Laserfiche WebLink
CaIEEMod Version: CalEEMod.2016.3.2 Page 3 of 17 Date: 7/28/2020 11:37 AM <br /> River Islands Phase 2 Construction Emissions (Max Daily) - San Joaquin County, Summer <br /> tblOffRoad Equipment HorsePower 402.00 504.00 <br /> ---------------------- Y----------------------------- -----------------------------T-------------------------- <br /> tblOffRoad Equipment LoadFactor } 0.48 0.29 <br /> tblOffRoadEquipment LoadFactor } 0.40 0.20 <br /> tblOffRoad Equipment LoadFactor } 0.38 0.74 <br /> tblOffRoad Equipment LoadFactor } 0.38 0.37 <br /> tblOffRoadEquipment LoadFactor } 0.37 0.45 <br /> tblOffRoad Equipment LoadFactor } 0.38 0.38 <br /> tblOffRoadEquipment LoadFactor } 0.38 0.38 <br /> tblOffRoadEquipment OffRoadEquipmentType } Cranes Scrapers <br /> tblOffRoad Equipment OffRoadEquipmentType } Forklifts Rubber Tired Dozers <br /> tblOffRoad Equipment OffRoadEquipmentType } Generator Sets Off-Highway Trucks <br /> tblOffRoad Equipment OffRoadEquipmentType } Tractors/Loaders/Backhoes Excavators <br /> tblOffRoadEquipment OffRoadEquipmentType i Off-Highway Trucks <br /> tblOffRoadEquipment OffRoadEquipmentType } Off-Highway Trucks <br /> tblOffRoad Equipment OffRoadEquipmentUnitAmount } 3.00 5.00 <br /> tblOffRoad Equipment UsageHours } 7.00 8.00 <br /> tblProjectCharacteristics CO21ntensityFactor } 641.35 208 <br /> tblTripsAndVMT Haul ingTripLength i 20.00 15.00 <br /> tblTripsAndVMT VendorTripN umber 1 6,990.00 100.00 <br /> tblTripsAndVMT WorkerTripNumber 1 20,966.00 448.00 <br /> tblWoodstoves NumberCatalytic } 157.30 36.40 <br /> ---------------------------- ------------------------------ ------------------------------ -------------------------- <br /> tblWoodstoves NumberNoncatalytic 157.30 36.40 <br /> 2.0 Emissions Summary <br />