My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
River Islands Development at Lathrop January 2021 <br /> FINAL River Islands Non-Potable Water Technical Report Rev 2 #6520 <br /> 5 River Islands Non-Potable Water Distribution System Model - <br /> Results <br /> 5.1 Steady State Analysis Results— Peak Month Irrigation Demands - Recommendations <br /> As shown in Appendix F, the preliminary NPW utility exhibit showed a 16-inch, and an 8-inch NPW line <br /> connecting the Phase II NPW PS to the distribution system. The hydraulic model results determined that <br /> both the 16-inch and 8-inch mains under P-Street would operate with a velocity range of 6.5-8 feet per <br /> second (ft/s) under PMID. While this does not exceed the City's operational requirements, operating with <br /> a high velocity range is not recommended for the following reasons. <br /> • The distribution pressures in the system will decrease from 80 psi (see Figure 5-1) at the pump <br /> stations down to 58-60 psi at the ends of the system. This pressure drop is in result to <br /> approximately 10 psi of head losses from the Phase II NPW PS to the respective connections <br /> along River Islands Parkway. This will result in additional electrical power usage as well as wear <br /> on the irrigation pumps from having to overcome the high friction losses. <br /> • The pressures shown in the model results are for the distribution system and are not the pressures <br /> at the individual meters/service laterals. Therefore, the expected pressure at the actual irrigation <br /> service can be expected to be lower due to line and meter losses. The lower distribution pressure <br /> may result in decreased performance of the connected irrigation systems under PMIDs. <br /> Therefore, it is recommended that the 8-inch NPW main under P-Street be upsized to a 16-inch main to <br /> account for the proposed location of the Phase II NPW PS. Furthermore,the existing 8-inch NPW stub out <br /> connection under River Islands Parkway is recommended to be upsized to 16-inches as well. <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.