Laserfiche WebLink
a <br /> d <br /> 1 0 <br /> D � <br /> ME <br /> 6 <br /> L-8 <br /> o (BOT ELEV @ -20) <br /> a <br /> Q <br /> / v <br /> L-10 ° <br /> (BOT ELEV @ -24) ' <br /> a <br /> o I , <br /> o <br /> 0 <br /> L-7 <br /> (BOT ELEV @ -20) <br /> a , L9 <br /> o v n <br /> (BOT ELEV @ -24) D <br /> L-12 <br /> (BOT ELEV @ -24) L-11 po <br /> BOT ELEV -24 \ <br /> L-5 000 \ <br /> (BOT ELEV @ -24) <br /> o L-4 <br /> (BOT ELEV @ -18) <br /> (BOT ELEV @ -17) <br /> e o <br /> 0 <br /> .. l <br /> Q L-2 <br /> (BOT ELEV @ -15) <br /> � o <br /> L-3 <br /> �d (BOT ELEV @a -20) <br /> o <br /> 0 <br /> D <br /> 0 <br /> a <br /> LLLLUJI NNI'Z Z" <br /> 0 <br /> o � <br /> e� <br /> ° e <br /> 01 a, (BOT ELEV @ -24) <br /> � d <br /> 0 <br /> Q <br /> 0 <br /> 0 <br /> \ o <br /> e o <br /> e <br /> D I <br /> 6 <br /> ° � o <br /> e <br /> D <br /> PHASE 2 LAKES <br /> SITEAREA (AC) PERIMETER (FT) ULTIMATE LAKE BOTTOM ELEV. STORAGE 0 L-13 <br /> (FT) VOLUME (CY) ` (BOT ELEV @ -24) <br /> L-1 56.2± 8,870± -24 484,200± <br /> L-2 8.1± 3,190± -15 66,700± <br /> 0 <br /> L-3 18.6± 5,100± -20 156,900± 4 <br /> L-4 6.8± 2,220± -18 56,500± \ d <br /> L-5 11.9± 4,990± -24 97,100± <br /> D <br /> L-6 5.0± 1,940± -17 40,900± <br /> L-7 22.8± 4,330± -20 195,100± <br /> L-8 8.0± 2,720± -20 66,400± 7e <br /> L-9 14.3± 3,280± -24 121,500± <br /> L-10 19.7± 4,650± -24 167,400± <br /> � a <br /> L-11 8.1± 2,560± -24 67,900± <br /> L-12 10.3± 3,140± -24 86,300± d \ <br /> L-13 6.5± 2,390± -24 54,000± N <br /> TOTAL 196.3± 49,380± 1,660,900± <br /> D <br /> 1 <br /> NOTES: <br /> 1. ULTIMATE LAKE BOTTOM ELEVATION PER ENGEO'S RECOMMENDATION DATED 02/11/2020. o \ <br /> 2. LAKE PERIMETER LENGTH SHOWN REPRESENTS THE TOTAL LENGTH AT LAKE EDGE. <br /> 3. STORAGE VOLUME IS CALCULATED FROM LAKE EDGE AT ELEVATION 10.5 TO WATER SURFACE ELEVATION @ 5.0. WIT 0' 250' 500' 1000' <br /> O SCALE: 1" = 500' <br /> 0 <br /> PHASE 2 <br /> LAKE EXHIBIT <br /> EN G1NEEf� 1NG <br /> RIVERISLANDS 6200 Stoneridge Mall Road, Suite 330 <br /> Pleasanton, CA 94588 <br /> CITY OF LATHROP SAN JOAQUIN COUNTY CALIFORNIA <br /> DATE: APRIL 03, 2020 Ph 925.223.8340 odellengineering.com <br /> T:\25503—RIVER ISLANDS\PHASE 43 — PHASE 2 CONCEPTUAL LAYOUT\ACAD\PHASE 2 LAKES\PHASE 2 LAKE EXHIBIT\PHASE 2 LAKE EXHIBIT.DWG <br />