Laserfiche WebLink
WOODARD <br /> ,L,CURRAN <br /> 5.2 Supply and Demand Comparison in Dry Years...............................................................................40 <br /> 5.2.1 Water Shortage Contingency Plan .......................................................................................43 <br /> 6. Non-Applicable Sections of Water Code 10910—10915..............................................................................44 <br /> 7. Conclusion.......................................................................................................................................................45 <br /> 8. References.......................................................................................................................................................46 <br /> APPENDICES <br /> Appendix A: River Islands Project Development Details <br /> Appendix B: City of Lathrop Updated Demand Projections (August 2020) <br /> Appendix C: River Islands Phase 1 Analysis <br /> LIST OF TABLES <br /> Table 1: Phase 2 Project Development at Buildout........................................................................................................6 <br /> Table 2: Proposed Phase 2 Project Development.........................................................................................................7 <br /> Table 3: Summary of City of Lathrop Potable Water Supply in Prior Years (2014-2018).............................................10 <br /> Table 4: Summary of Current(2019) City of Lathrop Water Supply.............................................................................11 <br /> Table 5: Lathrop SSJID Turnouts, Basis of Design......................................................................................................13 <br /> Table 6: Groundwater Production Well Capacities and Annual Yields.........................................................................15 <br /> Table 7: Current and Projected Potable Water Supply Entitlements(2020-2040).......................................................23 <br /> Table 8: Current and Projected Non-Potable Water Supply(2020-2040)....................................................................24 <br /> Table 9: SCWSP Projected Water Demands...............................................................................................................24 <br /> Table 10: SSJID SCWSP Supply Available Under Normal and Dry Year Conditions..................................................26 <br /> Table 11: SCWSP Supply Available to the City Under Normal and Dry Year Conditions............................................27 <br /> Table 12: Project Water Demand Factors....................................................................................................................31 <br /> Table 13: Project Phase 2 Water Demand Projections by Land Use...........................................................................32 <br /> Table 14: Project Potable and Non-Potable Demand by Land Use.............................................................................33 <br /> Table 15: Phase 2 Project Development Phasing by Land Use Category...................................................................33 <br /> Table 16: Phase 2 Project Phased Demand Projections.............................................................................................34 <br /> Table 17: 2002 Water Supply Assessment Projected Demand ...................................................................................35 <br /> Table 18: Comparison of 2002 WSA and Updated Demands......................................................................................35 <br /> Table 19: City of Lathrop Projected Demands through 2040.......................................................................................36 <br /> Table 20: Projected Potable Water Supply in Normal Years........................................................................................37 <br /> Table 21: Projected Potable Water Supply in Single-Dry Years..................................................................................38 <br /> Table 22: Projected Potable Water Supply in Multiple-Dry Years................................................................................39 <br /> Califia(0011533.00) ii Woodard&Curran, Inc. <br /> River Islands Phase 2 Development Water Supply Assessment September 2020 <br />