<br /> ABBREVIATIONS GENERAL NOTES PROJECT DIRECTORY GENERAL DRAWINGS
<br /> A K G0.0 TITLE SHEET ELEVEn
<br /> & and F.D. Floor Drain "GENERAL NOTES APPLY TO ALL CONSTRUCTION DOCUMENTS. 16. LIENS: ALL SUBCONTRACTORS AND THE GENERAL CONTRACTOR OWNER/APPLICANT
<br /> F.E. Fire Drain
<br /> Extinguisher K.D. Kiln Dried P.B. Panic Bar GO.1 SPECIFICATIONS
<br /> @ at g KIT. Kitchen S.G. Sheet Glass WILL DELIVER TO THE CONSTRUCTION PROJECT MANAGER, A TA BRENTWOOD, LLC C/O TEKIN ASSOCIATES
<br /> ABV. Above F.E.C. Fire Extinguisher Cabinet P.T.D. Paper Towel Dispenser
<br /> g KP.orKPL. Kick IateorKin Post sFlu. shutter A. GENERAL COMPLETE RELEASE OF ALL CLAIMS ARISING OUT OF THIS G0.2 SPECIFICATIONS
<br /> A.B. Anchor Bolt F.F. Finish Floor p g P.T.R. Paper Towel Receptor
<br /> KO. Knockout PAR. Parallel SHNG. Shingle 3201 DANVILLE BLVD., SUITE 210
<br /> A.C. Asphalt Concrete F.F.E. Finish Floor Elevation SDG. Siding CONTRACT.
<br /> PRPTParapet ALAMO, CA 94507 G0.3 CALGREEN REQUIREMENTS -NEW CONSTRUCTION
<br /> .
<br /> A.C.P Acoustical Ceiling Panel F.F.L. Finish Floor Line e 1. ALL CONTRACTORS AND SUBCONTRACTORS WILL THOROUGHLY
<br /> A.C.T. Acoustical Ceiling Tile FGL. Fiberglass PK. Parking SLO. Slope (469)458-0485 PHONE G0.4 CALGREEN REQUIREMENTS -NEW CONSTRUCTION
<br /> A.D. Area Drain F.H.S. Flat Head Screw or Fire Hose Station PBD. Particle Board FAMILIARIZE THEMSELVES WITH THESE CONSTRUCTION 17. PILFERAGE: EACH CONTRACTOR WILL BE RESPONSIBLE FOR CONTACT: MARK.TEKIN TEKINDEVELOPMENT.COM
<br /> LBL. Label PTN. Partition SOL. soldier @ G1.1 SITE ACCESSIBILITY(CBC 11 B)- NOTES & DIAGRAMS
<br /> A.D.H. Adhesive F.J. Floor Joist SP. Soundproof DOCUMENTS AND WILL VERIFY EXISTING SITE AND CONDITIONS HIS OWN EQUIPMENT AND MATERIALS USED IN CONSTRUCTION
<br /> ADJ Adjustable F.M. Foam Moldings LAB. Laboratory PV. Pave,(ING) SPC. Space G1.2 ACCESSIBILITY NOTES & DIAGRAMS CBC 11 B
<br /> A.F.F. Above Finish Floor FN. Fence LAD. Ladder PVMT. Pavement PRIOR TO SUBMITTING A BID. ALL SUBCONTRACTORS WILL INCLUDING THOSE ITEMS FURNISHED BY 7-ELEVEN, INC. AND ( ) 7-11 #1043581
<br /> L.B. La Bolt PER. Perimeter SGL. Spandrel Glass ARCHITECT
<br /> A.F.G. Above Finish Grade F.0 C. Face of Concrete g SPL. Special PROVIDE ALL LABOR, SUPERVISION, AND MATERIALS AS REQUIRED. DELIVERED TO THE JOB SITE, TO BE INSTALLED BY THE G1.3 ACCESSIBILITY NOTES & DIAGRAMS (CBC 11B)
<br /> A.H.U. Air Handling Unit F.O.F. Face of Finish L.G.L. Laminated Glass PEX. Pex Tubing SPH. Splash DAHLIN GROUP, INC. ARCHITECT- PLANNERS
<br /> A.H.J. AuthorityHaving Juristiction F.O.M. Face of Masonry LO. Layout PTR. Planter ALL WORK TO BE PERFORMED IN A GOOD AND WORKMANLIKE CONTRACTOR. 7-ELEVEN, INC. WILL NOT BE HELD LIABLE FOR 5865 OWENS DRIVE
<br /> g Y STGL. Stained Glass
<br /> ALSF Aluminum Storefront F.O.PLYW D. Face of Plywood L.H. Left Hand PLTG. Planting CIVIL DRAWINGS
<br /> Y STD. Standard MANNER ACCORDING TO THE TRUE INTENT AND MEANING OF THE STOLEN EQUIPMENT, MATERIALS OR DAMAGE OF THE SAME ON
<br /> ALT. Alternate F.O.S. Face of Stud L. Length PLAS. Plaster S.D. Storm Drain PLEASANTON, CA 94588
<br /> ALUM. Aluminum F.P. Fireproof LT. Light PLA. Plastic STIR. Structural DRAWINGS AND SPECIFICATIONS. THIS JOB SITE. (925)251-7288 PHONE
<br /> AP Acess Panel FPL. Fireplace LW. Lightweight P.G. Plate Glass SIPS. Structural Insulated Panel
<br /> A.P.C. Architectural Precast Concrete F.S. Floor Sink LMS. Limestone PVC. Polyvinyl Chloride CONTACT: STEPHANIE FUJIMURA
<br /> LTL. Lintel P.E. Porcelain Enamel sTCO. stucco 2. THIS ARCHITECT AND HIS PROFESSIONAL CONSULTANTS WILL NOT 18. GENERAL CONTRACTOR WILL BE RESPONSIBLE FOR REMOVAL OF
<br /> A.S. As Specified FAB. Fabricate SFLR. Subfloor EMAIL: STEPHANIE.FUJIMURA@DAHLINGROUP.COM C1.0 COVER SHEET
<br /> A.S.W. Aluminum Sash Window FDN. Foundation L.L. Live Load PCPL. Portland Cement Plaster SYD. Side Yard HAVE CONTROL OF AND WILL NOT BE RESPONSIBLE FOR DEBRIS ACCUMULATED BY EACH TRADE. HOWEVER, EACH TRADE
<br /> A.V. Audio/Visual FIX. Fixture or Fixed LOC. Locate PD. Pound C 1.1 NOTES
<br /> LLD. Loose Land P.C.F. Pd erCubcFoot SYN. Synthetic CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, WILL KEEP THE JOB SITE CLEAN AND SAFE AT ALL TIMES, ALONG
<br /> APPROX.
<br /> Approximate FLR. Floor SYS. System
<br /> ARCH.RCH. Pound p Architectural or Arched FLG. Flashing LPT. Low Point P.L.F. Pound per Linear Foot PROCEDURES OR SAFETY PRECAUTIONS AND PROGRAMS IN WITH A BROOM FINISH AT THE END OF EACH WORKING DAY. CIVIL ENGINEER C2.0 TOPOGRAPHIC SURVEY
<br /> FLX. Flexible L.F. Linear Foot PSI Pound per Square Inch CONNECTION WITH THE WORK ON THIS PROJECT OR FOR THE KIER+WRIGHT C3.0 DETAILS
<br /> B F.G. Float Glass L.S. Lag Screw PFN. Prefinished T
<br /> F.L. Flowline LAM. Laminate PREM. Premolded T. Tread or Top ACTS OR OMISSIONS OF THE CONTRACTOR, SUBCONTRACTOR OR 19. SCHEDULE OF WORK: THE CONSTRUCTION PROJECT MANAGER 2850 COLLIER CANYON RD. C3.1 DETAILS
<br /> B BsBottom FLUR. Florescent LAV. Lavatory T.&B. Top and Bottom ANY OTHER PERSONS PERFORMING ANY OF THE WORK ON THIS WILL STATE TO THE GENERAL CONTRACTOR DURING THE BIDDING LIVERMORE, CA 94551
<br /> B.O.BM. Boottomom of Beam FJT Flush Joint g LB.or# Pound Q T.&G. Tongue and Groove C3.2 TYPICAL SECTIONS
<br /> B.O.C. Bottom of Concrete LKR. Locker QT. Quarry Tile T.B. Towel Bar or Telephone Board SITE, NOR FOR THE FAILURE OF ANY OF THEM TO CARRY OUT THE PROCESS, THE REQUIRED NUMBER OF CALENDAR DAYS TO 916 245-8788 Ext. 2022 PHONE C4.0 HORIZONTAL CONTROL AND PAVING PLAN W
<br /> FLUOR. Fluorescent p
<br /> B.O.S. Bottom of Steel FRT. Fire-Retardant Treated LNDY. Laundry T.C. Trash Compactor WORK IN ACCORDANCE WITH THE INTENT OF THE CONTRACT AND COMPLETE THIS WORK. CONTACT: ZICO SARYEDDEAN, PE
<br /> BD. Board LVR. Louver R T.O.BM. Top of Beam C5.0 GRADING AND DRAINAGE PLAN W
<br /> FR. Frame e (ING) R. Riser or Right BLDG. Building F.S. Full Size g t T.O.C. Top of Curb or Concrete CONSTRUCTION DOCUMENTS. EMAIL: ZSARYEDDEAN@KIERWRIGHT.COM
<br /> BLKNG Block(Blocking) FUT. Future M R.H. Right Hand T.O.F.F. Top of Finish Floor 20. REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL AND C6.0 UTILITY PLAN O
<br /> BLW. Blocking FTG. Footing R.J. Roof Joist T.O.P. Top of Plate orTop
<br /> thing Pavement 3. ALL CONTRACTORS WILL PROVIDE ADEQUATE BRACING AND PLUMBING DRAWINGS FOR ADDITIONAL GENERAL NOTES, STRUCTURAL ENGINEER C7.0 EROSION CONTROL PLAN
<br /> BLW. Below (') Minute R.O. Rough Opening T.O.R. Top of Roof Sheathing FURR. Furring g �/�
<br /> BM. Beam F.W. Filtered Water M.B. Machine Bolt R.T. Rubber Tile T.O.S. Top of Steel SHORING TO ENSURE STRUCTURAL STABILITY OF THE BUILDING ABBREVIATIONS AND SYMBOLS. MOZAFFARI ENGINEERING C8.0 STORM WATER QUALITY CONTROL PLAN /'� v!
<br /> B.M. Beanch Mark FIX. Fixture or Fixed MH. Manhole R.W.L. Rain Water Leader T.O.S.F. To of Subfloor `/J
<br /> BSMT Basement MFR Manufacture,(ER) RAD.or R. Radius p AND ALL RELATED BUILDING COMPONENTS, IE: STRUCTURAL 1500 F STREET
<br /> FLR. Floor T.O.S.W. Top of Stem Wall
<br /> BTM. Bottom FLG. Flashing MRB. Marble RD. Round or Road or Roof Drain T.O.W. Top of Wall WALLS, INTERIOR WALL ASSEMBLIES, ETC. DURING THE 21. MATERIALS AND SYSTEMS NOTES ARE TYPICAL IN NATURE AND MODESTO, CA 95354 J Q
<br /> FLX. Flexible MAS. Masonry RECP. Receptacle T.N. Toe Nail CONSTRUCTION PHASE OF THIS PROJECT. APPLY TO MULTIPLE DRAWINGS. NOTES ON ANY ONE DRAWING ( ) ARCHITECTURAL DRAWINGS Q U
<br /> M.C. Medicine Cabinet 209 572-4430 PHONE
<br /> C F.G. Float Glass REF. Reference T.R.A. Toilet Room Accessories
<br /> F.L. Flowline MED. Medium REFR. Refrigerator(tion)(ant) T.S. Tube Steel ARE TO APPLY TO ALL OTHER SIMILAR MATERIALS AND SYSTEMS CONTACT: ANDRE MOZAFFARI
<br /> C.or C.W. Cold water M. Meter 4. WORK WILL BE COORDINATED WITH ALL TRADES IN ORDER TO AVOID UNLESS NOTED OTHERWISE. THE GENERAL NOTES APPLY TO ALL
<br /> FLUR. Florescent RESIL. Resilient TEL. Telephone
<br /> C.G. Corner Guard\ MW. Microwave EMAIL: ANDRE@MOZAFFARI.NET z
<br /> FJT Flush Joint REV. Revision TEMP. Tempered INTERFERENCE, AND AVOID OMISSIONS. THE CONSTRUCTION DOCUMENTS. A1.3 SITE PLAN
<br /> C.I. Cast Iron MM. Microwar p
<br /> FLUOR. Fluorescent RF.or R. Roof TER. Terrazzo
<br /> C.J. Construction Joint or Control MIN. Minimum
<br /> FRT. Fire-Retardant Treated RFT. Rafter THK. Thick 1 A1.4 DUMPSTER ENCLOSURE & DETAILS UJ O
<br /> Joint M.C. Medicine Cabinet MECHANICAL/PLUMBING/ELECTRICAL ENGINEER ,,,X
<br /> FR. Frame(D),(ING) RM. Room TLT. Toilet
<br /> C.J. Ceiling Joist M.D.O. Medium Density Overlay 5. ALL MATERIALS USED WILL BE NEW AND BEAR U.L. LABELS WHERE 22. ELEVATIONS REFERENCED ON ARCHITECTURAL DRAWINGS ARE A1.5 EGRESS PLAN � W
<br /> F.S. Full Size RS. Resawn(Rough Sawn) TYP. T REQUIRED AND MEET APPROPRIATE N.E.M.A. STANDARDS. TOP OF SLAB LEVELS UNLESS NOTED OTHERWISE. ACERTUS CONSULTING GROUP, LLC
<br /> C.L. Center Line M.R. Moisture Resistant or Mirror Typical
<br /> CLG. Ceiling FUT. Future M.G.L. Mirror Glass RUB. Rubber TKBD. Tackerboard A1.6 SLAB PLAN &CO2 SENSOR PLAN
<br /> FTG. Footing RW D. Redwood / 1
<br /> 9 v
<br /> C.M.U. Concrete Masonry Unit TV. Television
<br /> y MISC. Miscelleneous 14817 WEST 95TH STREET
<br /> FURR. Furring RL. Rail,(ING) T.I.G. Tem A2.0 FLOOR PLAN AND DIMENSION PLAN
<br /> C.P. cement Plaster MOD. Modular Tempered Insulated Glass 6. LAYOUT ALL PARTITIONS BEFORE BEGINNING CONSTRUCTION TO 23. GENERAL CONTRACTOR TO COORDINATE FLOOR AND WALL LENEXA, KS, 66215 � Q O
<br /> F.W. Filtered Water REC. Recess,(ED) A2.1 ENLARGED RESTROOM PLANS & DETAILS
<br /> C.T. Ceramic Tile MLD. Molding THR. Threshold
<br /> CAB. Cabinet M.R. Mop Receptor REF. Refer,(ENCS) T.B.R. To be Relocated PREVENT ERRORS BY DISCREPANCY.ALL DRYWALL PARTITIONS PENETRATIONS WITH THE CONSTRUCTION PROJECT MANAGER, (913)322-5150 Ext. 120 PHONE 1 A ,
<br /> G RFL. Reflect,(ED),(IVE),(OR) TOBR. To be Removed A2.2 WALL SUBSTRATE &WALL FINISH PLAN `V
<br /> CANT. Cantilever M.S. Machine Screw or Mop Sink WILL BE INSTALLED AS NOTED ON THE DRAWINGS. INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL AND CONTACT: RYAN BREWER, PE
<br /> Rebate Rabbet,
<br /> CLG. Ceiling G.B. Grab Bar MT. Mount RBT. T.P.D. Toilet Paper Dispenser PLUMBING. EMAIL: RYAN BREWER@ACERTUSGROUP.COM 2 A2.3 REFLECTED CEILING PLAN Z U)
<br /> CLO. Closet G.C. General Contractor MOV. Movable REG. Registar TPTN. Toilet Partition
<br /> REN. Reinforce 7. EACH SUBCONTRACTOR WILL AMEND AND MAKE GOOD AT HIS OWN O
<br /> CLR. Clear G.D. Garbage Disposal or Grade MULL. Mullion TOL. Tolerance A2.4 ROOF PLAN
<br /> RECP. Reinforced Concrete Pipe
<br /> C.O. Clean Out G.F.I. Ground Fault Interrupter MATL. Material T.S.L. Top of Concrete Slab �
<br /> COL. Column GR �/
<br /> D. Guard MAX. Maximum REM. Remove,(ABLE) T.J. Top of Joist COST, ANY DEFECTS OR OTHER FAULTS IN HIS WORKMANSHIP 24. FOR THE PURPOSE OF THESE DRAWINGS AND SPECIFICATIONS, LANDSCAPE ARCHITECT A3.0 EXTERIOR ELEVATIONS vJ
<br /> CONC. Concrete G.RAIL. Guard Railing MECH. Mechanical REQ'D Required TPG. Topping AND/OR HIS SUPPLIED MATERIALS. THE TERM "BY 7-ELEVEN" SHALL MEAN ITEM PROVIDED BY 7-
<br /> COND. Condenser G.S.M. Galvanized Sheet Metal MEMB. Membrane RET. Return TOR. To Remain GHD A3.1 EXTERIOR ELEVATIONS
<br /> CONT. Continuous GA. Gage,Gauge MET.or MTL. Metal R.A. Return Air T.B. Towel Bar ELEVEN, INC. AND INSTALLED BY CONTRACTOR AS PART OF THE J O _
<br /> CORR. Corridor GAL. Gallon MF. Metal Frame RVS. Reverse Side TR. Transom 8. ALL CONTRACTORS WILL GUARANTEE ALL LABOR AND CONTRACTOR WORK OF THIS CONTRACT. THE TERM "NOT IN CONTRACT" (NIC) 943 RESERVE DRIVE A4.0 BUILDING SECTIONS
<br /> CONST. Construction GALV. Galvanized R.O.W. Right of Way TRNB. Turnbuckle PROVIDED MATERIALS FOR A PERIOD OF ONE YEAR FROM DATE OF SHALL MEAN ITEM PROVIDED AND INSTALLED BY 7-ELEVEN, INC. A4.1 EXTERIOR WALL SECTIONS
<br /> MFR. Manufacture ROT. Rivet ROSEVILLE, CA 95678
<br /> CPT. Carpet GAR. Garage MIN. Minimum R&S Rod and Shelf 916 918-0632 PHONE
<br /> CPUC. Chlorinated Polyvinyl Chloride GKT. Gasket MIR. Mirror u OCCUPANCY. UNDER SEPARATE CONTRACT. ( ) A4.2 EXTERIOR WALL SECTIONS z
<br /> C.S. Countersunk GL. Glass RFH. Roof Hatch
<br /> MISC. Miscellaneous U.B.C. Uniform Building Code CONTACT: SCOTT ROBERTSON, LLA
<br /> CSMT. Casement GL.B. Glass Block RM. Room A5.0 INTERIOR ELEVATIONS- KEY PLAN
<br /> MS. Manufactured Supplied R.S. Rough Sawn U.L. Underwriter's Laboratory 9. VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO ORDERING, CUTTING 25. GENERAL CONTRACTOR TO COORDINATE WITH THE CONSTRUCTION EMAIL: SCOTT.ROBERTSON@GHD.COM
<br /> CT Ceramic Tile GCMU Glazed Concrete Masonry Units MUL. Mullion U.O.N. Unless Otherwise Noted 2 A5.1 INTERIOR ELEVATIONS
<br /> CTR(D) Center(ed) GLAM Glazed Laminate R.C.P. Round Concrete Pipe
<br /> CVR. Cover GLULAMorG.L. Glue Laminated MOLT. Multiple Row Rowlock LIC. undercut AND/OR INSTALLING MATERIAL, PRODUCT OR EQUIPMENT. IN THE PROJECT MANAGER FOR ALL ROOF PATCHWORK, REPAIR, AND/OR
<br /> CW Curtain Wall GRN. Granite
<br /> R.B. Rubber Base UR. Urinal EVENT OF ANY DISCREPANCIES, CONTACT THE CONSTRUCTION REPLACEMENT. 1 A5.2 INTERIOR ELEVATIONS GRN UNF. Unfinished
<br /> T. Grate,(ING) RBL. Rubber Stone PROJECT MANAGER BEFORE PROCEEDING WITH THAT WORK. A5.3 INTERIOR ELEVATIONS
<br /> D GRHS. Greenhouse (N) New UTL. Utility house N. North s B. DIMENSIONING 1�A5.4 FINISH FLOOR PLAN
<br /> d Penny(nails) GT. Grout N.E. Northeast (") secondy 10. ALL SUBCONTRACTORS WILL PROVIDE A CERTIFICATE OF
<br /> D.D. Deck Drain GUT. Gutter N.I.C. Not In Contract S. south V.C.T. Vinyl Composition Tile A6.0 STOREFRONT& DOORTYPES & SCHEDULES
<br /> DEMO. Demolition N.T.S. Not To Scale S.or SH. Shelf V.I.F. Verify In Field INSURANCE TO THE GENERAL CONTRACTOR PRIOR TO STARTING 1. ALL DIMENSIONS ARE IN FEET-INCHES UNLESS NOTED OTHERWISE.NSCOPE OF WORK A6.1 MATERIALS SCHEDULE
<br /> D.F. DriGPL. Gypsum Lath nking Fountain or Douglas Fir GPT. Gypsum Tile W. Northwest S.A. Supply Air V.S.W. Vinyl sash Window ANY WORK ON THIS PROJECT. CERTIFICATE OF INSURANCE
<br /> D.H. Double Hung GYP.BD.or G.B. Gypsum Board NO.or# Number S.A. Supply Air Grill V.T. Vinyl Tile A6.2 WALL PARTITION SCHEDULE
<br /> DBL. Double NOM. Nominal S.C. Solid Core VERT. Vertical CANNOT BE TERMINATED OR CANCELED WITHOUT 10 DAYS PRIOR 2. DIMENSIONS GOVERN. DO NOT SCALE DRAWINGS.
<br /> DEG. Degree NL. Nailable S.E. southeast VYL. Vinyl WRITTEN NOTICE TO THE CONSTRUCTION PROJECT MANAGER. THE WORK OF THIS CONTRACT INCLUDES A9.1 ARCHITECTURAL DETAILS- EXTERIOR
<br /> DEPT. Department H NAT. Natural S.C.D. See Civil Drawings V.J. V-Joint
<br /> DET. Detail 3. VERIFY DIMENSIONS IN THE FIELD BEFORE PROCEEDING WITH THE PROVIDING ALL LABOR, MATERIALS, EQUIPMENT AND A9.2 ARCHITECTURAL DETAILS- EXTERIOR STOREFRONT AND
<br /> HC. Handicap NI. Nickel S.E.D. See Electrical Drawings V.B. Vapor Barrier
<br /> DIA. Diameter HBO. Hardboard S.G. Single Glazed VAR. Varnish 11. ANY ADDITIONS OR CHANGES TO WORK MUST BE AUTHORIZED IN WORK. NOTIFY THE ARCHITECT OF RECORD OF ANY SERVICES NECESSARY TO, CONSTRUCT THE OPENNINGS
<br /> DDiagonal N.R. Noise Reduction
<br /> DIM.im. Dimension HDW. Hardware S.H. Single Hung VNR. Veneer WRITING BY THE ARCHITECT OR ENGINEER OF RECORD. NO DISCREPANCIES. ENCLOSED RETAIL BUILDING INCLUDING ALL NOTED A9.3 ARCHITECTURAL DETAILS- ROOF
<br /> DISP. Disposal or Dispenser HTG. Heating p S.K.D. See Kitchen Drawings V.G. Vertical Grain
<br /> p p H.D. HeavyDuty S.L.D. See LandscapeDrawin s V.B. Vinyl Base ALTERATIONS WILL BE MADE ON THIS PROJECT EXCEPT UPON ASSOCIATED UTILITIES. THE GENERAL CONTRACTOR
<br /> D.L. Dead Load y o/ over g A9.4 ARCHITECTURAL DETAILS -AWNING AND METAL LATTICE
<br /> HPT. High Point O.C. On Center S.M. Sheet Metal V.F. Vinyl Fabric WRITTEN ORDER BY THE ARCHITECT OR ENGINEER OF RECORD. 4. EXTERIOR WALLS ARE DIMENSIONED TO THE EXTERIOR FACE OF SIP SHALL THOROUGHLY REVIEW THE PLANS AND y/��
<br /> Down
<br /> H.or H.W. Hot Water O.D. Outside Diameter S.M.D. See Mechanical Drawings VICP. Vitreous Clay Pipe A9.5 ARCHITECTURAL DETAILS- INTERIOR P R#2 01 .0 V.2020
<br /> D.P. Damp Proofing H.HT.or HGT. Height S.M.S. Sheet Metal Screw VICT. Vitreous ClayTile PANEL, CMU BLOCK, OR STRUCTURAL SHEATHING UNLESS NOTED SPECIFICATIONS HIMSELF AND WITH ALL TRADES
<br /> DR. Door or Drain g O.S.B. Oriented Strand Board 12. NO SUBSTITUTIONS OF ANY KIND FOR MATERIALS SPECIFIED ON OTHERWISE. A9.6 ARCHITECTURAL DETAILS-CEILING
<br /> DRY. Dryer H.C. Hollow Core OFF. Office S.P.D. See Plumbing Drawings W ACCEPT THE MATERIALS, SYSTEMS, DETAILS,AND
<br /> Ds. Downspout H.M. Hollow Metal OH. overhang S.S.D. See Structural Drawings W west,Watt or Width THESE CONSTRUCTION DOCUMENTS IS ALLOWED. NO ASSEMBLIES AS BEING CONSTRUCTIBLE AND CAN BE A9.7 DIGITAL MENU BOARD DETAILS
<br /> DW. Dishwasher H.RAIL Handrail OPNG. Opening S.S. sanitary Sewer or select structural W/ with "EQUIVALENT" SUBSTITUTIONS WILL BE MADE, UNLESS DUE TO 5. INTERIOR WALLS AND PARTITIONS ARE DIMENSIONED TO FINISHED
<br /> DWG(S) Drawing(s) H.V.A.C. Heating,Ventilation and Air Conditiong OPP. Opposite S.V. sheet Vinyl WARRANTED FOR A TIME PERIOD CONSISTENT WITH A9.8 DIGITAL MENU BOARD DETAILS
<br /> HB. Hosebib S.W. Southwest,Shear Wall,or Stem Wall W/o wit
<br /> DW R,D. Drawer OP. Opaque Opening hout THE LACK OF AVAILABILITY OF THE ORIGINAL MATERIAL SPECIFIED FACE UNLESS NOTED OTHERWISE. INDUSTRY STANDARDS UNLESS A SPECIFIC TIME tEF-1.1
<br /> HDR. Header SHR. Shower W.C. Water Closet or Wall Coverings EF-1.0 EQUIPMENT FLOOR PLAN
<br /> E HDWD. Hardwood OPH. Opposite sHT. sheet W.F. Wood Frame or Wide Flange AND APPROVED IN WRITING BY THE CONSTRUCTION PROJECT PERIOD IS NOTED HEREIN.
<br /> HOR. Horizontal ORN. Ornamental pp SHTNG. Sheathing REVISIONS W.P. Waterproof or Work Point MANAGER AND THE ARCHITECT OR ENGINEER OF RECORD 6. DOORS ARE LOCATED BY THEIR JAMB RELATIVE TO ADJACENT EQUIPMENT SCHEDULE X
<br /> E East OA. Overall SIM. similar W.P.M. Waterproof Membrane
<br /> E.B. Expansion Bolt O.H. Opposite Hand SK. Sink W.R. Water Resistant
<br /> WALLS AND PARTITIONS. DOOR OPENINGS ARE DIMENSIONED TO EF-2.0 FIXTURE FLOOR PLAN
<br /> I
<br /> E.C. Exposed Construction SKLT. Skylight W.S. Weather-stripping 13. WEATHER CONDITIONS: CONTRACTORS WILL PROTECT ALL PARTS THE STRIKE OR HINGE FACE OF THE DOOR FRAMES. ALL INTERIOR 2 EF-2.1 FIXTURE SCHEDULE
<br /> E.N. Exterior Insulation System I.C. In Contract g W.S.W. Wood Sash Window OF THEIR WORK FROM WEATHER DAMAGE DUE TO FROST, RAIN, DOORS AT 6" FROM PARTITION WALL UNLESS NOTED OTHERWISE. 1 PR#1 12.23.19
<br /> Y P SL. Sliding E.N. Edge Nail I.D. Inside Diameter W.W.M. Welded Wire Mesh STRUCTURAL D DRAWINGS N GS
<br /> 9 P. Pole SPECS. Specifications
<br /> E.W. Each Way IN.or Inch WASH. washer HEAT, ETC. AND WILL MAKE GOOD TO THE SATISFACTION OF THE2 PR#2 01.06.20
<br /> Y P.A. Public Address SPKR. Speaker
<br /> NCL. Incinerator P.C. Precast Concrete or Pipe Column SQ. square CONSTRUCTION PROJECT MANAGER AND GENERAL CONTRACTOR C. MISCELLANEOUS
<br /> EA. Each W D. Wood
<br /> ELEC. Electrical INCL. Include P.F.T. Pre-fabricated Truss SQ.FT.or S.F. Square Foot/Feet WDW. Window
<br /> INCAD. Incandescent ANY PORTION OF THE WORK WHICH MAY HAVE BECOME
<br /> ELEV. Elevation or Elevator P.H. Panel Hardware SQ.YD. Square Yard WT. Weight VICINITY MAP S1 FOUNDATION PLAN
<br /> EMER. Emergency NFO. Information WSCT. wainscot DAMAGED. 1. SEAL EXTERIOR JOINTS AROUND DOORS, WINDOWS AND LOUVER
<br /> NSUL. Insulation P.L. Property Line SST. Stainless Steel
<br /> EQ Enclosure W.H. Wall Hung FRAMES AND AT PENETRATIONS OF MECHANICAL, ELECTRICAL AND S2 ROOF FRAMING PLAN
<br /> INSC. Insulated Concrete P.LAM. Plastic Laminate ST. Street or Stone NO SCALE
<br /> EQ. Equal P.T. Pressure Treated STA. Stationary or Station W HTR. Water Heater
<br /> EQUIP. Equipment IGT. Insulating Glass y
<br /> TC. Etcetera W.S.Wweather stop 14. RESPONSIBILITY OF CONTRACTORS: EACH SUBCONTRACTOR AND PLUMBING ELEMENTS TO PREVENT AIR AND WATER LEAKAGE.
<br /> INT. Interior P.T.D.F. Pressure Treated Douglas Fir STL. Steel SD1 STRUCTURAL DETAILS
<br /> WHS. Wheel Stop
<br /> NV. Intermediate PERF. Perforated sTOR. storage THE GENERAL CONTRACTOR ARE RESPONSIBLE FOR SD2 STRUCTURAL DETAILS
<br /> EWC. Electrical Water Cooler WHA. Water Hammer Arrestor
<br /> NV. Invert PERP. Perpendicular SUSP. suspended WORKMANSHIP AND MATERIALS. EACH SUBCONTRACTOR AND THE 2. ISOLATE DISSIMILAR METALS EFFECTIVELY FROM EACH OTHER TO PROJECT SITE
<br /> EXH. Exhaust W G. Wired Glass
<br /> . Wire Mesh SNI STRUCTURAL NOTES
<br /> EXIST or(E) Existing PL.or P. Plate SYM. Symmetrical WM
<br /> PLYWD. Plywood SFGL. Safety Glass GENERAL CONTRACTOR ARE RESPONSIBLE FOR THE CARE AND PREVENT ELECTROLY ACTION.
<br /> EXP.JT.or E.J. Expansion Joint � � WI. Wrought Iron
<br /> EXT. Exterior J.B. Junction Box PNL. Panel SCH. Schedule PROTECTION OF HIS OWN WORK AND MATERIALS. F&E DRAWINGS
<br /> JAN. Janitor PNT. Paint SCN. Screen XYZ 3. PROVIDE ACCESS PANELS AS REQUIRED FOR MECHANICAL AND
<br /> F JT.or J Joint POL. Polished SCUP. Scupper YD. Yard
<br /> JST.or Joist PR. Pair SLNT. Sealant 15. SITE SAFETY: EACH CONTRACTOR WILL ABIDE BY LOCAL AREA PLUMBING VALVES.
<br /> JF. Joint Filler PREFAB. Prefabricated SEC. section STANDARDS AND RELATED OSHA STANDARDS FOR THE
<br /> F.A. Fire Alarm PT. Point SEI. 7-Eleven Inc. 2 EF-1.0 EQUIPMENT FLOOR PLAN
<br /> F.A.S. Fasten,Fastener SVYD. Service Yard PROTECTION AND SAFETY FOR THEIR EMPLOYEES ON SITE. THISACCESSIBILITY NOTES EF-1.1 EQUIPMENT SCHEDULE
<br /> F.A.U. Forced Air Unit SSK. service sink ARCHITECT AND HIS PROFESSIONAL CONSULTANTS WILL BE HELD
<br /> HARMLESS BY THE OWNER, GENERAL CONTRACTOR AND RELATED EF-2.0 FIXTURE FLOOR PLAN
<br /> AWARDED TRADES ON THIS PROJECT FOR ACCIDENTS OR INJURIES ALL CODE SECTIONS AND FIGURES ARE BASED ON THE r 1 A�EF-2.1 FIXTURE SCHEDULE
<br /> CAUSED OR ACCRUED ON THIS PROPERTY DURING THE 2016 CALIFORNIA BUILDING CODE (T-24) U.O.N. MECHANICAL DRAWINGS
<br /> PRE/ACTUAL/POST CONSTRUCTION PHASES OF THIS PROJECT. �E„
<br /> • THE DETAILS AND DIAGRAMS ILLUSTRATE THESPECIFIC
<br /> GRAPHIC SYMBOL LEGEND GENERAL DRAWING NOTES ACCESSIBIEQUIRE ENTS REGULATIONS
<br /> SADELIRES OFONL T
<br /> ACCESSIBILITY REGULATIONS AND ARE ONLY TO BE HE
<br /> M1.0 MECHANICAL PLAN
<br /> ROOM OCCUPANCY/ USED AS AN AID FOR BUILDING, DESIGN AND M1.1 MECHANICAL ROOF PLAN
<br /> A PARTIAL BUILDING SECTION #7 EGRESS LOADS FOR APPLICABLE CODE DATA AND PROJECT DATA CONSTRUCTION. THEY DO NOT REFLECT THE ACTUAL M1.2 REFRIGERATION PIPING RISER DETAILS
<br /> SEE G0.1 INFORMATION SEE SHEET A1.5 CONDITIONS. REFER TO THE CIVIL AND LANDSCAPE M2.0 MECHANICAL SPECIFICATIONS
<br /> 1 A9 1 DRAWINGS FOR FURTHER INFORMATION REGARDING M2.1 REFRIGERATION SPECIFICATIONS
<br /> 0FE OR FE BY REVIEW OF THESE PLANS, THE GOVERNING AGENCIES SITE. REFER TO THE MECHANICAL, PLUMBING,
<br /> FIRE EXTINGUISHER CASp REVIEWER HAS DONE A THOROUGH REVIEW AND ELECTRICAL, AND ARCHITECTURAL DRAWINGS FOR M3.0 TITLE 24 ENERGY COMPLIANCE FORMS
<br /> TYPICAL COLUMN LINE INDICATIONS WALL SECTION NUMBER ANALYSIS AND APPROVAL INDICATES COMPLIANCE UNDER GENERAL BUILDING DESIGN REQUIREMENTS.
<br /> SB1608. PROJECT ADDRESS PLUMBING DRAWINGS
<br /> • FOR INFORMATION NOT PROVIDED IN DIAGRAMS SEE
<br /> 1 WALL SECTION CUT INDICATOR DEFERRED SUBMITTALS NOTES ON CS-1 &CS-2.
<br /> A9.1 SHEET LOCATION N WILSON WAY& E MAIN STREET, P1.0 DRAIN PIPING RISER AND SCHEDULES
<br /> TRUE NORTH STOCKTON, CA 95205 P1.1 WATER PIPING PLAN AND RISER
<br /> THE FOLLOWING ARE DESIGN-BUILD ITEMS TO BE PROVIDEDAPN#: 153-040-260-000: 10 N WILSON WAY
<br /> CONTRACTOR NOTES TRUE 153-040-170-000: 26 N WILSON WAY P1.2 PLUMBING SLAB PENETRATION PLAN
<br /> --- PROJECT NORTH BY THE CONTRACTOR, AND REQUIRE OUTSIDE ENGINEERING NORTH P2.0 PLUMBING DETAILS AND SPECIFICATIONS
<br /> PROJECT AND SEPARATE SUBMITTALS TO THE BUILDING DEPARTMENT
<br /> xx WALL TAG - SEE SHEET A7.2 NORTH FOR REVIEW AND PERMITTING. SUBMIT ITEMS TO THE CM GENERAL CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS
<br /> WORK POINT, CONTROL POINT FOR REVIEW AND APPROVAL PRIOR TO CITY REVIEW. OF AUTHORITIES HAVING JURISDICTION RELATED TO THE ELECTRICAL DRAWINGS
<br /> OR DATUM POINT INDICATION --------- PROJECTAND INSTALLATION AND ASSOCIATED REQUIRED TESTS AND CODE REFERENCES
<br /> 101 ROOM NUMBER TRUE NORTH - ROOF TRUSSES INSPECTIONS PRIOR TO COVERING OR CONCEALING THESE E0.1 ELECTRICAL NOTES, SYMBOLS &ABBREVIATIONS
<br /> -GAS STATION & GAS CANOPY MATERIALS.
<br /> MATCH-LINE INDICATION WINDOW AND 2016 CALIFORNIA BUILDING CODE (CBC) E1.0 ELECTRICAL POWER PLAN SEAL/SIGNATURE
<br /> STOREFRONT TAG - [2015 INTERNATIONAL BUILDING CODE (IBC)]
<br /> xx E1.1 ELECTRICAL RISER DIAGRAM &SCHEDULES
<br /> SEE SCHEDULE ON
<br /> -------- DETAIL NUMBER
<br /> SHEET A7.1 2016 CALIFORNIA ELECTRICAL CODE (CEC) E1.2 ELECTRICAL SLAB PENETRATION PLAN JOB NO. 1497.009
<br /> - DETAIL CUT INDICATOR TRUE [2014 NATIONAL ELECTRICAL CODE (NEC)] E1.3 ELECTRICAL ROOF PLAN
<br /> E1.4 ELECTRICAL LOW-VOLTAGE PLAN DRAWN KP
<br /> OOOA DOOR TAG - SEE A6.0 NORTH 2016 CALIFORNIA MECHANICAL CODE (CMC) E1.5 LOW VOLTAGE DETAILS
<br /> 1 PROJ ECT PROTOTYPE. 10-23-2019 (2019-02 [2015 UNIFORM MECHANICAL CODE (UMC)] E1.6 ELECTRICAL DETAILS CHECK GM
<br /> A9.1 SHEET LOCATION REVIS N NUMBER E2.0 ELECTRICAL LIGHTING PLAN
<br /> xx KEYNOTE INDICATION 1
<br /> 2016 CALIFORNIA PLUMBING CODE (CPC) E3.0 ELECTRICAL SPECIFICATIONS
<br /> ARE F REVISION [2015 UNIFORM PLUMBING CODE (UPC)] TITLE SHEET
<br /> BID NOTESEM51.0 ENERGY MANAGEMENT SYSTEM
<br /> 2016 CALIFORNIA ENERGY CODE
<br /> A
<br /> INTERIOR ELEVATION VIEW 1 BUILDING CODE AND [2016 BUILDING ENERGY EFFICIENCY STANDARDS]ACCESSIBILITY KEYNOTE LANDSCAPE DRAWINGS
<br /> a ^ x.x.x. _ HEIGHT 1. PROVIDE SEPARATE ITEMIZED LIST FOR ALL WORK (LABOR & MATERIALS & OVERHEAD)ASSOCIATED WITH THE FOLLOWING ITEMS: 2016 CALIFORNIA FIRE CODE CFC
<br /> INTERIOR ELEVATION NUMBER (CFC)
<br /> c X-� ELEVATION x - REVISION DELTA A. FLOOR FINISHES [2015 INTERNATIONAL FIRE CODE (IFC)] L-001 COVER SHEET
<br /> A9.1 MATERIAL INDICATION
<br /> 0 SHEET LOCATION MATL (SEE FINISH SCHEDULE) INDICATOR L-002 IRRIGATION SPECIFICATIONS SHEET
<br /> N
<br /> ,,It
<br /> STOCKTON CA MAO
<br /> B. CONIC SLAB CUTTING & PATCHING 2016 CALIFORNIA GREEN BUILDING STANDARDS CODE L-003 PLANTING SPECIFICATIONS
<br /> (CALGreen Code) L-101 LAYOUT PLAN
<br /> EXTERIOR ELEVATION NUMBER x.x.x. _ SPOT ELEVATION C. CEILINGS
<br /> p 1 xxx - ENLARGED X'_XX CITY OF STOCKTON, CALIFORNIA MUNICIPAL CODE L-102 IRRIGATION PLAN
<br /> N SHEET LOCATION O EQUIPMENT INDICATION X-XXX DETAIL INDICATOR D. LIGHTING L-103 PLANTING PLAN
<br /> A9.1 INDICATOR FOR BUILDING CODE ANALYSIS/CODE OCCUPANCY AND L-501 IRRIGATION DETAILS G000
<br /> L J E. HVAC EXISTING, SEE SHEET A1.5 L-502 PLANTING DETAILS