My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
River Islands Development at Lathrop November 2020 <br /> Final Phase 2 Sewer Technical Report Rev 1 #6520 <br /> 7.1.4 Sewer Lift Station Al (LS-A1) <br /> Sewer lift station Al (previously referred to as the Stage 2A lift station) was designed by PACE and is <br /> currently in operation. The lift station is located in development stage 2A at the intersection of S2 Street <br /> and River Islands Parkway. Flow from Collection Area Al is conveyed along River Islands Parkway into <br /> the lift station's 8-foot wide by 18-foot long by 31-foot tall precast concrete wet well. At full buildout, the lift <br /> station will be installed with 3 duty+ 1 standby 15 horsepower(hp)submersible pumps each rated at 1,100 <br /> GPM at 28 feet TDH. The 3 duty pumps will provide a firm pumping capacity of 3,300 GPM. The station <br /> is equipped with a standby generator, and an above ground electrical and chemical building as shown in <br /> Figure 7-3 below. <br /> Sts€hkf — — — - — — <br /> FROM 29 RMO TOWER <br /> i <br /> A-9 �ja <br /> r i - <br /> Wool i <br /> ! — VALVE <br /> iRAI , <br /> REC1'(LfU <br /> kJER I <br /> s A FLEC ICALQEMKA SES GBMTOR _._._._._._._._, <br /> RO011! ROOAI <br /> l �+ <br /> � F SEREEJ <br /> TO 1 R MAIN FROM 2A <br /> SEWER TRUNK <br /> Figure 7-3: Collection Area Sewer Lift Station Al Site Plan View <br /> Table 7-2: Sewer Lift Station Al — Firm Pump Capacity at Full Buildout <br /> Pumping <br /> Capacity (GPM) Motor Rated <br /> Pump Number @ 28' TDH Horsepower Motor Drive Status <br /> Sewage Pump#1 1,100 15 Variable Duty <br /> Frequency Drive <br /> Sewage Pump#2 1,100 15 Variable Duty <br /> Frequency Drive <br /> Sewage Pump#3 1,100 15 Variable Duty <br /> Frequency Drive <br /> Sewage Pump#4 1,100 15 Variable Standby <br /> Frequency Drive <br /> Total Firm Pumping Capacity 3,300 <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.