Laserfiche WebLink
River Islands Development at Lathrop November 2020 <br /> Final Phase 2 Sewer Technical Report Rev 1 #6520 <br /> 6.5 Sewer Collection Area B2— Preliminary Steady State Results ..................................................24 <br /> 6.5.1 Sewer Collection Area B2 — Land Uses, Average Dry Weather Flows, and Peak Wet Weather <br /> Flows 24 <br /> 6.5.2 Sewer Lift Station B2 LS-132— Preliminary Firm Pumping Capacity.......................................25 <br /> 7. River Islands Sewer Collection System Model — Phase I Results................................................26 <br /> 7.1 Sewer Collection Area Al ...........................................................................................................26 <br /> 7.1.1 Sewer Collection Area Al — Land Uses, Average Dry Weather Flows, and Peak Wet Weather <br /> Flows 26 <br /> 7.1.2 Sewer Collection Area Al — Pipe Capacity Under PWWF .....................................................26 <br /> 7.1.3 Sewer Collection Area Al — Pipe Velocities Under PWWF....................................................26 <br /> 7.1.4 Sewer Lift Station Al (LS-A1).................................................................................................30 <br /> 7.1.4.1 Sewer Lift Station LS-A1 Preliminary Capacity Analysis ................................................31 <br /> 7.2 Sewer Collection Area A2...........................................................................................................32 <br /> 7.2.1 Sewer Collection Area Al — Land Uses, Average Dry Weather Flows, and Peak Wet Weather <br /> Flows 32 <br /> 7.2.2 Sewer Collection Area A2 — Pipe Capacity Under PWWF .....................................................32 <br /> 7.2.3 Sewer Collection Area A2 — Pipe Velocities Under PWWF....................................................32 <br /> 7.2.4 Sewer Pump Station A2 (PS-A2)............................................................................................35 <br /> 7.2.4.1 Sewer Lift Station PS-A2 Preliminary Capacity Analysis................................................36 <br /> 3 <br />