River Islands Development at Lathrop November 2020 <br /> Final Phase 2 Sewer Technical Report Rev 1 #6520 <br /> 2.2.2 Phase II Recycled Water Flushing System <br /> The construction and occupancy of River Islands is expected to be completed in separate stages lasting <br /> until final buildout in 2040. The primary conveyance sewer mains (also known as trunk lines), will be <br /> required to be designed for full buildout conditions and any tributary collection areas. As a result, these <br /> trunk lines will initially be subject to low flows which can lead to sediment/debris buildup, and potentially <br /> increase corrosion and odor issues through the formation of anaerobic conditions. It is recommended that <br /> an additional two recycled water flushing stations be included in the design Phase II's sewer infrastructure <br /> to address interim low flow conditions. . The stations are recommended to provide sufficient recycled water <br /> to scour and flush out the accumulated sediments/debris (5-6 feet per second) and to decrease the <br /> occurrence of continued low flow conditions. The sizing of flow control valves will need to consider limiting <br /> flushing flows to prevent overwhelming/surcharging the downstream collection system. Similar to the <br /> existing flushing stations, the proposed recycled water flushing stations should be designed with a remote <br /> control panel allowing operators to control flushing events at set time intervals. This situation will also <br /> require increased monitoring of sediment and odor by City staff to ensure the flushing program is adequate. <br /> 2.2.3 Interim and Emergency Bypass System — Phase II <br /> At full buildout and under normal operating conditions (see Section 6), the River Islands sewer collection <br /> system will have a northern and southern trunk lines designed to be the primary means of conveying the <br /> generated sewage offsite. As shown in Figure 2-1, northern trunk line will be responsible for conveying <br /> sewage from Collection Areas C1, C2,Al and portions of A2 and the southern trunk line will be responsible <br /> for conveying sewage from Areas B1, B2 and the southern portion of Area A2, primarily consisting of the <br /> employment centers. <br /> The remaining portions of the development will continue to be constructed in a series of separate stages, <br /> with the portions of collections areas C2, B1 and eventually C1 proposed to be constructed first. To prevent <br /> having to oversize or design the sewer lift stations to accommodate the interim conditions, bypass force <br /> mains as shown in Figure 2-1, will be constructed allowing for LS-C2 to pump to Area's B1 collection <br /> system and LS-B1 to pump into Area's Al collection system. These interim force mains should be designed <br /> as a permanent system allowing for the City's operations staff to use them as emergency bypass force <br /> mains should the need arise in the future. <br /> During the design phases of the Phase II collection system, it is recommended that the River Islands sewer <br /> collection model be re-run for future interim and emergency conditions to determine the capacity limitations <br /> for each scenario. To be discussed further in Section 7, collection area's Al and A2 sewer infrastructure <br /> was designed with additional capacity to accommodate potential tributary flows. Re-running the model for <br /> interim conditions will allow for capacity verification of the existing Al and A2 infrastructure. <br /> 11 <br />