My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
River Islands Phase 2 SEIR Cumulative Plus Approved Project <br /> 3: Mossdale Road & NB I-5 Off/On-Ramps PM Peak Hour <br /> Intersection <br /> Int Delay,s/veh 7.2 <br /> Movement EBL EBR NBL NBT SBT SBR <br /> Lane Configurations r + r <br /> Traffic Vol,veh/h 70 220 40 20 30 50 <br /> Future Vol,veh/h 70 220 40 20 30 50 <br /> Conflicting Peds,#/hr 0 0 0 0 0 0 <br /> Sign Control Stop Stop Free Free Free Free <br /> RT Channelized - None - None - None <br /> Storage Length 0 25 - - - 25 <br /> Veh in Median Storage,# 0 - - 0 0 - <br /> Grade, % 0 - - 0 0 - <br /> Peak Hour Factor 95 95 95 95 95 95 <br /> Heavy Vehicles, % 5 5 5 5 5 5 <br /> Mvmt Flow 74 232 42 21 32 53 <br /> Major/Minor Minor2 Majorl Major2 <br /> Conflicting Flow All 137 32 85 0 - 0 <br /> Stage 1 32 - - - - - <br /> Stage 2 105 - - - <br /> Critical Hdwy 6.45 6.25 4.15 - <br /> Critical Hdwy Stg 1 5.45 - - - <br /> Critical Hdwy Stg 2 5.45 - - - <br /> Follow-up Hdwy 3.545 3.345 2.245 - <br /> Pot Cap-1 Maneuver 849 1033 1493 - <br /> Stage 1 983 - - - <br /> Stage 2 912 - - - <br /> Platoon blocked,% - <br /> Mov Cap-1 Maneuver 825 1033 1493 - <br /> Mov Cap-2 Maneuver 825 - - - <br /> Stage 1 955 - - <br /> Stage 2 912 - - <br /> Approach EB NB SB <br /> HCM Control Delay,s 9.6 5 0 <br /> HCM LOS A <br /> Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR <br /> Capacity(veh/h) 1493 - 825 1033 - <br /> HCM Lane V/C Ratio 0.028 - 0.089 0.224 - <br /> HCM Control Delay(s) 7.5 0 9.8 9.5 - <br /> HCM Lane LOS A A A A - <br /> HCM 95th%tile Q(veh) 0.1 - 0.3 0.9 - <br /> HCM 6th TWSC <br /> Fehr&Peers Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.