My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> N <br /> N <br /> S2 U) \ <br /> O <br /> J Q O <br /> C-6 Q p NLL L <br /> rt+ <br /> Q LU <br /> _ U) I <br /> Color Coding Legend y <br /> Junction:Pressure(psi) Q X rn <br /> W <br /> cQ CL <br /> O <=40 (/) C I <br /> —50 <br /> O <=60 <br /> O <=70 <br /> <=80 <br /> O Other <br /> L-13 <br /> Q Ad <br /> U = <br /> CL <br /> Cl OF LATHROP <br /> CON ECTION#1 RAVER C <br /> SAN JOAQUIN <br /> ISLANDS PARKWAY <br /> 20-INCH Uj <br /> ZSTgP of C <br /> Twp 3 <br /> L-5 � <br /> Z � � J <br /> L-,2 W <br /> FLL <br /> STATION L TION L9 i g <br /> L6 z J � Y <br /> SCHOOL LA W O <br /> SRP SCHOOL W Z <br /> � L-,0 NO <br /> / HIGH RIVER ISLANDS PARKWAY <br /> �— <br /> SCHOOL '�',aaouw I 1 I F <br /> I ® I E <br /> ® ® L7 CITY OF LATHRO= (L 1L� m <br /> CONNECTION kJ � O <br /> ' <br /> — STEWART BOAC <br /> 16-INCH c ~ <br /> I <br /> eStaE� <br /> L19 L1 N U) <br /> ((� S F7 L � <br /> ®® PHASE II BPS F1T11 I 1 I I® 2,4P o�� L-2 CON ECTION `— Z <br /> PN CONNECTION 0] Q J <br /> ® E o <br /> SITEA( <br /> SOH00 yo J ('n <br /> YZ4 OL y � TURNOUT#2) <br /> SPHASEIBPS <br /> L 21 - <br /> I <br /> ® N y O O 'Cos STORNOWAYAVENUE ®® � R�P r 00 1 <br /> ®® ® QWes L 2 on N <br /> o <br /> D <br /> E-0 Y Z N <br /> SCHOOL � O O <br /> O <br /> L 16 AR/rR'AY �� ry <br /> 5 \ 4p6 <br /> Q o fn <br /> m c <br /> a <br /> 00 <br /> moa O <br /> MR <br /> O <br /> V w <br /> \ aQoa <br /> NOTES 7. THE SSJID CONNECTION ALONG STEWART ROAD IS ASSUMED TO HAVE A 40 PSI STATIC PRESSURE. Z <br /> 1. RIVER ISLANDS POTABLE WATER DISTRIBUTION MODEL IS BASED ON UTILITY IMPROVEMENT AND AS BUILT PLANS B. LAYOUrr ANDCONTROL STRATEGY OF THE SSJID TURNOUT#2,1.0 MG SURGE TANK,AND THE SSJID TRANSFER PUMPS <br /> PROVIDED BY ODELL ENGINEERING AND RIVER ISLANDS. IS TAKEN FROM THE SITE A SSJID 100%ISSUED FOR CONSTRUCTION PLANS AND SPECIFICATIONS. 01 <br /> 2. LOCATION AND ELEVATION OF ALL PIPES,FITTINGS,VALVES,AND HYDRANTS ARE APPROXIMATED FROM UTILITY 9. LAYOUT AND CONTROL STRATEGY OF THE SITES(RIVER ISLANDS)BOOSTER PUMP STATION AND STORAGE TANKS IS -+ C <br /> IMPROVEMENT PLANS PROVIDED BY ODELL ENGINEERING AND RIVER ISLANDS. TAKEN FROM THE SITE B 100%ISSUED FOR CONSTRUCTION PLANS AND SPECIFICATIONS. <br /> 3. FOR LOCATIONS WHERE FINALIZED OR AS BUILT UTILITY IMPROVEMENT PLANS ARE NOT AVAILABLE,POTABLE WATER 10. LAYOUT AND CONTROL STRATEGY OF THE PHASE II WATER TANK AND PUMP STATION SITE IS ASSUMED TO BE N <br /> N <br /> DEMANDS AND THE LAYOUT OF THE DISTRIBUTION SYSTEM FOLLOW THE MINIMUM REQUIREMENTS IN THE CITY OFSIMILARTOTHERIVERISLANDS TANK AND PS SITE. C <br /> LATHROP'S 2019 DESIGN AND CONSTRUCTION STANDARDS. 11. THE FIRE FLOW STEADY STATE ANALYSIS WAS MODELED TO PROVIDE A RESIDUAL PRESSURE OF 20 PSI IN THE AREA FIGURE •� <br /> 4. POTABLE WATER DEMANDS UTILIZED WATER DEMAND AND PEAKING FACTORS LISTED IN THE CITY OF LATHROP'sOF THE SIMULATED FIRE UNDER MAXIMUM DAY OR PEAK HOUR DEMANDS. C <br /> DESIGN AND CONSTRUCTION STANDARDS.WATER DEMANDS WHERE ASSIGNED BASED ON EACH PARCEL'S LAND USE 12. THE RIVER ISLANDS AND PHASE II PUMP STATIONS ARE DESIGNED TO MAINTAIN A DISCHARGE PRESSURE OF 67.5 PSI. W <br /> PROVIDED BY ODELL ENGINEERING. 13. AS REQUIRED BY CITY OF LATHROP'$2018 WATER MASTER PLAN,A 6%WATER LOSS(NON-REVENUE WATERS FACTOR O/ <br /> 5. THE PRESENTED POTABLE WATER MODEL RESULTS ARE FOR STEADY STATE SITUATIONS(I.E.NOT FOR EXTEND TIME IS APPLIED TO THE WATER DEMANDS PROJECTIONS TO ESTIMATE AVERAGE DAY DEMANDS. 7 N <br /> FRAMES). 117 <br /> 6. THE CITY OF LATHROP POTABLE WATER CONNECTION ALONG RIVER ISLANDS PARKWAY AND STEWART ROAD IS m <br /> ASSUMED TO HAVE A 40 PSI STATIC PRESSURE AND WILL SERVE AS A BACKUP SUPPLY OF POTABLE WATER FOR <br /> RIVER ISLANDS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.