Laserfiche WebLink
Table 5(Cont.) <br /> Projected Water Demand by Development Area <br /> Land Use Designation Updated Demand Factor Projected New Water Demand(AFY)(a) <br /> 2020 2025 2030 2035 204 Buildout <br /> Historic Lathrop and Other Develo ment Areas <br /> Low Density Residential 330 gpd/du 0 2 4 7 9 19 <br /> Medium Density Residential 250 gpd/du 0 8 15 22 29 61 <br /> High Density Residential 135 gpd/du 0 0 0 0 0 7 <br /> Commercial 860 gpd/ac 2 24 35 47 47 47 <br /> Industrial 1,200 gpd/ac 0 105 105 105 298 298 <br /> Parks 3,500 gpd/ac 0 0 0 0 0 0 <br /> Schools 2,100 gpd/ac 0 0 0 0 0 0 <br /> New Historic Lathrop/Other Demand 2 138 159 180 383 433 <br /> New Non-revenue Water(5%) - - - - - - <br /> Existing Historic Lathrop/Other Demand 2,475 2,475 2,475 2,475 2,475 2,475 <br /> Projected Historic Lathrop Other Demand 2,477 2,613 2,634 2,655 2,858 2,908 <br /> Sharpe Army Depot <br /> AMES 16 16 16 16 16 16 <br /> California Military Department - 25 41 41 41 41 41 <br /> Schools 2,100 0 0 0 0 0 0 0 <br /> New Sharpe Army Depot Demand 41 56 56 56 56 56 <br /> Existing Sharpe Army Depot Demand 0 0 0 0 0 0 <br /> Projected Sharpe Army Depot Demand 41 56 56 56 56 56 <br /> Total Projected New Urban Consumption 756 2,901 4,345 5,395 6,785 9,114 <br /> Agricultural Consumption(b) 186 0 0 0 0 0 <br /> Baseline Urban Consumption 4,430 4,430 4,430 4,430 4,430 4,430 <br /> q7To:talUr:banand Agricultural Non-revenue Water(5%) 269 367 439 491 561 677 <br /> TOTAL PROJECTED DEMAND 5,640 7,697 9,213 10,316 11,775 14,221 <br /> Notes: <br /> (a) Projected residential water demand calculated as the total number of projected residential dwelling units <br /> (Table 2-1)multiplied by the applicable water demand factor(Table 3-4).Projected non-residential water <br /> demand calculated as the total projected acreage(Table 2-1)multiplied by the applicable water demand <br /> (b) Agricultural consumption is assumed to be the average water use during 2017-2019 for the City's single <br /> agricultural customer and will be replaced by development at Lathrop Gateway. <br />