Laserfiche WebLink
ELEVATION GENERAL NOTES i 1 <br /> • SEE FINISH SCHEDULE ON SHEET A6.1 FOR <br /> A B D EXTERIOR FINISH MATERIALS <br /> • PAINT ALL EXPOSED SURFACES <br /> 1 8 23 2 ALL EXTERIOR FINISH TO BE CP-1 U.O.N. 5865 Owens Drive <br /> P-4 P-4 P-4 SD-1 <br /> A9.4 A9.1 A9.1 A9.4Pleasanton, CA 94588 <br /> T.O.W ALL EXTERIOR PAINT TO BE P 1 U.O.N. 925-251-7200 <br /> 21'-6 <br /> 24'-�" ALL HIGH SLOPED ROOFS TO BE F-1 RU.O.N. <br /> ALL LOW SLOPED ROOFS TO BE RF-2 U.O.N. <br /> • ALL EXTERIOR SOFFITS TO BE CP-1 U.O.N. <br /> • FOR FINISHES RELATED TO HARDSCAPE AND SITE <br /> ACCESSORIES <br /> • FOR FINISHES REALTED TO FIXTURES S.M.D., S.P.D. <br /> AND S.E.D. <br /> • FOR ALL DOORS, WINDOWS AND STOREFRONT <br /> K5 K5 K5 SYSTEMS AND TYPES SEE SCHEDULE ON <br /> SHEET A6.0 <br /> K7 1<16 K2 K16 FOR ALL T.O.R., T.O.W.AND T.O.P. HEIGHTS SEE CONSULTANT <br /> ROOF PLAN A2.4 <br /> — — — _ T•O•P• Ac� FOR TYPICAL PLASTER EXPANSION JOINTS, <br /> CENTER AT OPENINGS AND ALIGN WITH <br /> 41.13 ARCHITECTURAL FRAMING. <br /> • ALL MECHANICAL VENT/LOUVERS ARE TO BE FLAME <br /> K5 10'-10" 4'-0" 4'6" 1�" A9.1 AND EMBER RESISTANT. <br /> • STONE/BRICK LAYOUT PATTERN IS DIAGRAMMATIC <br /> ELEvEn <br /> EQ EQ EQ EQ EQ EQ 22 ONLY, SEE SPECIFICATIONS FOR SPECIFIC <br /> K11 _ - A9.1 PATTERN. <br /> co <br /> 7-11 #1043581 <br /> GROUND FLOOR oaa KEYNOTE LEGEND <br /> 41.13 (N)GREENSCREEN VERTICAL TRELLIS, SEE DET. 27/A9.1 <br /> P-3 P-3 P 2 P-1 BRK-2 BRK 1 P 1 P-2 BRK-1 BRK 2 FOR MORE INFORMATION <br /> CP-1 CP 1 CP-1 CP 1 CP 1 26 K2 EXP. JOINTS AS INDICATED, SEE DETAIL <br /> K5 WALL SCONCE, SEE ELECTRICAL DRAWING <br /> A9.1 K7 PREFINISHED MTL CANOPY, SEE MATERIAL SCHEDULE <br /> W EST ELEVATION AND DETAIL SHEETS <br /> 1 K8 SECURITY CAMERA,TYP. <br /> 1/4" - 11-011 K11 ELECTRICAL MDP, METER,AND CT CABINET LLI <br /> K14 CO2 CAGE z w <br /> K15 NITROGEN CAGE O ry <br /> K16 PREFINISHED DARK BRONZE LOUVER, S.M.D. (TYP.) rn <br /> C/ <br /> J z <br /> QU <br /> � z <br /> w0 <br /> z 0 � <br /> QU <br /> (0 < O <br /> N � <br /> zU) <br /> 06 O <br /> U) <br /> O J <br /> z <br /> 2.5 2 <br /> 2 1 g CP 1 P R#2 01 .06.2020 <br /> BRK-1 P-4 A9.4 SD-1 A9 4 A9.1 P-4 P-3 P-4 <br /> 21'-6" 21'-6" 24'-0" <br /> INV <br /> 19'-6" Ax REVISIONS <br /> 1 PR#1 12.23.19 <br /> K8 - o <br /> �4 0 0 0 0 <br /> 0 <br /> K7 T.O.P. <br /> 23 K2 K5 <br /> A9.1 EQ. EQ. <br /> A9.4 i i o <br /> I I I <br /> 11h MINN <br /> 101B 107A <br /> P-3 <br /> Ll <br /> GROUND FLOOR <br /> 0 <br /> BRK-2 BRK-1 P-2 K14 K15 EP-1 BRK-2 BR -1 P 2 P-1 13 <br /> CP-1 CP-1 26 ECP-1 CP-1 <br /> A9.4 <br /> A9.1 <br /> NORTH ELEVATION SEAL/SIGNATURE <br /> 2 1/4" - 1'-0" JOB NO. 1497.009 <br /> DRAWN JK <br /> CHECK GM <br /> EXTERIOR <br /> ELEVATIONS <br /> 75 <br /> 0 <br /> NSHEET <br /> 0 <br /> 0 <br /> 1 2 4 8 <br /> SCALE: 1/4"= 1'-0" <br /> A301 <br />