My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FtPER Power Systems Design <br /> 2033 N. Main St.STE 200 <br /> SYSTEMS <br /> ����� Walnut Creek,CA 94596 <br /> Phone:925-933-8485 <br /> July 27, 2020 <br /> River Islands at Lathrop <br /> Attn: Mr. Ramon Batista <br /> 73 Stewart Road <br /> Lathrop, CA 95330 <br /> Subject: River Islands at Lathrop Master Plan Electric and Natural Gas Utility Loads <br /> and Planned Ultimate System Capabilities <br /> Dear Mr. Batista: <br /> Pursuant to our recent discussion, this transmittal is to provide information relevant to the requirements <br /> and capabilities of electric and gas utilities within the comprehensive master plan of River Islands at <br /> Lathrop as a result of the increased loads expected with the proposed Phase 2 densification/intensification <br /> of both residential and non-residential land uses. <br /> Based on the latest programming,the overall requirements of the project are as follows; <br /> • 15,010 residential units <br /> 0 5,381,022 square feet of aggregate office, commercial, and retail space. <br /> Utilizing historical and published utility data, Power Systems Design (PSD) has determined that the <br /> loads anticipated at full build out of the project appear to be adequate. This adequacy is not does not <br /> include reduction of load based on existing or anticipated photovoltaic contributions to the electric <br /> distribution system. Such reductions are likely, since recent State building code updates now mandate <br /> solar panels on new single family homes. <br /> To summarize electrical demand: <br /> PSD has estimated the residential component load to be about 45MVA design. <br /> PSD has estimated the office, commercial and retail component load to be about 38MVA design(based <br /> on two methods of load estimation;municipal and public utility algorithms utilized by Modesto Irrigation <br /> District and Pacific Gas and Electric. <br /> Total electric demand for the master plan has been estimated by PSD to be about 83MVA design. <br /> Existing and proposed master plan electrical substation infrastructure (constructed in 2014 through 2016) <br /> includes space to accommodate three (3) 115kV/2lkV transformers; which will provide adequate <br /> capacity for the ultimate build out. Nine (9) 2lkV distribution feeders (aggregate rating in excess <br /> of the substation transformer bank capacity) are planned to accommodate the ultimate development. <br /> PSD has determined that the electric distribution system capability is adequate for the latest programming. <br /> 115kV line (constructed 2015) capacity based on conductor rating is about 112 MVA and will support <br /> the proposed ultimate build out of the development. <br /> Please note that the above demands are based on design, actual use will be less than the design values. <br />
The URL can be used to link to this page
Your browser does not support the video tag.