2022 Construction Offroad Equipment <br /> Phase Name Offroad Equipment Amount Usage Hours Horse Power Load Factor Number of Diesel Fuel <br /> Type days Usage <br /> Demolition Excavators 3 8 158 0.38 47 3,386 <br /> Demolition Conrete 1 8 81 0.73 47 1,112 <br /> Industrial Saws <br /> Demolition Rubber Tired 2 8 247 0.40 47 3,715 <br /> Dozers <br /> Site Prep Tractors/Loaders 4 8 97 0.37 146 8,384 <br /> /Backhoes <br /> Site Prep Rubber Tired 3 8 247 0.40 146 17,310 <br /> Dozers <br /> Grading Excavators 2 8 158 0.38 68 3,266 <br /> Grading Rubber Tired 1 8 247 0.40 68 2,687 <br /> Dozers <br /> Grading Graders 1 8 187 0.41 68 2,085 <br /> Grading Tractors/Loaders 2 8 97 0.37 68 1,952 <br /> /Backhoes <br /> Grading Scrapers 21 8 367 0.48 68 9,583 <br /> TOTAL 53,481 <br /> Notes:Equipment assumptions are consistent with CaIEEMod.Fuel usage average of 0.05 gallons of diesel fuel per horsepower-hour is from the SCAQMD CEQA Air Quality Handbook,Table A9-3E. <br /> Trips and VMT <br /> Phase Name Daily Worker Trip Daily Vendor Total Hauling Days per Total Worker Total Vendor Total Haul Worker Trip Vendor Trip Haul Trip Total Worker Total Vendor Total Haul Trip Total Total <br /> Trip Trip Year Trips Trips Trips Length Length Length Trip Length Trip Length Length(miles) gallons of gallons of <br /> (miles) (miles) (miles) (miles) (miles) gasoline diesel <br /> Demolition 15 0 1250 47 705 0 1,250.00 10.80 7.30 15.00 7614 0 18,750.00 265 3,473 <br /> Site Preparation 16 0 0 146 2336 0 - 10.80 7.30 15.00 25228.8 0 - 879 0 <br /> Grading 100 1 0 0 68 6800 0 10.80 7.30 15.00 73440 0 21558 0 <br /> TOTAL 3,701 3,473 <br /> Notes:Consistent with CalEEMod,worker vehicles assumed to be gasoline and 50%LDA,25%LDT1,and 25%LDT2.Vendor and haul trips are assumed to be 100%diesel Heavy-Duty Trucks(T7). <br /> Number of Days Adjusted as demolition would occur over 2 years,but not at same degree year round <br /> Demolition <br /> Construction Start Date 1/1/2022 <br /> Construction End Date 3/8/2022 <br /> Total Work Days 47 <br /> Site Prep <br /> Construction Start Date 3/9/2022 <br /> Construction End Date 9/28/2022 <br /> Total Work Days 146 <br /> Grading <br /> Construction Start Date 9/28/2022 <br /> Construction End Date 12/31/2022 <br /> Total Work Days 68 <br />