Laserfiche WebLink
River Islands Development at Lathrop January 2021 <br /> Final River Islands Potable Water Technical Report—Rev 3 #6520 <br /> 1 Introduction <br /> 1.1 Background <br /> River Islands, located on the Stewart Track in the City of Lathrop, is a 4,905-acre, master planned <br /> community to be constructed southwest of the San Joaquin River. The River Islands development will <br /> consist of low, medium and high density residential,schools(institutional), parks and commercial land uses. <br /> River Islands will be constructed in two separate phases known as Phase I and Phase 11. Phase I is <br /> currently being constructed over 4 separate stages and Phase II is entering the master planning stages. <br /> The River Islands development is located within the southwest area of the City of Lathrop's service area <br /> and will utilize the City's Potable Water(PW)distribution system for domestic,commercial,specific irrigation <br /> areas,and school PW demands. The distribution system will also service fire flows within the development. <br /> The City's distribution system operates as a single pressure zone, pressurized from different booster pump <br /> stations and storage sites spread throughout the City. The River Islands development will expand the City's <br /> distribution system to contain two additional City owned and operated Potable Water (PW) booster pump <br /> stations and water storage tank sites at full buildout conditions, in addition to the SSJID Turnout#2 and 1 <br /> MG Tank currently under construction. <br /> River Islands PW distribution system will be required to be planned, designed, and constructed per the City <br /> of Lathrop's Design and Construction Standards (City Standards) and the 2018 City of Lathrop's Water <br /> System Master Plan (City's Water Master Plan). The City Standards and Water Master Plan were created <br /> to provide the minimum requirements for all facilities and appurtenances to be turned over to the City for <br /> operation and maintenance. This report will be the basis for a required update to the City's Water Master <br /> Plan, including an update of the City's water system model, due to the increased level of detail now <br /> available, and due to City's determination that the water use per unit has decreased, the number of <br /> residential units has increased and the acres of commercial uses have decreased, together reducing the <br /> anticipated demand. <br /> 1.2 Report Objectives <br /> The objectives of the River Islands Potable Water Technical Report are as follows: <br /> • Provide updates to the previous Phase I Potable Water Master Plan prepared by PACE in 2017. <br /> • Analyze and quantify the land uses for Phase I and 11. <br /> • Analyze and model the Average Day Demands (ADD) for Phase I and 11 in accordance with the <br /> City of Lathrop's Standards, Water Master Plan and historical water uses provided by River Islands <br /> under Steady State Conditions. <br /> • Analyze and model the Maximum Day Demand (MDD) for Phase I and 11 in accordance with the <br /> City of Lathrop's Standards and Water Master Plan under Steady State Conditions. <br /> • Analyze and model the Peak Hour Demands (PHD)for Phase I and II in accordance with the City <br /> of Lathrop's Standards and Water Master Plan under Steady State Conditions. <br /> • Analyze and model the available fire flows for Phase I and 11 after potable water demands have <br /> been satisfied in accordance with the City of Lathrop's Standards and Water Master Plan. <br /> • Analyze and describe the overall River Islands PW Distribution System <br /> • Provide preliminary performance requirements for the Phase 11 potable water distribution system. <br /> • Present the potential impact Phase 11 potable water demands on Phase 1. <br /> 6 <br />