My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
434
>
2900 - Site Mitigation Program
>
PR0544019
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2021 9:57:46 AM
Creation date
2/18/2021 9:55:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544019
PE
2960
FACILITY_ID
FA0025031
FACILITY_NAME
FORMER SHELL SERVICE STATION
STREET_NUMBER
434
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
167-150-310
CURRENT_STATUS
01
SITE_LOCATION
434 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> BORING/WELL CONSTRUCTION DETAILS <br /> Former Shell Service Station <br /> 434 Dr.Martin Luther King Jr. Blvd.,Stockton,CA <br /> Name Type Date Surface Total First Groundwater Casing Screen Depth <br /> Installed Elevation Depth feet Diameter feet <br /> feet feet Depth Elevation inches Top Bottom <br /> MW-1 Monitoring well 5/7/2018 16.61 35 25 -- 2 20 35 <br /> MW-2 Monitoring well 5/7/2018 16.02 35 25 -- 2 20 35 <br /> MW-3 Monitoring well 5/8/2018 16.29 35 25 -- 2 20 35 <br /> 131 Soil Boring 9/7/2017 -- 28 23 -- -- -- -- <br /> 132 Soil Boring 9/7/2017 -- 28 26 -- -- -- -- <br /> 133 Soil Boring 9/7/2017 -- 28 25.5 -- -- -- -- <br /> 134 Soil Boring 9/7/2017 -- 28 23.5 -- -- -- -- <br /> B5 Soil Boring 9/7/2017 -- 28 24.5 -- -- -- -- <br /> 136 Soil Boring 10/11/2017 -- 30 25.5 -- -- -- -- <br /> 137 Soil Boring 10/11/2017 -- 28 26.3 -- -- -- -- <br /> B8 Soil Boring 10/11/2017 -- 28 24.8 -- -- -- -- <br /> 139 Soil Boring 10/11/2017 -- 30 26 -- -- -- -- <br /> B10 Soil Boring 10/11/2017 -- 28 26.5 -- -- -- -- <br /> 1311 Soil Boring 10/11/2017 -- 28 25.5 -- -- -- -- <br /> B-12 Soil Boring 5/8/2018 -- 15 -- -- -- -- -- <br /> B-13 Soil Boring 5/8/2018 -- 15 -- -- -- -- -- <br /> B-14 Soil Boring 5/8/2018 -- 15 -- -- -- -- -- <br /> B-15 Soil Boring 5/8/2018 -- 15 -- -- -- -- -- <br /> SS-1 Sub-slab vapor 10/11/2017 -- * -- -- -- -- -- <br /> robe <br /> SS-2 Sub-slab vapor 10/11/2017 -- * -- -- -- -- -- <br /> robe <br /> *W-4 Monitoring well 2/25/2019 -- 30 21 -- 2 15 30 <br /> MW-5 Monitoring well 2/25/2019 -- 30 21 -- 2 15 30 <br /> Notes: <br /> Elevations are relative to mean sea level. <br /> *Total depth:4"to 6"below bottom of foundation concrete slab <br />
The URL can be used to link to this page
Your browser does not support the video tag.