Laserfiche WebLink
River Islands Phase 2 SEIR Cumulative Plus Approved Project <br /> 6: MacArthur Drive & EB I-205 Off/On-Ramps AIM Peak Hour <br /> -11 --,, 4--- t t <br /> Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Traffic Volume(vph) 40 0 400 0 0 0 0 360 160 80 180 0 <br /> Future Volume(vph) 40 0 400 0 0 0 0 360 160 80 180 0 <br /> Confl. Peds. (#/hr) 2 <br /> Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 <br /> Shared Lane Traffic(%) <br /> Lane Group Flow(vph) 0 42 421 0 0 0 0 379 168 84 189 0 <br /> v/c Ratio 0.17 0.73 0.21 0.19 0.38 0.15 <br /> Control Delay 23.1 10.5 10.6 3.5 24.5 3.1 <br /> Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 <br /> Total Delay 23.1 10.5 10.6 3.5 24.5 3.1 <br /> Queue Length 50th(ft) 16 0 36 0 17 0 <br /> Queue Length 95th(ft) 33 59 91 36 59 81 <br /> Internal Link Dist(ft) 966 991 741 260 <br /> Turn Bay Length(ft) 400 350 <br /> Base Capacity(vph) 552 776 1816 870 241 1254 <br /> Starvation Cap Reductn 0 0 0 0 0 0 <br /> Spillback Cap Reductn 0 0 0 0 0 0 <br /> Storage Cap Reductn 0 0 0 0 0 0 <br /> Reduced v/c Ratio 0.08 0.54 0.21 0.19 0.35 0.15 <br /> Intersection Summary <br /> Queues <br /> Fehr&Peers Page 9 <br />