Laserfiche WebLink
River Islands Development at Lathrop November 2020 <br /> Final Phase 2 Sewer Technical Report Rev 1 #6520 <br /> 1. Introduction <br /> 1.1 Background <br /> River Islands, located in the Stewart Tract within the City of Lathrop, is a 4,905-acre, master planned <br /> community being constructed southwest of the San Joaquin River. The River Islands development will <br /> consist of low, medium,and high density residential,school (institutional), parks, and commercial land uses. <br /> River Islands will be constructed in two separate phases known as Phase I and Phase II. Phase I is <br /> currently being constructed over 4 separate stages and Phase II is entering the master planning stages. <br /> Currently, the generated sewage from the constructed portions of River Islands is conveyed to an interim <br /> sewer pump station (PS) located between Lakes 1 and 2. The interim sewer PS initially pumped the <br /> development's sewage to the Mossadale collection area located just west of Interstate-5 (1-5). From here <br /> it flowed to the City of Lathrop's Consolidated Treatment Facility(CTF) for treatment. The PS force mains <br /> have now been extended to connect directly to the CTF, without flowing through the Mossdale collection <br /> system. <br /> At full buildout, the River Islands sewer collection system will consist of six separate sewer collection areas <br /> based on the service area of the six sewer lift/pump stations. The distinction between lift and pump stations <br /> are that lift stations raise the hydraulic grade line (HGL)of the sewage, allowing it to flow by gravity into an <br /> adjacent collection area, while pump stations transmit the sewage under pressure. The collection areas <br /> will be designed to convey the generated sewage from each service point of connection (POC) to the <br /> corresponding sewer lift/pump station by gravity. All of the generated sewage from River Islands will <br /> eventually be conveyed to sewer pump station A2 (also known as Site C) located in the southeast of the <br /> development. The A2 pump station will pump raw sewage directly to the Lathrop CTF through the existing <br /> 12 and 18-inch force mains. <br /> River Islands sewer collection system will be required to be planned, designed, and constructed per the <br /> City of Lathrop's 2019 Design and Construction Standards (City Standards). The City Standards were <br /> created to provide the minimum requirements for all facilities and appurtenances to be turned over to the <br /> City for operation and maintenance. <br /> 1.2 Report Objectives <br /> The objectives of the River Islands Phase 2 Sewer Technical Report are as follows: <br /> • Provide updates to the previous Phase I Sewer Master Plan prepared by PACE in 2017. <br /> • Analyze and model the average dry weather sewer flows (ADWF)for Phase I and II in accordance <br /> with the City Standards under Steady State Conditions. <br /> • Analyze and model the peak wet weather sewer flows (PWWF) for Phase I and 11 in accordance <br /> with the City Standards, under Steady State Conditions. <br /> • Analyze and model the pipe velocities under PWWFs for Phase I in accordance with the City <br /> Standards, under Steady State Conditions. <br /> • Describe the River Islands sewer collection system including the conveyance networks, locations <br /> of proposed sewage lift or pump stations, and pumping between collection areas during <br /> emergency, interim, and low-flow conditions. <br /> • Provide a preliminary firm pump capacity requirement for the proposed Phase II sewer lift stations. <br /> • Present the potential impact Phase II sewer flows will have on Phase I. <br /> 6 <br />