Laserfiche WebLink
2024 Construction Offroad Equipment <br /> Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Number of Diesel Fuel <br /> days Usage <br /> Grading Excavators 2 8 158 0.38 50 2,402 <br /> Grading Rubber Tired Dozers 1 8 247 0.40 50 1,976 <br /> Grading Graders 1 8 187 0.41 50 1,533 <br /> Grading Tractors/Loaders/Ba 2 8 97 0.37 50 1,436 <br /> ckhoes <br /> Grading Scrapers 2 8 367 0.48 50 7,046 <br /> Building Construction Cranes 1 7 231 0.29 212 4,971 <br /> Building Construction Forklifts 3 8 89 0.20 212 4,528 <br /> Building Construction Generator Sets 1 8 84 0.74 212 5,271 <br /> Building Construction Tractors/Loaders/Ba 3 7 97 0.37 212 7,989 <br /> ckhoes <br /> Building Construction 1welders 1 11 8 461 0.451 2121 1,755 <br /> TOTALI 38,908 <br /> Notes:Equipment assumptions are consistent with CalEEMod.Fuel usage average of 0.05 gallons of diesel fuel per horsepower-hour is from the SCAQMD CEQA Air Quality Handbook,Table A9-3E. <br /> Trips and VMT <br /> Phase Name Daily Worker Trip Daily Vendor Total Hauling Days per Total Worker Total Vendor Total Haul Worker Trip Vendor Trip Haul Trip Total Worker Trip Total Vendor Trip Total Haul Trip Total Total <br /> Trip Trip Year Trips Trips Trips Length(miles) Length(miles) Length Length(miles) Length(miles) Length(miles) gallons of gallons of <br /> (miles) gasoline diesel <br /> Grading 100 0 0 50 5000 0 10.80 7.30 15.00 54000 0 1,770 <br /> Building Construction 280 100 0 212 59360 21200 10.80 7.30 1 15.00 641088 154760 21,019 26,954 <br /> TOTAL 22,789 26,954 <br /> Notes:Consistent with CalEEMod,worker vehicles assumed to be gasoline and 50%LDA,25%LDT1,and 25%LDT2.Vendor and haul trips are assumed to be 100%diesel Heavy-Duty Trucks(T7). <br /> Grading <br /> Construction Start Date 1/1/2024 <br /> Construction End Date 3/8/2024 <br /> Total Work Days 50 <br /> Building Construction <br /> Construction Start Date 3/9/2024 <br /> Construction End Date 12/31/2024 <br /> Total Work Days 212 <br />