Laserfiche WebLink
River Islands Development at Lathrop January 2021 <br /> FINAL River Islands Non-Potable Water Technical Report Rev 2 #6520 <br /> List of Figures <br /> Figure 4-1: River Islands Non-Potable Water Distribution System Schematic...........................................17 <br /> Figure 4-2: River Islands NPW Distribution Areas Exhibit..........................................................................18 <br /> Figure 5-1: River Islands Non-Potable Water Distribution Model — Phase I and II Peak Irrigation Demands <br /> (8-hr)— Headloss Gradient— 16 and 8-inch NPW Mains— P Street..........................................................21 <br /> Figure 5-2: River Islands Non-Potable Water Distribution Model — Phase I and II Peak Irrigation Demands <br /> (8-hr)— Pipe Velocities................................................................................................................................23 <br /> Figure 5-3: River Islands Non-Potable Water Distribution Model — Phase I and II Peak Irrigation Demands <br /> (8-hr)— Pipe Headloss Gradients ...............................................................................................................24 <br /> Figure 5-4: River Islands Non-Potable Water Distribution Model — Phase I and II Peak Irrigation Demands <br /> (8-hr)— Pressures.......................................................................................................................................25 <br /> List of Tables <br /> Table 2-1: Gross (Total) Non-Potable Water Irrigation Areas— Phase I ......................................................7 <br /> Table 2-2: Net Non-Potable Water Percent Irrigation Areas— Phase I ........................................................8 <br /> Table 2-3: Net Non-Potable Water Irrigation Areas— Phase 1......................................................................8 <br /> Table 2-4: Net Non-Potable Water Irrigation Percentage and Areas— Phase II ..........................................9 <br /> Table 2-5: Net Non-Potable Water Irrigation Areas— Phase I and 11............................................................9 <br /> Table 3-1: Peak Month Daily Irrigation Demand Factor Over 8 Hours.......................................................11 <br /> Table 3-2: Peak Month Daily Irrigation Demand Factor Over 8 Hours.......................................................12 <br /> Table 3-3: Main Pump Station Irrigation Skid — Firm Pumping Capacity....................................................13 <br /> Table 3-4: Proposed Phase II NPW Pump Stations— Firm Pumping Capacity..........................................14 <br /> Table 5-1: Steady State Analysis Results— Peak Month Irrigation Demands............................................22 <br /> Table 6-1: Preliminary River Islands Construction Schedule &Associated Net NPW Irrigation Area........27 <br /> Table 6-2: Preliminary River Islands Construction Schedule &Associated Peak Month Irrigation Demands <br /> over Daily 8-Hour Irrigation Window...........................................................................................................27 <br /> Table 6-3: Minimum Preliminary Improvement Implementation Schedule .................................................28 <br /> Appendices: <br /> Appendix A—Stage 1A, 1 B, 2A, and 2B Irrigation Coverage Exhibits <br /> Appendix B— Phase I Land Use Exhibit <br /> Appendix C—CIMIS Station 70 Historical Precipitation and Evapotranspiration Data <br /> Appendix D— Peak Irrigation Demand Calculation <br /> Appendix E - Phase 11 Lotting Summary Exhibit <br /> Appendix F - Phase II NPW and RW Preliminary Utility Exhibit <br /> Appendix G - Pages from 2017 River Islands Main Pump Station Plans <br /> Appendix H — Preliminary Phase II NPW Irrigation Map <br /> 3 <br />