My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
River Islands Development at Lathrop January 2021 <br /> Final River Islands Potable Water Technical Report—Rev 3 #6520 <br /> 5.4 Steady State Analysis Results— Peak Hour Demands <br /> Figure 5-9, Figure 5-10, and Figure 5-11 shows the results of the steady state analysis for each pipe <br /> velocities, headloss gradients and the junction and hydrant pressures under PHD. <br /> Table 5-4 shows the specific minimum and maximum model results and their corresponding location under <br /> PHD. For Phase II, the preliminary pipe sizes were estimated based on the minimum requirements listed <br /> in the City's Standards and Water Master Plan. The pipe sizes shown Phase II are recommended to be <br /> revisited when Phase II land use plan has been finalized or revised to verify the system's performance. <br /> The results of the steady state analysis under PHDs determined that PW supply from SSJID turnout <br /> #2 will not be sufficient to instantaneously meet Phase I and II PHD. It is recommended that an <br /> extended state analysis be conduct over a couple of days to verify if the tanks can be re-filled during <br /> off peak windows utilizing the City's distribution system. <br /> Table 5-4: Steady State Analysis Results— Peak Hour Demands <br /> City <br /> Model Result Category Units Result Requirements Location <br /> Minimum Pipe Velocity ft/s 0.01 N/A Several locations, all in <br /> tributary areas <br /> Maximum Pipe Velocity ft/s 3.28 10 P-1223, 24-inch main in <br /> Golden Valley Parkway <br /> Minimum Headloss Gradient ft/1000ft 0.01 N/A Several locations, all in <br /> tributary areas <br /> Several segments of the 24- <br /> Maximum Headloss Gradient ft/1000ft 2.5-2.7 N/A inch and 16-inch water lines <br /> along Golden Valley Parkway <br /> Several Junctions in Phase <br /> 1A and 1B of Phase I along <br /> Minimum System Pressure psi 58-<60 40 the San Joaquin River and at <br /> the location of the Phase 11 <br /> High School <br /> Junctions along J-7 street <br /> Maximum System Pressure psi <67.5-70 80 immediate downstream of the <br /> Phase I BPS <br /> Flow Supplied' gpm Varies N/A <br /> Flow Demand2 gpm 10,372 N/A Peak Hour Demand <br /> Flow Stored3 gpm Varies N/A <br /> NOTES: <br /> 'See Section 5.1 <br /> 2Flow Demand is equal to the sum of the total potable water demands met. <br /> 'See Section 5.1 <br /> 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.