CaIEEMod Construction Phase Inputs* <br /> 5-Day Work Week/8 hours per day <br /> Adjusted Phasing for 20-Year Construction Period(2021-2040) <br /> Default Adjusted <br /> Demolition 10000 244 <br /> Site Preparation 6000 146 <br /> Grading 15500 378 <br /> Building Construction 155000 3782 <br /> Paving 11000 268 <br /> Arch Coating 11000 268 <br /> Construction Start Date 4/1/2021 <br /> Construction End Date 9/30/2040 <br /> Total Work Days 5087 <br /> CalEEMod Construction Schedule Inputs <br /> Phase Name Phase Type Start Date End Date CalEEMod Total Days <br /> Demolition Demolition 1/3/2022 3/30/2022 244 <br /> Site Preparation Site Preparation 3/31/2022 5/23/2022 146 <br /> Grading Grading 5/24/2022 10/5/2022 378 <br /> Building Construction Building Construction 10/6/2022 6/23/2026 3782 <br /> Paving Paving 6/24/2026 9/24/2026 268 <br /> Architectural Coating Architectural Coating 9/25/2026 12/30/2026 268 <br /> 5087 <br /> *Based on overall construction schedule of 20 years provided by the Applicant,CaIEEMod default phase lengths were normalized to meet this period <br />