Laserfiche WebLink
5 Conclusions <br /> The results indicate that the lakes and pump capacities are sufficient for interim stormwater storage and <br /> drainage with no water surface elevation exceeding the expected lowest road elevation (assuming the <br /> lowest elevation is no less than 10.5 as for Phase 1). <br /> River Islands Phase 2 Stormwater Mitigation Rev 2 29 1� <br /> PACE <br />