My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
River Islands at Lathrop Phase 2 - 2 - 26 March 2020 <br /> Project / Update to the West Lathrop Specific Plan <br /> San Joaquin County <br /> the State Water Resources Control Board (State Water Board), Office of <br /> Administrative Law (OAL) and in some cases, the United States Environmental <br /> Protection Agency (USEPA). Basin Plan amendments only become effective after <br /> they have been approved by the OAL and in some cases, the USEPA. Every three <br /> (3) years, a review of the Basin Plan is completed that assesses the appropriateness <br /> of existing standards and evaluates and prioritizes Basin Planning issues. For more <br /> information on the Water Quality Control Plan for the Sacramento and San Joaquin <br /> River Basins, please visit our website: <br /> http://www.waterboards.ca.gov/centralvalley/water issues/basin plans/ <br /> Antidegradation Considerations <br /> All wastewater discharges must comply with the Antidegradation Policy (State Water <br /> Board Resolution 68-16) and the Antidegradation Implementation Policy contained in <br /> the Basin Plan. The Antidegradation Implementation Policy is available on page 74 <br /> at: <br /> https://www.waterboards.ca.gov/centralvalley/water issues/basin plans/sacsir 2018 <br /> 05.pdf <br /> In part it states: <br /> Any discharge of waste to high quality waters must apply best practicable treatment <br /> or control not only to prevent a condition of pollution or nuisance from occurring, but <br /> also to maintain the highest water quality possible consistent with the maximum <br /> benefit to the people of the State. <br /> This information must be presented as an analysis of the impacts and potential <br /> impacts of the discharge on water quality, as measured by background <br /> concentrations and applicable water quality objectives. <br /> The antidegradation analysis is a mandatory element in the National Pollutant <br /> Discharge Elimination System and land discharge Waste Discharge Requirements <br /> (WDRs) permitting processes. The environmental review document should evaluate <br /> potential impacts to both surface and groundwater quality. <br /> II. Permitting Requirements <br /> Construction Storm Water General Permit <br /> Dischargers whose project disturb one or more acres of soil or where projects <br /> disturb less than one acre but are part of a larger common plan of development that <br /> in total disturbs one or more acres, are required to obtain coverage under the <br /> General Permit for Storm Water Discharges Associated with Construction Activities <br /> (Construction General Permit), Construction General Permit Order No. 2009-009- <br /> DWQ. Construction activity subject to this permit includes clearing, grading, <br /> grubbing, disturbances to the ground, such as stockpiling, or excavation, but does <br /> not include regular maintenance activities performed to restore the original line, <br /> grade, or capacity of the facility. The Construction General Permit requires the <br /> development and implementation of a Storm Water Pollution Prevention Plan <br /> (SWPPP). For more information on the Construction General Permit, visit the State <br /> Water Resources Control Board website at: <br />
The URL can be used to link to this page
Your browser does not support the video tag.