My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br /> 1 Introduction ..............................................................................................................................................3 <br /> 1.1 A Note on Nomenclature of River Islands' Areas..............................................................................3 <br /> 1.2 Stormwater evacuation path .............................................................................................................6 <br /> 2 Modelling Software and Base Data........................................................................................................7 <br /> 2.1 Basic XPSWMM Configuration .........................................................................................................7 <br /> 2.2 Lake Storage Capacity......................................................................................................................9 <br /> 2.3 Lake Interconnection pipe lengths ..................................................................................................12 <br /> 2.4 Hydrographs and Rainfall Data.......................................................................................................14 <br /> 2.4.1 Scaling based on approximated drawn contributory area .................................................14 <br /> 2.4.2 Scaling based of contributory area relative to lake size ....................................................16 <br /> 3 Model Configurations............................................................................................................................17 <br /> 3.1 Phase 1 nomenclature summary....................................................................................................17 <br /> 3.1.1 Model D..............................................................................................................................17 <br /> 3.1.2 48.......................................................................................................................................17 <br /> 3.1.3 Dynamic (d) and Static (s) .................................................................................................17 <br /> 3.2 New Phase 2 nomenclature............................................................................................................18 <br /> 3.2.1 Alternative 6 (Alt 6) ............................................................................................................18 <br /> 3.2.2 Lake (L)..............................................................................................................................18 <br /> 3.2.3 Version 2.0 (V20)...............................................................................................................18 <br /> 3.2.4 Contributory (ca) and Lake (la) drainage areas.................................................................18 <br /> 3.2.5 Phase 2 Pump Station (PS)...............................................................................................18 <br /> 3.3 List of Modelled Scenarios for Phase 2 ..........................................................................................19 <br /> 4 Results from the Analyses XPSWMM models.....................................................................................20 <br /> 4.1 Maximum Instantaneous Peak water surface elevation and Static water surface elevation..........26 <br /> 4.2 Maximum Peak Water Surface Elevation .......................................................................................26 <br /> 4.3 Maximum stable water surface elevations......................................................................................26 <br /> 4.4 Average Time to a 7 feet Water Surface Elevation.........................................................................26 <br /> 4.5 Peak Duration and Time to Stable..................................................................................................26 <br /> 4.6 Difference between the two hydrograph methods (ca and la)........................................................27 <br /> 4.7 Outfall manifold velocity..................................................................................................................27 <br /> 4.8 Phase 1 impact................................................................................................................................28 <br /> 5 Conclusions............................................................................................................................................29 <br /> River Islands Phase 2 Stormwater Mitigation Rev 2 1 1� <br /> PACE <br />
The URL can be used to link to this page
Your browser does not support the video tag.