Laserfiche WebLink
River Islands Development at Lathrop November 2020 <br /> Final Phase 2 Sewer Technical Report Rev 1 #6520 <br /> 7.2 Sewer Collection Area A2 <br /> 7.2.1 Sewer Collection Area Al —Land Uses,Average Dry Weather Flows, and Peak Wet Weather Flows <br /> Sewer Collection Area A2 is located in the southeast of the River Islands development and is the last <br /> collection area before sewage leaves the site. Area A2 will ultimately receive all 6 collection areas sewage <br /> and will pump the sewage directly to the Lathrop CTF through the installation of a 12 and 18-inch force <br /> mains. Collection Area A2 is comprised of development stages 1 B and 1A of Phase I, and encompasses <br /> approximately 975 acres composed of all land uses. Table 7-4 lists the ADWF that enter or are generated <br /> from area A2, and the corresponding PWWF entering PS-A2. <br /> Table 7-4: Sewer Collection Area A2 — Land Uses, ADWF, and PWWF <br /> Land Use <br /> Area A4 Sewer Flow Average Dry <br /> Total No of DU Factor Weather Flow <br /> Land Use or Acres GPD/du or ac) GPD) <br /> Low Density Residential (per DU) 1,512 200 302,400 <br /> Medium Density Residential (per DU) 114 180 20,520 <br /> High Density Residential (per DU) 668 170 113,560 <br /> Commercial (per acre) 202 590 119,422 <br /> Industrial (per acre) 0 355 0 <br /> Parks (per acre) 72 55 3,952 <br /> Schools/ Institutional (per acre) 1 34 1 245 8,355 <br /> Total Area A2 Average Dry Weather Flow 568,208 <br /> From Collection Area Al Average Dry Weather Flow 1,112,710 <br /> From Collection Areas 131+1132 Average Dry Weather Flow 1,333,801 <br /> Total Average Dry Weather Flow 3,014,719 <br /> Peaking Factor 2.05 <br /> Peak Wet Weather Flow' 6,180,211 <br /> Notes: <br /> 1. PWWF shown is based on the ADWF from areas C1+C2, 131+B2, Al and A2 conveyed to the PS-A2. <br /> 7.2.2 Sewer Collection Area A2— Pipe Capacity Under PWWF <br /> Figure 7-4 shows the PWWFs of all the pipes within Area A2. The PWWF for all of River Islands entering <br /> sewer lift station A2 is 6,180,211 GPD or 4,292 GPM. None of the pipes exceeded the maximum capacity <br /> (Depth/diameter ratio) requirement described in Section 4.1.1. <br /> 7.2.3 Sewer Collection Area A2 — Pipe Velocities Under PWWF <br /> Figure 7-5 shows the velocity of each pipe within Area Al under PWWFs. As discussed in Section 7.1.3, <br /> the northern trunk line along River Islands Parkway and Somerton Parkway can be expected to operate <br /> under low velocity conditions regularly. However, except for 1 pipe segment, none of the other sewer lines <br /> did not satisfy the City's minimum or maximum pipe velocities requirements. <br /> 32 <br />