Laserfiche WebLink
FtPER Power Systems Design <br /> 2033 N. Main St.STE 200 <br /> SYSTEMS <br /> ����� Walnut Creek,CA 94596 <br /> Phone:925-933-8485 <br /> July 27, 2020 <br /> River Islands at Lathrop <br /> Attn: Mr. Ramon Batista <br /> 73 Stewart Road <br /> Lathrop, CA 95330 <br /> Subject: River Islands at Lathrop Master Plan Electric and Natural Gas Utility Loads <br /> and Planned Ultimate System Capabilities <br /> Dear Mr. Batista: <br /> Pursuant to our recent discussion, this transmittal is to provide information relevant to the requirements <br /> and capabilities of electric and gas utilities within the comprehensive master plan of River Islands at <br /> Lathrop as a result of the increased loads expected with the proposed Phase 2 densification/intensification <br /> of both residential and non-residential land uses. <br /> Based on the latest programming,the overall requirements of the project are as follows; <br /> • 15,010 residential units <br /> 0 5,381,022 square feet of aggregate office, commercial, and retail space. <br /> Utilizing historical and published utility data, Power Systems Design (PSD) has determined that the <br /> loads anticipated at full build out of the project appear to be adequate. This adequacy is not does not <br /> include reduction of load based on existing or anticipated photovoltaic contributions to the electric <br /> distribution system. Such reductions are likely, since recent State building code updates now mandate <br /> solar panels on new single family homes. <br /> To summarize electrical demand: <br /> PSD has estimated the residential component load to be about 45MVA design. <br /> PSD has estimated the office, commercial and retail component load to be about 38MVA design(based <br /> on two methods of load estimation;municipal and public utility algorithms utilized by Modesto Irrigation <br /> District and Pacific Gas and Electric. <br /> Total electric demand for the master plan has been estimated by PSD to be about 83MVA design. <br /> Existing and proposed master plan electrical substation infrastructure (constructed in 2014 through 2016) <br /> includes space to accommodate three (3) 115kV/2lkV transformers; which will provide adequate <br /> capacity for the ultimate build out. Nine (9) 2lkV distribution feeders (aggregate rating in excess <br /> of the substation transformer bank capacity) are planned to accommodate the ultimate development. <br /> PSD has determined that the electric distribution system capability is adequate for the latest programming. <br /> 115kV line (constructed 2015) capacity based on conductor rating is about 112 MVA and will support <br /> the proposed ultimate build out of the development. <br /> Please note that the above demands are based on design, actual use will be less than the design values. <br />