Laserfiche WebLink
MECHANICAL SPECIFICATIONS <br /> 1. GENERAL <br /> 1.1 GENERAL REQUIREMENTS: 1.8 WARRANTIES: 2.4 DIFFUSERS AND GRILLES (OWNER PROVIDED): <br /> 1.1.1 REQUIREMENTS UNDER DIVISION ONE AND THE GENERAL AND SUPPLEMENTARY CONDITIONS 1.8.1 WARRANT EACH SYSTEM AND EACH ELEMENT THEREOF AGAINST ALL DEFECTS DUE TO 2.4.1 ALL SUPPLY AND RETURN AIR DEVICES SHALL INSTALLED BY THE MECHANICAL CONTRACTOR. <br /> OF THESE SPECIFICATIONS SHALL BE A PART OF THIS SECTION. EACH CONTRACTOR SHALL BECOME FAULTY WORKMANSHIP, DESIGN OR MATERIAL FOR A PERIOD OF 12 MONTHS FROM DATE OF <br /> THOROUGHLY ACQUAINTED WITH ITS CONTENTS AS TO REQUIREMENTS THAT AFFECT THIS DIVISION OR SUBSTANTIAL COMPLETION, UNLESS SPECIFIC ITEMS ARE NOTED TO CARRY A LONGER WARRANTY IN 2.4.2 ALL AIR TERMINAL DEVICES SHALL BE INSTALLED AS SHOWN ON THE PLANS IN ORDER TO <br /> SECTION. THE WORK REQUIRED UNDER THIS SECTION INCLUDES MATERIAL, EQUIPMENT, APPLIANCES, THE CONSTRUCTION DOCUMENTS OR MANUFACTURER'S STANDARD WARRANTY EXCEEDS 12 HANDLE THE DESIGNED AIR FLOW CAPACITIES WITH A MINIMUM AMOUNT OF NOISE AND STATIC <br /> TRANSPORTATION, SERVICES,AND LABOR REQUIRED TO COMPLETE THE ENTIRE SYSTEM AS REQUIRED BY MONTHS. REMEDY ALL DEFECTS, OCCURRING WITHIN THE WARRANTY PERIOD(S), AS STATED IN THE PRESSURE. <br /> THE DRAWINGS AND SPECIFICATIONS. HEREAFTER IN THIS SPECIFICATION, THE WORD "MECHANICAL GENERAL CONDITIONS AND DIVISION 1. <br /> CONTRACTOR"SHALL REFER TO THE INSTALLING MECHANICAL CONTRACTOR AND "OWNER"SHALL REFER 2.5 CONDENSATE DRAINS: <br /> TO 7-ELEVEN. 1.8.2 WARRANTIES SHALL INCLUDE LABOR AND MATERIAL. MAKE REPAIRS OR REPLACEMENTS <br /> WITHOUT ANY ADDITIONAL COSTS TO THE OWNER. 2.5.1 THE MECHANICAL CONTRACTOR SHALL PROVIDE AND INSTALL AS A MINIMUM A 4" DEEP P-TRAP 5865 Owens Drive <br /> 1.1.2 THE SPECIFICATIONS AND DRAWINGS FOR THE PROJECT ARE COMPLEMENTARY, AND ON CONDENSATE DRAIN OUTLETS WHERE THE CONDENSATE WATER WILL EXIT THE P-TRAP AT A POINT 1" Pleasanton, CA 94588 <br /> PORTIONS OF THE WORK DESCRIBED IN ONE, SHALL BE PROVIDED AS IF DESCRIBED IN BOTH. IN THE 1.8.3 PERFORM THE REMEDIAL WORK PROMPTLY, UPON WRITTEN NOTICE FROM THE ENGINEER LOWER THAN THE DRAIN CONNECTION AT THE UNIT. THE MECHANICAL CONTRACTOR SHALL PROVIDE <br /> EVENT OF DISCREPANCIES, NOTIFY THE ENGINEER AND/OR OWNER AND REQUEST CLARIFICATION PRIOR OR OWNER. AND INSTALL CONDENSATE LINES AS REQUIRED TO MEET LOCAL CODES AND AS SHOWN ON THE 925-251-7200 <br /> TO PROCEEDING WITH THE WORK INVOLVED. MECHANICAL PLANS. THESE LINES SHALL BE SLOPED AWAY FROM THE UNITS, SUPPORTED AS REQUIRED <br /> 1.8.4 AT THE TIME OF SUBSTANTIAL COMPLETION, DELIVER TO THE OWNER ALL WARRANTIES, IN TO ASSURE PROPER FLOW,AND AT THE MECHANICAL CONTRACTOR'S OPTION, CONDENSATE DRAIN LINES <br /> 1.2 INSPECTION OF SITE: WRITING AND PROPERLY EXECUTED, INCLUDING TERM LIMITS FOR WARRANTIES EXTENDING BEYOND MAY BE SCHEDULE 40 PVC OR COPPER. ALL JOINTS SHALL BE SECURELY GLUED OR SOLDERED AS <br /> THE ONE YEAR PERIOD, EACH WARRANTY INSTRUMENT BEING ADDRESSED TO THE OWNER AND REQUIRED. INSULATE WITH 3/4"THICK PIPE INSULATION WHERE REQUIRED. <br /> 1.2.1 PRIOR TO SUBMITTING BID, VISIT THE SITE OF THE PROPOSED WORK AND BECOME FULLY STATING THE COMMENCEMENT DATE AND TERM. <br /> INFORMED AS TO THE CONDITIONS UNDER WHICH THE WORK IS TO BE DONE. FAILURE TO DO SO WILL NOT 2.6 CONTROLS: <br /> BE CONSIDERED SUFFICIENT JUSTIFICATION TO REQUEST OR OBTAIN EXTRA COMPENSATION OVER AND 1.9 CUTTING AND PATCHING: <br /> ABOVE THE CONTRACT PRICE. 2.6.1 RTU CONTROLS PROVIDED BY OWNER. COORDINATE LOCATIONS FOR THERMOSTAT AND <br /> 1.9.1 PERFORM CUTTING OF WALLS, FLOORS, CEILINGS, ETC.AS REQUIRED TO INSTALL WORK SENSORS FOR ROUGH-IN. <br /> 1.3 MATERIAL AND WORKMANSHIP: UNDER THIS SECTION. OBTAIN PERMISSION FROM THE ARCHITECT PRIOR TO CUTTING. DO NOT CUT <br /> OR DISTURB STRUCTURAL MEMBERS WITHOUT PRIOR APPROVAL FROM THE ARCHITECT. CUT HOLES 2.6.2 SMOKE DETECTORS AND SAMPLING TUBES PROVIDED AND INSTALLED TO THE UNITS AND IN <br /> 1.3.1 PROVIDE NEW MATERIAL, EQUIPMENT, AND APPARATUS UNDER THIS CONTRACT UNLESS AS SMALL AS POSSIBLE. GENERAL CONTRACTOR SHALL PATCH WALLS, FLOORS, ETC. AS REQUIRED THE DUCTWORK BY CARRIER. THE SMOKE DETECTORS SHALL DISABLE HVAC UNIT OPERATION UPON <br /> OTHERWISE STATED HEREIN, OF BEST QUALITY NORMALLY USED FOR THE PURPOSE IN GOOD BY WORK UNDER THIS SECTION. PATCHING SHALL MATCH THE ORIGINAL MATERIAL AND ACTIVATION. <br /> COMMERCIAL PRACTICE, AND FREE FROM ANY DEFECTS. MODEL NUMBERS LISTED IN THE SPECIFICATIONS CONSTRUCTION. REPAIR AND REFINISH AREAS DISTURBED BY WORK TO THE CONDITION OF <br /> OR SHOWN ON THE DRAWINGS ARE NOT NECESSARILY INTENDED TO DESIGNATE THE REQUIRED TRIM, ADJOINING SURFACES IN A MANNER SATISFACTORY TO THE ARCHITECT. 2.7 ELECTRICAL: <br /> WRITTEN DESCRIPTIONS OF THE TRIM GOVERN MODEL NUMBERS. <br /> 1.10 ROUGH-IN: 2.7.1 LOW VOLTAGE WIRING-ALL PROVISIONS FOR LOW VOLTAGE WIRING SHALL BE PERFORMED CONSULTANT <br /> 1.3.2 WORK PERFORMED UNDER THIS CONTRACT SHALL PROVIDE A NEAT AND "WORKMANLIKE" BY THE MECHANICAL CONTRACTOR UNLESS CODES OR LABOR SITUATIONS DO NOT PERMIT. IF THE <br /> APPEARANCE WHEN COMPLETED, TO THE SATISFACTION OF THE ARCHITECT AND ENGINEER. 1.10.1 COORDINATE WITHOUT DELAY ROUGHING-IN WITH GENERAL CONSTRUCTION. CONCEAL MECHANICAL CONTRACTOR CAN NOT PERFORM LOW VOLTAGE WIRING, THE MECHANICAL CONTRACTOR <br /> WORKMANSHIP SHALL BE THE FINEST POSSIBLE BY EXPERIENCED MECHANICS. INSTALLATIONS SHALL PIPING AND CONDUIT ROUGH-IN EXCEPT IN UNFINISHED AREAS AND WHERE OTHERWISE SHOWN. SHALL INFORM THE GENERAL CONTRACTOR, AS PART OF THE HVAC BID DOCUMENT, TO HAVE THE <br /> COMPLY WITH APPLICABLE CODES AND LAWS. ELECTRICAL SUBCONTRACTOR INCLUDE THIS WORK IN THEIR BID. <br /> 1.11 STRUCTURAL STEEL: <br /> 1.3.3 THE COMPLETE INSTALLATION SHALL FUNCTION AS DESIGNED AND INTENDED WITH RESPECT 2.7.2 POWER WIRING-ALL ELECTRICAL POWER WIRING TO INCLUDE FINAL CONNECTIONS SHALL BE <br /> TO EFFICIENCY, CAPACITY, NOISE LEVEL, ETC.ABNORMAL NOISE CAUSED BY RATTLING EQUIPMENT, 1.11.1 STRUCTURAL STEEL USED FOR PIPE SUPPORTS, EQUIPMENT SUPPORTS, ETC., SHALL BE PROVIDED BY THE GENERAL CONTRACTOR'S ELECTRICAL SUBCONTRACTOR. <br /> PIPING, DUCTS,AIR DEVICES, AND SQUEAKS IN ROTATING COMPONENTS WILL NOT BE ACCEPTABLE. IN NEW, CLEAN,AND CONFORM TO ASTM DESIGNATION A-36. <br /> GENERAL, MATERIALS AND EQUIPMENT SHALL BE OF COMMERCIAL SPECIFICATION GRADE IN QUALITY. 2.8 GAS PIPING: <br /> LIGHT DUTY AND RESIDENTIAL TYPE EQUIPMENT WILL NOT BE ACCEPTED. 1.11.2 SUPPORT PLUMBING AND MECHANICAL EQUIPMENT AND PIPING FROM THE BUILDING so <br /> STRUCTURE. DO NOT SUPPORT PLUMBING EQUIPMENT FROM CEILINGS, OTHER MECHANICAL OR 2.8.1 SCHEDULE 40 BLACK CARBON STEEL WITH MALLEABLE IRON THREADED FITTINGS. PROVIDE <br /> 1.3.4 REMOVE FROM THE PREMISES WASTE MATERIAL PRESENT AS A RESULT OF WORK, INCLUDING ELECTRICAL COMPONENTS,AND OTHER NON-STRUCTURAL ELEMENTS. SHUT-OFF VALVE, DIRT LEG,AND UNION AT EACH ROOFTOP UNIT. PAINT ALL GAS PIPING EXPOSED TO ELEvEn <br /> CARTONS, CRATING, PAPER, STICKERS, AND/OR EXCAVATION MATERIAL NOT USED IN BACKFILLING, ETC. WEATHER WITH ONE COAT OF PRIMER, AND TWO COATS OF RUST-PROOF PAINT. COLOR SHALL MATCH <br /> CLEAN EQUIPMENT INSTALLED UNDER THIS CONTRACT TO PRESENT A NEAT AND CLEAN INSTALLATION AT 1.12 ACCESS DOORS: BUILDING COLORS. COORDINATE WITH OWNER'S CONSTRUCTION MANAGER. <br /> THE TERMINATION OF THE WORK. <br /> 1.12.1 PROVIDE ACCESS DOORS IN CEILINGS AND WALLS WHERE INDICATED OR REQUIRED FOR 2.8.2 TREATED WOOD BLOCKING 6X6X12, 8'-0"OC MAX WITH GALVANIZED PIPE STRAP, 1 1/4"ZINC <br /> 1.3.5 REPAIR OR REPLACE PUBLIC AND PRIVATE PROPERTY DAMAGED AS A RESULT OF WORK ACCESS TO CONCEALED VALVES AND EQUIPMENT INSTALLED UNDER THIS SECTION. PROVIDE COATED LAG SCREWS, AND RUBBER WALKPAD ADHERED TO ROOF. <br /> PERFORMED UNDER THIS CONTRACT TO THE SATISFACTION OF AUTHORITIES AND REGULATIONS HAVING CONCEALED HINGES, SCREWDRIVER-TYPE LOCK,ANCHOR STRAPS; MANUFACTURED BY MILCOR, <br /> JURISDICTION. ZURN, TITUS, OR EQUAL. OBTAIN ARCHITECT'S APPROVAL OF TYPE, SIZE, LOCATION, AND COLOR 2.9 REFRIGERATION LINES: <br /> BEFORE ORDERING. <br /> 1.4 COORDINATION: 2.9.1 REFRIGERATION LINE SETS FOR HVAC UNITS ARE TO BE PROVIDED AND INSTALLED BY THE <br /> 1.13 PENETRATIONS: MECHANICAL CONTRACTOR. <br /> 1.4.1 COORDINATE WORK WITH THAT OF OTHER TRADES SO THAT THE VARIOUS COMPONENTS OF <br /> THE SYSTEMS THAT ARE BEING INSTALLED AND/OR EXISTING SYSTEMS WILL BE INSTALLED AT THE PROPER 1.13.1 SEAL FLOOR, EXTERIOR WALL AND ROOF PENETRATIONS WATER AND WEATHER TIGHT 2.10 MECHANICAL CONTRACTOR RESPONSIBILITIES: <br /> TIME, WILL FIT THE AVAILABLE SPACE,AND WILL ALLOW PROPER SERVICE ACCESS TO THOSE ITEMS WITH APPROPRIATE NON-SHRINK, NON-HARDENING COMMERCIAL CONSTRUCTION SEALANT. SEAL <br /> REQUIRING MAINTENANCE. COMPONENTS WHICH ARE INSTALLED WITHOUT REGARD TO THE ABOVE SHALL ROOF PENETRATIONS WITH 4 POUND PER SQUARE FOOT LEAD FLASHING. PROVIDE A SLEEVE, AND 2.10.1 AFTER COMPLETION OF THE WORK DESCRIBED IN THIS SPECIFICATION AND SHOWN ON THE <br /> BE RELOCATED AT NO ADDITIONAL COST TO THE OWNER. SEAL NON-FIRE-RATED FLOOR AND WALL PENETRATIONS WITH FIBERGLASS PACKING AND SILICONE DRAWINGS, THE MECHANICAL CONTRACTOR SHALL THOROUGHLY CLEAN ALL EXPOSED EQUIPMENT, <br /> CAULK(FOR ACOUSTICAL INSULATION). REMOVING ALL LABELS AND STICKERS NOT CONTAINING OPERATION INSTRUCTION. MECHANICAL <br /> 1.4.2 UNLESS OTHERWISE INDICATED, THE GENERAL CONTRACTOR WILL PROVIDE CHASES AND CONTRACTOR SHALL REMOVE CRATING DEBRIS, LEAVING THE INSTALLATION FINISHED AND READY FOR <br /> OPENINGS IN BUILDING CONSTRUCTION REQUIRED FOR INSTALLATION OF THE SYSTEMS SPECIFIED HEREIN. 1.13.2 COORDINATE FIRE RATING REQUIREMENTS AND LOCATIONS WITH THE ARCHITECT. SEAL OPERATION, TO INCLUDING CLEAN FILTERS IN AIR HANDLING UNITS. <br /> MECHANICAL CONTRACTOR SHALL FURNISH THE GENERAL CONTRACTOR WITH INFORMATION WHERE PENETRATIONS OF FIRE-RATED ASSEMBLIES WITH 3M#CP-25 FIRE BARRIER CAULK(PROVIDE <br /> CHASES AND OPENINGS ARE REQUIRED, KEEP INFORMED AS TO THE WORK OF OTHER TRADES ENGAGED THICKNESS AND METHOD AS REQUIRED AND RECOMMENDED BY MANUFACTURER)TO MAINTAIN THE <br /> IN THE CONSTRUCTION OF THE PROJECT,AND EXECUTE WORK IN A MANNER AS TO NOT INTERFERE WITH FIRE RESISTANCE RATING OF FIRE-RATED ASSEMBLIES. <br /> OR DELAY THE WORK OF OTHER TRADES. <br /> 1.13.3 SEAL EXTERIOR WALL PENETRATIONS BELOW GRADE WITH CAST IRON WALL PIPES AND Lij <br /> 1.4.3 FIGURED DIMENSIONS SHALL BE TAKEN IN PREFERENCE TO SCALE DIMENSIONS. MECHANICAL MODULAR MECHANICAL SLEEVE SEALS, MANUFACTURED BY THUNDERLINE/LINK SEAL, CALPICO, INC w <br /> CONTRACTOR SHALL TAKE HIS OWN MEASUREMENTS AT THE BUILDING, AS VARIATIONS MAY OCCUR. AND METRAFLEX. <br /> MECHANICAL CONTRACTOR WILL BE HELD RESPONSIBLE FOR ERRORS THAT COULD HAVE BEEN AVOIDED O <br /> BY PROPER CHECKING AND INSPECTION. 1.13.4 PROVIDE SLEEVES FOR HORIZONTAL PIPE PASSING THROUGH OR UNDER FOUNDATION. <br /> SLEEVES SHALL BE CAST IRON SOIL PIPE TWO NOMINAL PIPE SIZES LARGER THAN THE PIPE SERVED. � ) U) <br /> 1.4.4 PROVIDE MATERIALS WITH TRIM THAT WILL PROPERLY FIT THE TYPES OF CEILING, WALL, OR �/J <br /> FLOOR FINISHES ACTUALLY INSTALLED. MODEL NUMBERS LISTED IN THE SPECIFICATIONS OR SHOWN ON 1.13.5 PROVIDE SLEEVES FOR VERTICAL PIPE PASSING THROUGH SLAB ON GRADE. SLEEVES J z Q <br /> THE DRAWINGS ARE NOT INTENDED TO DESIGNATE THE REQUIRED TRIM. SHALL BE SCHEDULE 40 PVC PIPE, TWO NOMINAL PIPE SIZES LARGER THAN THE PIPE SERVED. SEAL Q U <br /> WATER-TIGHT WITH SILICONE CAULK. CC <br /> 1.4.5 MECHANICAL CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR DUCTWORK LAYOUT TO THE G <br /> CONSTRUCTION PROJECT MANAGER FOR OWNER APPROVAL PRIOR TO INSTALLATION. 2. HEATING, VENTILATION, AND AIR CONDITIONING z <br /> w z <br /> 1.5 ORDINANCES AND CODES: 2.1 DUCTWORK: 06 <br /> 1.5.1 WORK PERFORMED UNDER THIS CONTRACT SHALL, AT A MINIMUM, BE IN CONFORMANCE WITH 2.1.1 MECHANICAL CONTRACTOR SHALL PROVIDE ANY DUCTWORK NECESSARY FOR A > U <br /> APPLICABLE NATIONAL, STATE AND LOCAL CODES HAVING JURISDICTION. EQUIPMENT FURNISHED AND COMPLETE INSTALLATION OF HVAC SYSTEMS (INCLUDING EXHAUST SYSTEMS).ALL DUCTWORK r^ Q O <br /> ASSOCIATED INSTALLATION WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN STRICT COMPLIANCE IDENTIFICATION AND INSTALLATION TO ADHERE TO SMACNA STANDARDS AND ALL GOVERNING �1/ >> <br /> WITH CURRENT APPLICABLE CODES ADOPTED BY THE LOCAL AHJ INCLUDING ANY AMENDMENTS AND CODES. N <br /> STANDARDS AS SET FORTH BY THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), UNDERWRITERS z U) <br /> LABORATORIES (UL), OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA),AMERICAN SOCIETY OF 2.1.2 ROUND PIPE DUCT RUNS SHALL BE CONSTRUCTED OF METAL PIPE WITH EXTERNAL <br /> MECHANICAL ENGINEERS (ASME),AMERICAN SOCIETY OF HEATING, REFRIGERATION,AND AIR SLEEVE INSULATION. 06 O <br /> CONDITIONING ENGINEERS (ASHRAE), AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI),AMERICAN U) <br /> SOCIETY OF TESTING MATERIALS (ASTM)AND OTHER NATIONAL STANDARDS AND CODES WHERE 2.1.3 DUCTWORK CONNECTIONS TO AIR DEVICES MUST BE MADE WITH HARDPIPE ELBOWS, O J <br /> APPLICABLE. WHERE THE CONTRACT DOCUMENTS EXCEED THE REQUIREMENTS OF THEIR REFERENCED COVERED WITH SLEEVE INSULATION. FLEX DUCT MUST NOT BE UTILIZED FOR A 90 DEGREE <br /> CODES, STANDARDS, ETC., THE CONTRACT DOCUMENTS SHALL TAKE PRECEDENCE. CONNECTION TO AN AIR DEVICE. <br /> 1.5.2 PROCURE AND PAY FOR PERMITS AND LICENSES REQUIRED FOR THE ACCOMPLISHMENT OF 2.1.4 BALANCING DAMPERS WITH DOUBLE LOCKING QUADS SHALL BE PROVIDED IN ALL ROUND z <br /> THE WORK HEREIN DESCRIBED. WHERE REQUIRED, OBTAIN, PAY FOR AND FURNISH CERTIFICATES OF PIPE TAKE-OFFS FROM THE MAIN TRUNKS, UNLESS OTHERWISE NOTED ON PLANS. <br /> INSPECTION TO OWNER. MECHANICAL CONTRACTOR WILL BE HELD RESPONSIBLE FOR VIOLATIONS OF THE <br /> LAW. 2.1.5 A MAXIMUM OF 6'OF FLEX DUCT MAY BE USED FOR FINAL CONNECTION OF SIDE WALL <br /> DIFFUSERS. <br /> 1.6 PROTECTION OF EQUIPMENT AND MATERIALS: <br /> 2.1.6 FLEX DUCT MUST BE PROPERLY SUPPORTED WITH ONE INCH STRAPS AND CUT TO <br /> 1.6.1 STORE AND PROTECT FROM DAMAGE EQUIPMENT AND MATERIALS DELIVERED TO JOB SITE. PROPER LENGTH TO PREVENT SAGGING. <br /> COVER WITH WATERPROOF, TEAR-RESISTANT, HEAVY TARP OR POLYETHYLENE PLASTIC AS REQUIRED TO <br /> PROTECT FROM PLASTER, DIRT, PAINT, WATER, OR PHYSICAL DAMAGE. EQUIPMENT AND MATERIAL THAT 2.1.7 FLEX DUCT SHALL BE OWENS-CORNING FOIL-BACK HIGH QUALITY U/L APPROVED. PLASTIC <br /> HAS BEEN DAMAGED BY CONSTRUCTION ACTIVITIES WILL BE REJECTED,AND MECHANICAL CONTRACTOR WRAPPED FLEX DUCT IS NOT ACCEPTABLE. <br /> IS OBLIGATED TO FURNISH NEW EQUIPMENT AND MATERIAL OF A LIKE KIND AS APPROVED BY OWNER. <br /> 2.1.8 RIGID ROUND DUCT SHALL BE USED FOR HOT FOODS EXHAUST. <br /> 1.6.2 KEEP PREMISES ROOM CLEAN FROM FOREIGN MATERIAL CREATED DURING WORK <br /> PERFORMED UNDER THIS CONTRACT. PIPING, EQUIPMENT, ETC., SHALL HAVE A NEAT AND CLEAN 2.2 INSULATION: <br /> APPEARANCE AT THE TERMINATION OF THE WORK. <br /> 2.2.1 SUPPLY AND RETURN DUCTWORK INSIDE THE BUILDING SHALL BE INSULATED WITH 1.5" <br /> 1.6.3 PLUG OR CAP OPEN ENDS OF DUCTWORK AND PIPING SYSTEMS WHILE STORED OR INSTALLED THICK ACOUSTICAL LINING WITH A MINIMUM R-VALUE OF 6.0 OR EXTERNALLY WRAPPED WITH 2"THICK BLDG DEPT. 10. 11 . 19 <br /> DURING CONSTRUCTION WHEN NOT IN USE TO PREVENT THE ENTRANCE OF DEBRIS INTO THE SYSTEMS. GLASS FIBER DUCT WRAP. <br /> 1.6.4 KEEP THE MANUFACTURER PROVIDED PROTECTIVE COVERINGS ON FLOOR DRAINS, FLOOR 2.2.2 SUPPLY AND RETURN DUCTWORK OUTSIDE THE BUILDING SHALL BE INSULATED WITH 2" <br /> SINKS, AND TRENCH DRAINS DURING CONSTRUCTION. REMOVE COVERINGS AT THE TERMINATION OF THE LINER WITH A MINIMUM R-VALUE OF 8.0 AND SEAL SEAMS WEATHER TIGHT. <br /> WORK AND POLISH EXPOSED SURFACES. <br /> 2.2.3 DEDICATED OUTSIDE AIR SUPPLY AND RELIEF DUCTWORK INSIDE THE BUILDING SHALL BE X REVISIONS <br /> 1.7 OPERATION AND MAINTENANCE INSTRUCTIONS: INSULATED WITH 2"THICK DUCT WRAP WITH A MINIMUM R-VALUE OF 6.0. <br /> 1.7.1 COLLECT AND COMPILE A COMPLETE BROCHURE OF FIXTURES, MATERIALS,AND EQUIPMENT 2.3 FINAL TESTING AND ADJUSTMENTS: <br /> FURNISHED AND INSTALLED ON THIS PROJECT. INCLUDE OPERATIONAL AND MAINTENANCE INSTRUCTIONS, <br /> MANUFACTURER'S CATALOG SHEETS, WIRING DIAGRAMS, PARTS LISTS,APPROVED SHOP DRAWINGS, AND 2.3.1 AIR BALANCE SHALL BE PERFORMED AT THE COMPLETION OF THE PROJECT. BALANCE <br /> DESCRIPTIVE LITERATURE FURNISHED BY THE MANUFACTURER. INCLUDE AN INSIDE COVER SHEET THAT EACH SUPPLY, RETURN, OUTSIDE AIR DEVICE WITHIN 5% OF REQUIREMENTS AND FURNISH A REPORT <br /> LISTS THE PROJECT NAME, DATE, OWNER,ARCHITECT, ENGINEER, GENERAL CONTRACTOR, TO THE CONSTRUCTION PROJECT MANAGER. THE ENTIRE HVAC SYSTEM MUST BE FULLY OPERABLE, <br /> SUBCONTRACTOR,AND AN INDEX OF CONTENTS. BALANCED,AND APPROVED BY OWNER'S REPRESENTATIVE ON THE DAY TENANT OPENS FOR <br /> BUSINESS. <br /> 1.7.2 SUBMIT COPIES OF LITERATURE BOUND IN APPROVED BINDERS TO THE ARCHITECT AND <br /> OWNER AT THE TERMINATION OF THE WORK. PAPER CLIPS, STAPLES, RUBBER BANDS,AND MAILING 2.3.2 ADJUST THERMOSTATS AND CONTROL DEVICES TO OPERATE AS INTENDED.ADJUST <br /> ENVELOPES ARE NOT CONSIDERED APPROVED BINDERS. FINAL APPROVAL OF MECHANICAL AND PUMPS, FANS, ETC. FOR PROPER AND EFFICIENT OPERATION. CERTIFY TO ARCHITECT THAT <br /> PLUMBING SYSTEMS WILL BE WITHHELD UNTIL THIS EQUIPMENT BROCHURE IS DEEMED COMPLETE BY THE ADJUSTMENTS HAVE BEEN MADE AND THAT SYSTEM IS OPERATING SATISFACTORILY. CALIBRATE, <br /> ARCHITECT, ENGINEER,AND OWNER. SET AND ADJUST AUTOMATIC TEMPERATURE CONTROLS. CHECK PROPER SEQUENCING OF <br /> INTERLOCK SYSTEMS, AND OPERATION OF SAFETY CONTROLS. <br /> 2.3.3 VERIFY ECONOMIZER OPERATION PER MANUFACTURER PROCEDURE. <br /> 11/15/19 <br /> SEAL/SIGNATURE <br /> JOB NO. 1497.009 <br /> DRAWN ZS <br /> CHECK CF <br /> MECHANICAL <br /> SPECIFICATIONS <br /> SHEET <br />