My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
River Islands Development at Lathrop November 2020 <br /> Final Phase 2 Sewer Technical Report Rev 1 #6520 <br /> 6. River Islands Sewer Collection System Model — Preliminary Phase <br /> 2 Results <br /> 6.1 Overview <br /> The Phase II sewer collection system is proposed to be subdivided into 4 separate collections areas <br /> designated areas C1, C2, B1, and B2. Each collection area will be equipped with sewer laterals designed <br /> to convey sewage from each point of connection to the larger trunk lines located in the major streets. The <br /> function of the larger trunk lines will be to convey the collected sewage to each area's lift station, located at <br /> the lowest (end)of the collection system. As shown in Appendix B, the preliminary alignment of the main <br /> trunk lines still has sufficient cover to allow for slopes greater than the City's minimum requirements should <br /> future modeling scenarios determine low sewer velocities should occur. It is recommended that the sewer <br /> model be updated as sewer improvement plans are developed to verify the future sewer infrastructure will <br /> meet the City's requirements. <br /> 6.2 Sewer Collection Area C1 <br /> 6.2.1 Sewer Collection Area C1 —Land Uses,Average Dry Weather Flows,and Peak Wet Weather Flows <br /> Sewer Collection Area C1 is proposed to be located in the western portion of Phase II and will be bounded <br /> by Paradise Cut levee in the south, the Old River distributary in the west and collection areas C2 and B1 in <br /> the north and east. Area C1 will encompass approximately 283 acres of low and medium density residential <br /> units as well as parks and school land uses. Table 6-1 lists the proposed number of dwelling units or <br /> acreage of each land use in collection area C1, the corresponding land use sewer flow factor, and the <br /> ADWF in gallons per day. <br /> The total PWWF generated from sewer collection area C1 and conveyed to the proposed sewer lift station <br /> C1 (LS-C1) is approximately 593,236 GPD with a peaking factor of 2.85 as shown in Table 6-1. As <br /> discussed in Section 5.2, only the location of the main trunk lines was provided by Odell Engineering. The <br /> location of the all the Phase II lateral lines conveying flows from each parcel to the main trunk lines was <br /> assumed in order to reasonably provide service to each applicable parcel. Figure 6-1 shows the PWWFs <br /> of each pipe if the sewer lines were designed as shown. <br /> Figure 6-1 also shows the minimum pipe sizes required by the City Standards to convey that segments <br /> PWWF. Please note that smaller pipe sizes may be used if the slope is increased. Upon completion of the <br /> Phase II improvement plans, the sewer model will be updated accordingly and also run for pipe velocities. <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.