Laserfiche WebLink
WOODARD <br /> &CURRAN <br /> Table 22: Projected Potable Water Supply in Multiple-Dry Years <br /> Potable Water Water Right Reliability Allocation Contractual Entitlement AFY <br /> Source or Contract 2020 2025 2030 2035 2040 <br /> Multiple-Dry Years-First Year <br /> Current Supplies <br /> SCWSP Phase I SSJID Pre-1914 83-85%2 5,858 5,903 5,948 5,994 5,994 <br /> Contract' <br /> Groundwater N/A3 -- 100% 4,720 4,720 4,720 4,720 4,720 <br /> Anticipated Future Supplies <br /> SCWSP Phase 2 SSJID Pre-1914 83-85°/x2 -- -- -- -- 3,293 <br /> Contract4 <br /> Groundwater N/A5 -- 100% 0 0 0 0 0 <br /> Total 10,578 10,623 10,668 10,714 14,007 <br /> Multiple-Dry Years-Second Year <br /> Current Supplies <br /> SCWSP Phase II SSJID Pre-1914 83-85%2 6,027 6,073 6,119 6,167 6,167 <br /> Contract' <br /> Groundwater N/A3 -- 100% 4,720 4,720 4,720 4,720 4,720 <br /> Anticipated Future Supplies <br /> SCWSP Phase 2 SSJID Pre-1914 83-85%2 -- -- -- -- 3,388 <br /> Contract4 <br /> Groundwater N/A5 -- 100% 0 0 0 0 0 <br /> Total 10,747 10,793 10,839 10,887 14,275 <br /> Multiple-Dry Years-Third Year <br /> Current Supplies <br /> SCWSP Phase I SSJID Pre-1914 83-85%2 5,694 5,737 5,781 5,825 5,825 <br /> Contract' <br /> Groundwater N/A3 -- 100% 4,720 4,720 4,720 4,720 4,720 <br /> Anticipated Additional Future Supplies <br /> SCWSP Phase 2 SSJID Pre-1914 83-85°/x2 -- -- -- -- 3,201 <br /> Contract4 <br /> Groundwater N/A5 -- 100% 0 0 0 0 0 <br /> Total 10,414 10,457 10,501 10,545 13,746 <br /> Source:City of Lathrop 2019 WSMP,Table 5-10(EKI,2019) <br /> Notes: <br /> 1. The City's total Phase I allotment of SCWSP water,following the 2013 sale to the City of Tracy,is 6,887 AFY. <br /> 2. During multiple-dry years,the City expects to receive between 83%and 85%of its SCWSP water supply allocation in each of the three years. <br /> The City's projected SCWSP allocations are presented in Table 11. <br /> 3. Reflects the City's estimated groundwater yield for Wells 6,7,8 and 10. <br /> 4. The City's total Phase II allotment of SCWSP water,following the 2013 sale to the City of Tracy,is 10,671 AFY. <br /> 5. Potential additional groundwater supplies may be obtained through the Well 21 WTF upgrade,which could be completed in two phases. <br /> Phase 1 is anticipated to be completed by 2020 and Phase 2 is anticipated to be completed by 2025.Potential additional groundwater may <br /> also include bringing Well 9 back on-line. However,for this report,water from Well 21 and Well 9 are not included as Anticipated Additional <br /> Future Supplies. <br /> Califia(0011533.00) 39 Woodard&Curran, Inc. <br /> River Islands Phase 2 Development Water Supply Assessment September 2020 <br />