECK. BOTTOM OF ROOF DECK. REFRIGERATORS/FREEZERS, AND GARBAGE AND <br /> REFUSE STORAGE. <br /> • OSB IS NOT AN APPROVED CONSTRUCTION MATERIAL <br /> T-5 (REF MATERIAL AND SHALL NOT BE SUBSTITUTED FOR FIRE TREATED <br /> SCHEDULE)ADHERE LA A PLYWOOD. <br /> PER MANUFACTURERS ALWAYS WATERPROOF DEMISING WALLS IN WET <br /> RECOMMENDATIONS AREAS, INCLUDING BEHIND COOLER/ FREEZER AND 7-11 #1043581 <br /> o ELEC. SN5 BEVERAGE COUNTER. <br /> b 107 ALL SUBSTRATES ARE TO EXTEND TO DECK, UNLESS <br /> NOTED OTHERWISE. <br /> 1/2" MOISTURE - FRP-1 (REF MATERIAL <br /> RESISTANT GREEN GYP SCHEDULE)ADHERE PROVIDE FULL HEIGHT CORNER GUARDS AND "T" <br /> BD ADHERED TO PER MANUFACTURERS IBG FRP-1 BACKROOM MOLDING AS REQUIRED AT ALL OUTSIDE CORNERS <br /> COOLER VAULT. STAPLE RECOMMENDATIONS IBG AND PANEL JOINTS. CORNER GUARDS SHOULD BE <br /> PERIMETER AT 12" O.C. 104 FOR MATERIAL FINISH SPECIFIED IN FINISH AND <br /> MATERIAL SCHEDULES ON SHEET A6.1. <br /> WOMEN'S ALL INTERIOR FACE OF EXTERIOR SIP PANEL WALLS <br /> B-2- REF: A6.1 FOR B-2- REF: A6.1 FOR ® L TO BE COVERED WITH 1/2" GYPSUM BOARD FROM <br /> MATERIALS SCHEDULE MATERIALS SCHEDULE 105 SN2 FLOOR TO ROOF DECK TO MEET FLAME SPREAD z `i I <br /> / - MEN'S RATING. ATTACHED W/ 1"TYPE 'S' SCREWS @ 8" O.C. LU <br /> 0 OFFICE ALONG EDGES, @ 12" O.C. IN THE FIELD OF THE O <br /> 106 I 103 BOARD. JOINTS ORIENTED VERTICALLY AND <br /> SNI STAGGERED ON OPPOSITE SIDES OF ASSEMBLY TO /� (I) <br /> isu ONLY @COOLER VAULT FRc ONLY @COOLER VAULT BOTTOM OF ROOF DECK. V J <br /> IBG ' z Q <br /> *DETAIL NOT USED*zj� / IL FRP-1 **ALL SUBSTRATES ARE TO BE APPLIED OVER AND IN Q U <br /> FRP 1 ADDITION TO THE WALLBOARD REQUIRED FOR FIRE CC <br /> — - B RATED WALL CONSTRUCTION DESCRIBED ON THIS G z <br /> SHEET.** LLQ O <br /> L�1 ICB ALL INTERIOR FINISHES TO BE CLASS 2 OR BETTER. z 06 <br /> SN3 CONTRACTOR TO FLOAT AND SCRAPE FLOOR TO BE <br /> LEVEL AND PREPARE FOR NEW SCHEDULED FINISH, CO Q O <br /> AS REQUIRED. V A ' 3: 1— <br /> SALES CONTRACTOR TO RESERVE SPECIFIED FLOORING ` z <br /> AND BASE UPON BEING AWARDED THE BID TO 06 O <br /> 102 ENSURE AVAILABILITY AND TIMELY INSTALLATION. <br /> c SUBSTITUTIONS ARE NOT PERMITTED. J <br /> O <br /> N z FLOORS IN WET AREAS TO SLOPE TO DRAINS 1/8" PER <br /> FOOT, TYP. <br /> z <br /> PROVIDE A BEAD OF CAULK AT INTERIOR CONDITIONS <br /> PNT PER OWNER DIRECTION AND PROJECT NEEDS. <br /> ABOVE CAULK IS TO MATCH COLOR OF ADJACENT MATERIAL. <br /> STOREFRONT REFERENCE INTERIOR ELEVATIONS FOR WALL <br /> T-1 (REF MATERIAL T-2 (REF MATERIAL 3/4" FIRE TREATED FINISHES. <br /> SCHEDULE)ADHERE SCHEDULE)ADHERE PLYWOOD ATTACHED <br /> PER MANUFACTURERS PER MANUFACTURERS W/ 1"TYPE "S" SCREWS SN4 REFERENCE SHEET A6.1 FOR BASE TYPES. <br /> = RECOMMENDATIONS = RECOMMENDATIONS @ 16" O.C. ALONG <br /> o (D EDGES & IN THE FIELD FIRE EXTINGUISHER: #10 CLASS ABC WITH UL RATING <br /> U U OF THE BOARD. 4A-60BC. SURFACE MOUNTED ON WALL WITH <br /> JOINTED ORIENTED SN5 MANUFACTURERS ALL STEEL WALL BRACKET. JL <br /> 1/2" MOISTURE 1/2" MOISTURE VERTICALLY AND INDUSTRIES INC. (COSMIC 10E) OR APPROVED EQUAL <br /> RESISTANT GREE GYP RESISTANT GREE GYP STAGGERED ON WITH INSPECTION TAG AS REQUIRED BY LOCAL <br /> BD. ATTACHED TO BD. ATTACHED TO OPPOSITE SIDES OF CODES. <br /> METAL STUDS W/ 1-1/4" METAL STUDS W/ 1-1/4" ASSEMBLY TO BOTTOM <br /> HOT DIPPED HOT DIPPED OF ROOF DECK. CONTRACTOR TO INSTALL 7-ELEVEN PROVIDED COAT PR#2 01 .06.2020 <br /> GALVANIZED SCREWS GALVANIZED SCREWS — HOOKS FOR EMPLOYEES. REFERENCE SHEET <br /> @ 8" O.C. @ 8" O.C. EF1ITEM 220. INSTALL 3 IN THE OFFICE. LOCATION TO <br /> MERCHANDISE BE DETERMINED BY CONSTRUCTION PROJECT <br /> 101 MANAGER. SEE DOOR HARDWARE SCHEDULES. <br /> • APPLY 3M SUN CONTROL WINDOW FILMS @ ALL REVISIONS <br /> B-2- REF: A6.1 FOR B-2- REF: A6.1 FOR U SOUTH, EAST, AND WEST FACING GLASS (3M-1). NOTE <br /> MATERIALS SCHEDULE MATERIALS SCHEDULE - NO FILM SHOULD BE APPLIED TO THE STOREFRONT <br /> DOORS. (REFERENCE SHEET A6.1 FOR MATERIALS 1 PR#1 12.23.19 <br /> SCHEDULE). <br /> IBG AT RESTROOMS ILM PLY G.C. TO FURNISH AND INSTALL RIS BACKBOARD AT ISP <br /> & DESK. REFERENCE MATERIALS SCHEDULE ON SHEET <br /> HALLWAY A6.1. <br /> • PROTECT SURROUNDING AREAS AND SURFACES <br /> FROM DUST, CONTACT WITH OVERSPRAY FROM <br /> DENSIFIER, PROTECTIVE SURFACE TREATMENT, & <br /> Al P JOINT FILLER. CLEAN SURFACES FROM DUST, DEBRIS, <br /> OIL, GREASE, CURING AGENTS, AND OTHER SURFACE <br /> CONTAMINANTS THAT MAY ADVERSELY AFFECT <br /> INSTALLTATION OF POLISHED CONCRETE. <br /> REFERENCE SPECIFICATION SECTIONS 033000 CAST- <br /> 1/2" GYP. BD. (PAINTED REF. 1/2" GYP. BD. (PAINTED REF. IN-PLACE CONCRETE AND 033536 POLISHED <br /> 1 INTERIOR ELEVATIONS) INTERIOR ELEVATIONS) CONCRETE FLOOR FINISH DATED 02-26-2018, <br /> ATTACHED W/ 1"TYPE 'S' ATTACHED W/ 1"TYPE 'S' FREEZER PROVIDED BY 7-ELEVEN, FOR ALL NEW INTERIOR <br /> SCREWS @ 8" O.C. ALONG SCREWS @ 8" O.C. ALONG 1 O$ <br /> CONCRETE FLOORS. <br /> EDGES, @ 12" O.C. IN THE EDGES, @ 12" O.C. IN THE <br /> FIELD OF THE BOARD. FIELD OF THE BOARD. <br /> JOINTS ORIENTED JOINTS ORIENTED IBU <br /> VERTICALLY AND VERTICALLY AND O CSN3 <br /> STAGGERED ON OPPOSITE STAGGERED ON OPPOSITE <br /> SIDES OF ASSEMBLY TO 1/2" MOISTURE SIDES OF ASSEMBLY TO <br /> BOTTOM OF ROOF DECK. RESISTANT GREEN BOTTOM OF ROOF DECK. / <br /> PAINT ABOVE FRP (REF. GYP BD. ATTACHED TO PAINT ABOVE &AROUND ICE <br /> INTERIOR ELEVATIONS) METAL STUDS W/ 1-1/4" STOREFRONT (REF. 109 <br /> HOT DIPPED INTERIOR ELEVATIONS) <br /> GALVANIZED SCREWS <br /> = @8" O.C. = <br /> COOLER <br /> 1 P-4- REF: A6.1 FOR VAULT <br /> o MATERIALS SCHEDULE 110 <br /> I I I I I I <br /> I I I I I I <br /> 1 1 T-5 (REF MATERIAL <br /> FRP-1 (REF MATERIAL SCHEDULE)ADHERE <br /> SCHEDULE)ADHERE PER MANUFACTURERS <br /> PER MANUFACTURERS RECOMMENDATIONS SEAL/SIGNATURE <br /> RECOMMENDATIONS <br /> JOB NO. 1497.009 <br /> I I I I I I <br /> 1 B-1 - REF: A6.1 FOR 1 B-2- REF: A6.1 FOR B-1 - REF: A6.1 FOR DRAWN JK <br /> MATERIALS SCHEDULE MATERIALS SCHEDULE MATERIALS SCHEDULE <br /> CHECK GM <br /> FRP, I PNT WALL SUBSTRATE & <br /> WALL FINISH PLAN <br /> 0 <br /> SUBSTRATE AND WALL FINISH TYPES FINISH PLAN <br /> 0 <br /> N 1" = 1'-0" 1/4" = 1'-0" HEET <br /> 0 <br /> No 1 2 4 8 <br /> SCALE: 1/4"= 1'-0" PNOJECT <br />