Laserfiche WebLink
CaIEEMod Version: CalEEMod.2016.3.2 Page 13 of 80 Date: 7/28/2020 11:25 AM <br /> River Islands Phase 2 Construction Emissions- San Joaquin County, Annual <br /> Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor <br /> Architectural Coating 'Air Compressors ; 1; 6.001 78• 0.48 <br /> -------------------------- �- - - - - ------------ ------------- ----------- <br /> Demolition +Excavators ; 31 8.001 158• 0.38 <br /> --------------------------- ------------------------ ------------------------------- ------------ ------------- ----------- <br /> i <br /> Demolition 'Concrete/Industrial Saws ; 11 8.001 81, 0.73 <br /> --------------------------- ------------------------- ------------------------------- ------------ -------------- ----------- <br /> _ i <br /> Grading +Excavators ; 21 8.001 158• 0.38 <br /> --------------------------- �- - - - - ------------ ------------- ----------- <br /> Building Construction 'Cranes ; 11 7.001 231, 0.29 <br /> ---------------------------- ------------------------- ------------------------------- ------------ -------------- ----------- <br /> _ i <br /> Building Construction 'Forklifts ; 31 8.001 89• 0.20 <br /> �- - - - - ------------ ------------- ----------- <br /> i <br /> Building Construction 'Generator Sets ; 11 8.001 84• 0.74 <br /> --------------------------- �- - - - - ------------ ------------- ----------- <br /> Paving +Pavers ; 21 8.001 130• 0.42 <br /> - - - ------------ -------------- -----------L <br /> �_ <br /> Paving 'Rollers ; 21 8.001 80• 0.38 <br /> --------------------------- �- - - - - ------------ ------------- ----------- <br /> Demolition 'Rubber Tired Dozers ; 21 8.001 247• 0.40 <br /> �- - - - - ------------ ------------- ----------- <br /> i <br /> Grading 'Rubber Tired Dozers ; 11 8.001 247• 0.40 <br /> ---------------------------- ------------------------ -------------------------------i------------ ------------- ----------- <br /> Building Construction +Tractors/Loaders/Backhoes ; 31 7.001 97• 0.37 <br /> �-------------------------- ------- _----- ------------- ----------- <br /> • <br /> i <br /> Grading 'Graders ; 11 8.001 187• 0.41 <br /> ---------------------------- ------------------------- ------------------------------- ------------ ------------- ----------- <br /> _ i <br /> Grading +Tractors/Loaders/Backhoes ; 21 8.001 97• 0.37 <br /> a <br /> �- - - - - ------------ -------------------- <br /> i <br /> Paving 'Paving Equipment ; 21 8.001 132• 0.36 <br /> --------------------------- �- - - - - ------------ ------------- ----------- <br /> Site Preparation +Tractors/Loaders/Backhoes ; 41 8.001 97• 0.37 <br /> �- - - - - ------------ ------------- ----------- <br /> i <br /> Site Preparation 'Rubber Tired Dozers ; 31 8.001 247• 0.40 <br /> ---------------------------- ------------------------- ------------------------------- ------------ -------------- ----------- <br /> _ i <br /> Grading 'Scrapers ; 21 8.001 367• 0.48 <br /> ---------------------------- --------------------------*-----------------F------------r------------- ----------- <br /> Building Construction •Welders 1• 8.00• 46• 0.45 <br /> Trips and VMT <br />