WOODARD <br /> &CURRAN <br /> Table 14: Project Potable and Non-Potable Demand by Land Use <br /> Total Demand % Demand for Non-Potable Potable Demand <br /> Land Use Category (gpd) Non-Potable Demand (gpd) (gpd) <br /> Water' <br /> Residential 2,493,994 NIA 0 2,493,994 <br /> Commercialz 116,609 15% 17,491 99,117 <br /> Schools 164,550 50% 106,958 57,593 <br /> Parks and Open Space 518,198 90% 466,378 51,820 <br /> Roadway Landscape Areas3 97,228 90% 87,505 9,723 <br /> Total 3,390,578 678 332 2,712,246 <br /> Project Demand(AFI) 3,798 760 3,038 <br /> Notes: <br /> 1. Non-potable water demand data provided by Califia,the Project developer(July 2020). <br /> 2. Commercial non-potable demand is for frontage landscaping and does not include on-site use. <br /> 3. Roadway landscape areas will be irrigated with non-potable water where access allows. <br /> 3.1.2.3 Project Development Phasing <br /> Based on information available at time of publishing, it is expected that the entire Project will be developed over the <br /> span of about 20 years,with the majority of development occurring approximately linearly through buildout(anticipated <br /> at 2040). Ten percent of the proposed low and medium density residential development is expected to be completed <br /> by 2025,with the remainder of the development progressing linearly from 2025 through buildout in 2040.Alternatively, <br /> approximately 60 percent of the proposed schools are anticipated to be completed by 2025, with the remaining <br /> constructed approximately linearly through buildout, and nearly 80 percent of proposed parks and open space areas <br /> are expected to be developed in the second half of project development, between 2030 and 2040. A complete <br /> breakdown of the anticipated phasing of the Project development and associated demands are presented in Table 15 <br /> and Table 16, respectively. <br /> Table 15: Phase 2 Project Development Phasing by Land Use Category <br /> Land Use Category 2020-2025 2025-2030 2030-2035 2035-2040 Buildout <br /> 2040 <br /> Residential units <br /> Low Density Residential 406 1,624 2,843 4,061 4,061 <br /> Medium Density Residential 315 1,260 2,205 3,150 3,150 <br /> High Density Residential 0 1,172 2,343 3,515 3,515 <br /> Non-Residential acres <br /> Commercial' 0 45.2 90.4 135.6 135.6 <br /> Schools 64.6 80.1 95.1 109.7 109.7 <br /> Parks and Open S ace2 8.8 38.4 99.0 159.6 159.6 <br /> Roadway Landscape Area3 6.8 35.1 63.4 91.6 91.6 <br /> Total acres 80 199 348 496 496 <br /> Total units 721 1 4,056 7,391 10,726 10,726 <br /> Source:Data provided by Califia,the Project developer(September 2020). <br /> Notes: <br /> 1. Includes the planned River Islands Town Center and Employment Center. <br /> 2. Includes only irrigated parks and open space areas. <br /> 3. Includes only irrigated roadway landscape areas. <br /> Califia(0011533.00) 33 Woodard&Curran, Inc. <br /> River Islands Phase 2 Development Water Supply Assessment September 2020 <br />