My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013949
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2100
>
2600 - Land Use Program
>
RIVER ISLAND DSEIR
>
SU0013949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 1:39:33 PM
Creation date
2/22/2021 9:18:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013949
PE
2686
FACILITY_NAME
RIVER ISLAND DSEIR
STREET_NUMBER
2100
STREET_NAME
STEWART
City
LATHROP
Zip
95304-
APN
21325004
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
2100 STEWART
RECEIVED_DATE
2/19/2021 12:00:00 AM
P_LOCATION
07
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sshih
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2031 Construction Offroad Equipment <br /> Phase Name Offroad Equipment Amount Usage Hours Horse Power Load Factor Number of Diesel Fuel <br /> Type days Usage <br /> Building Construction Cranes 1 7 231 0.29 261 6,120 <br /> Building Construction Forklifts 3 8 89 0.20 261 5,575 <br /> Building Construction Generator Sets 1 8 84 0.74 261 6,490 <br /> Building Construction Tractors/Loader 3 7 97 0.37 261 9,836 <br /> s/Backhoes <br /> Building Construction Welders 1 8 46 0.45 261 2,161 <br /> TOTALI 30,181 <br /> Notes:Equipment assumptions are consistent with CalEEMod.Fuel usage average of 0.05 gallons of diesel fuel per horsepower-hour is from the SCAQMD CEQA Air Quality Handbook,Table A9-3E. <br /> Trips and V <br /> Phase Name Daily Worker Trip Daily Vendor Total Hauling Days per Total Worker Total Vendor Total Haul Worker Trip Vendor Trip Haul Trip Total Worker Total Vendor Total Haul Total Total <br /> Trip Trip Year Trips Trips Trips Length Length Length Trip Length Trip Length Trip Length gallons of gallons of <br /> (miles) (miles) (miles) (miles) (miles) (miles) gasoline diesel <br /> Building Construction 280 100 0 261 73080 26100 10.80 7.30 15.00 789264 190530 21,815 su,ia. <br /> TOTAL 21,815 30,181 <br /> Building Construction <br /> Construction Start Date 1/1/2031 <br /> Construction End Date 12/31/2031 <br /> Total Work Days 261 <br />
The URL can be used to link to this page
Your browser does not support the video tag.