Laserfiche WebLink
River Islands Phase 2 SEIR Cumulative Plus Approved Project <br /> 6: MacArthur Drive & EB I-205 Off/On-Ramps PIM Peak Hour <br /> -11 --,, 4--- t t <br /> Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Traffic Volume(vph) 80 0 390 0 0 0 0 490 110 70 200 0 <br /> Future Volume(vph) 80 0 390 0 0 0 0 490 110 70 200 0 <br /> Confl. Peds. (#/hr) 2 <br /> Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 <br /> Shared Lane Traffic(%) <br /> Lane Group Flow(vph) 0 84 411 0 0 0 0 516 116 74 211 0 <br /> v/c Ratio 0.34 0.72 0.27 0.13 0.37 0.17 <br /> Control Delay 28.5 10.6 10.6 3.5 43.4 0.6 <br /> Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 <br /> Total Delay 28.5 10.6 10.6 3.5 43.4 0.6 <br /> Queue Length 50th(ft) 34 0 55 0 35 2 <br /> Queue Length 95th(ft) 60 62 124 29 73 3 <br /> Internal Link Dist(ft) 966 991 741 260 <br /> Turn Bay Length(ft) 400 350 <br /> Base Capacity(vph) 584 790 1895 877 213 1271 <br /> Starvation Cap Reductn 0 0 0 0 0 0 <br /> Spillback Cap Reductn 0 0 112 0 0 0 <br /> Storage Cap Reductn 0 0 0 0 0 0 <br /> Reduced v/c Ratio 0.14 0.52 0.29 0.13 0.35 0.17 <br /> Intersection Summary <br /> Queues <br /> Fehr&Peers Page 9 <br />