<br /> AdvanTex Treatment System
<br /> CS
<br /> Cost Estimating Worksheet crtt,rosta
<br /> ��CPrpar9tcd
<br /> 1.800-348-9843
<br /> Application Sy tew Data .
<br /> This cost.estimating worksheet Should be used for System Design Flows(gpd) .1,875
<br /> preliminary cost estimating only. Due to variances in Loading Rate(gal/sq.&/day) 47
<br /> products specified,recirculation tank costs,as well as labor Number of AdvanTi ex 20 Pods 2
<br /> and,engineering costs,a low and high range estim&te is Recirculating Tank Capacity(gallons) 3,000
<br /> rovided,.
<br /> P - _ Number of Pumping Packages 1 -
<br /> Number ofAutomatie Distributing Valves 0
<br /> Ntunber.of Recirculating splitter valves 1
<br /> Number of Ventilation Fan Assemblies 0
<br /> Project:
<br /> U. it'Eost 4tau a T6'ta1 COARau e.
<br /> Low High .Low Hi h.
<br /> Materials
<br /> Red—r6n atlon Tank ., `
<br /> Delivered to site d� {of 'P fi $0-90 $1.20 $2,700• $3,600
<br /> Tank Access Equipment
<br /> Risers,lids,adapters,grommets,epoxy $225: $300 $450 $600
<br /> - :Purxiptng Equiipment ... .
<br /> Pump vault,pumps,Uv,splice box,float assembly $1.500 51,800 $1,540. 51,804
<br /> Control'Fimel
<br /> Control panel(with Telemetry) $1,400 51,600 $1,400 $1,640
<br /> i Automatae Distributing Vslve
<br /> Distributing valve,enclosure,fid $325 $400 : $0 $o
<br /> Imacellaneouc Equipment
<br /> f Piping,fittings,glue $50 $75 $100 $154
<br /> 1 Aacircidating SpIIttcr Vglve.
<br /> MV,mounting bracket- $340 $400. $344 $400
<br /> Vekdlntlon Fsn Assembly
<br /> Ventilation fan„enclosure,air vent $1,145 $1;325 E4 54
<br /> Advgx Tix Equipment'
<br /> AdvanTex Filter $2,138 $2,350 $4,27b $4,700 `
<br /> MaterialsSubtotal $10,766 SI2,830
<br /> Labor and En ineerin
<br /> •Labor and Misc.l+qulpmen't
<br /> r Percent of Materials 40% 100% $41-306
<br /> $12,850 ,
<br /> Engidieexang,Permits,Inspection
<br /> Percent of Materials 20% 25% $2,153 $3,213
<br /> 'Operation and Maintenance Manual
<br /> Two copies of project-specific O&M Manual $300 $300 5340 5300
<br /> Labor and Engineering Subtotal s6,7�o Sh6,369
<br /> `Total Installed Costs of Complete System s17,s2� Ss9..I3-.
<br /> Cost per Treated Gallon 59 35 $as-ss
<br /> Cost estimate does not inOude Materials and labor costs joy collecti'en,prerrneatment,or disperser(.