Laserfiche WebLink
River Islands Phase 2 SEIR Cumulative Plus Proposed Project <br /> 2: Louise Avenue & SB 1-5 Off/On-Ramps PIM Peak Hour <br /> -11 --1' 4--- t t <br /> Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br /> Traffic Volume(vph) 0 2710 2030 0 2890 60 0 0 0 330 0 1090 <br /> Future Volume(vph) 0 2710 2030 0 2890 60 0 0 0 330 0 1090 <br /> Confl. Peds. (#/hr) 10 10 <br /> Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 <br /> Shared Lane Traffic(%) <br /> Lane Group Flow(vph) 0 2853 2137 0 3042 63 0 0 0 347 0 1147 <br /> v/c Ratio 0.95 1.47 1.46 0.04 0.34 1.37 <br /> Control Delay 35.2 226.4 227.3 0.0 40.4 211.0 <br /> Queue Delay 4.0 0.0 0.2 0.0 19.4 0.0 <br /> Total Delay 39.2 226.4 227.5 0.0 59.8 211.0 <br /> Queue Length 50th(ft) 903 1377 2138 0 134 -837 <br /> Queue Length 95th(ft) 987 #1625 m#1516 m0 178 #990 <br /> Internal Link Dist(ft) 730 670 1228 1687 <br /> Turn Bay Length(ft) 500 500 500 <br /> Base Capacity(vph) 2993 1458 2083 1458 1026 840 <br /> Starvation Cap Reductn 0 0 124 0 0 0 <br /> Spillback Cap Reductn 112 0 0 0 668 0 <br /> Storage Cap Reductn 0 0 0 0 0 0 <br /> Reduced v/c Ratio 0.99 1.47 1.55 0.04 0.97 1.37 <br /> Intersection Summary <br /> Volume exceeds capacity,queue is theoretically infinite. <br /> Queue shown is maximum after two cycles. <br /> # 95th percentile volume exceeds capacity,queue may be longer. <br /> Queue shown is maximum after two cycles. <br /> m Volume for 95th percentile queue is metered by upstream signal. <br /> Queues <br /> Fehr&Peers Page 3 <br />