River Islands Development at Lathrop January 2021 <br /> Final River Islands Potable Water Technical Report-Rev 3 #6520 <br /> 6 Preliminary Improvement Implementation Schedule <br /> 6.1 Preliminary Improvement Implementation Schedule <br /> The River Islands PW demands should be regularly monitored to help update and confirm the installed <br /> distribution system can reliable meet the system demands. The design of improvements should begin <br /> when the installed system has reached 60-80 percent of its rated capacity, depending on the complexity of <br /> the improvement. As described in Section 5 & 3, distribution systems must have a firm pumping capacity <br /> capable of supplying the greater of the MDD + Fire Flow or PHD, and must have enough PW storage to <br /> meet emergency, operational, and fire flow storage requirements. <br /> Construction of River Islands is estimated to be completed by 2040, and will continue to be constructed <br /> over separate stages. Based on conversations and planning documents provided by River Islands, Table <br /> 6-1 shows the preliminary construction schedule of the River Islands development and the associated ADD, <br /> MDD, and PHDs. <br /> Table 6-1: Preliminary River Islands Construction Schedule &Associated Demands <br /> No of Units or Acreage Completed&Connected <br /> Land Use 2014-2020 2020-2025 2025-2030 2030-2035 2035-2040 <br /> Low Density Residential(per DU) 2,000.0 3,536.0 4,754.3 5,972.6 7,190.9 <br /> Medium Density Residential(per DU) 125.0 801.0 1,746.0 2,690.9 3,635.9 <br /> High Density Residential(per DU) 0.0 0.0 1,394.4 2,788.8 4,182.8 <br /> Commercial(per acre) 0.0 0.0 95.8 191.5 287.3 <br /> Industrial(per acre) 0.0 0.0 0.0 0.0 0.0 <br /> Parks(per acre) 10.8 17.4 24.0 30.5 65.1 <br /> Schools/Institutional(per acre) 15.8 38.4 43.8 49.0 61.8 <br /> Average Day Demand(GPD) 744,933 1,472,306 2,418,002 3,363,407 4,392,724 <br /> Average Day Demand(GPM) 517 1,022 1,679 2,336 3,051 <br /> Maximum Day Demand(GPD) 1,266,386 2,502,920 4,110,603 5,717,792 7,467,631 <br /> Maximum Day Demand(GPM) 879 1,738 2,855 3,971 5,186 <br /> Peak Hour Demand(GPD) 2,532,772 5,005,840 8,221,206 11,435,584 14,935,262 <br /> Peak Hour Demand(GPM) 1,759 3,476 5,709 7,941 1 10,372 <br /> Notes: <br /> 1. Based on River Islands Village Detail (Phase 1 and 2) - Final V2.0 Spreadsheet showing the preliminary construction <br /> schedule for the River Islands Development. <br /> The Phase I BPS site is nearing completion and will be initially installed with a firm pumping capacity of <br /> 6,000 GPM and a PW Storage Capacity of 1.5 MG. Based on the preliminary construction schedule and <br /> associated demands shown in Table 6-1, Table 6-2 below shows the minimum preliminary improvement <br /> implementation schedule in order for the River Islands distribution system to meet the firm pumping <br /> capacity and PW storage requirements. It is recommended to coordinate the implementation of the <br /> improvements to efficiency service the expanding development(i.e. install the 1.5 MG and 1.6 MG Phase <br /> BPS tanks at once instead of piece meal). <br /> Currently the City has allowed River Islands to utilize the existing City-wide fire storage capacity until the <br /> future 1.5 and 1.6 MG tanks are installed at the Phase I BPS and Storage site. As shown below,the current <br /> 2014-2020 potable water storage requirement is equal to the approximate maximum day demand of <br /> 1,266,386 GPD (no dedicated fire storage required within River Islands). <br /> 40 <br />